74
EN
6.8
Boiler installation
OF-BF
boilers leave the factory with a paper template for installa-
tion onto a solid wall.
For installation:
– position the paper template (1) on the wall (2) where the boiler
is to be mounted
– make the holes and insert the expansion plugs (3)
– hook the boiler onto the plugs.
1
2
3
Fig. 26
m
CAUTION
The height of the boiler is to be such that disassembly
and maintenance interventions are facilitated.
6.9
Plumbing connections
The plumbing connections have the following characteristics and
dimensions.
95
65 65 65 65
=
=
L
M
U
G
E
R
Fig. 27
24 OF
Description
Climit
24 OF
M - System delivery
Ø 3/4" G
R - System return
Ø 3/4" G
U - Domestic hot water output
Ø 1/2" G
E - Domestic hot water inlet
Ø 1/2" G
G - Gas supply
Ø 3/4" G
W (mm)
450
24 BF
-
28 BF
-
38 BF
Description
Climit
24 BF
28 BF
38 BF
M - System delivery
Ø 3/4" G
R - System return
Ø 3/4" G
U - Domestic hot water output
Ø 1/2" G
E - Domestic hot water inlet
Ø 1/2" G
G - Gas supply
Ø 3/4" G
W (mm)
400
450
450
Содержание 24 BF
Страница 10: ...10 FR ...
Страница 49: ...49 FR ...
Страница 58: ...58 EN ...
Страница 97: ...97 EN ...
Страница 98: ...98 ...
Страница 99: ...99 ...
Страница 100: ...Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 ...
Страница 101: ...Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 ...
Страница 102: ...51 ...
Страница 103: ...50 ...
Страница 104: ...49 ...
Страница 143: ...10 ...