
P/N 89801, Rev. 1
Page 5
1.6
R
ISK ASSESSMENT CHECKLIST
The following checklist is not intended to be an all inclusive list of things to watch
out for when setting up and operating this Portable Machine Tool. However, these
checklists are typical of the types of risks the assembler and operator should con-
sider. Use these checklists as part of your risk assessment:
T
ABLE
1-1. R
ISK ASSESSMENT CHECKLIST BEFORE SET
-
UP
Before set-up
I took note of all the warning labels on the machine.
I removed or mitigated all identified risks (such as tripping, cutting, crushing, entan-
glement, shearing, or falling objects).
I considered the need for personnel safety guarding and installed any necessary
guards.
I created a lift plan, including identifying the proper rigging, for each of the setup
lifts required during the setup of the support structure and machine.
I located the fall paths involved in lifting and rigging operations. I have taken pre-
cautions to keep workers away from the identified fall path.
I considered how this machine operates and identified the best placement for the
controls, cabling, and the operator.
I evaluated and mitigated any other potential risks specific to my work area.
T
ABLE
1-2. R
ISK ASSESSMENT CHECKLIST AFTER SET
-
UP
After set-up
I checked that the machine is safely installed and the potential fall path is clear. If
the machine is installed at an elevated position, I checked that the machine is safe-
guarded against falling.
I identified all possible pinch points, such as those caused by rotating parts, and
informed the affected personnel.
I planned for containment of any chips or swarf produced by the machine.
I checked that all affected personnel have the recommended personal protective
equipment, as well as any site-required or regulatory equipment.
I checked that all affected personnel understand and are clear of the danger zone.
I evaluated and mitigated any other potential risks specific to my work area.
Содержание VM2050C
Страница 2: ......
Страница 4: ...Page B VM2050C 2150C Operating Manual CLIMAX GLOBAL LOCATIONS...
Страница 6: ...Page D VM2050C 2150C Operating Manual This page intentionally left blank...
Страница 8: ...Page ii VM2050C 2150C Operating Manual...
Страница 9: ...P N 89801 Rev 1 Page iii LIST OF FIGURES FIGURE PAGE 2 1 VM2050C 2150C components 9...
Страница 10: ...Page iv VM2050C 2150C Operating Manual...
Страница 12: ...Page vi VM2050C 2150C Operating Manual...
Страница 18: ...Page 6 VM2050C 2150C Operating Manual This page intentionally left blank...
Страница 21: ...P N 89801 Rev 1 Page 9 FIGURE 2 1 VM2050C 2150C COMPONENTS...
Страница 24: ...Page 12 VM2050C 2150C Operating Manual 2 3 SPECIFICATIONS TABLE 2 4 TECHNICAL DATA...
Страница 25: ...P N 89801 Rev 1 Page 13 TABLE 2 5 WEIGHTS...
Страница 26: ...Page 14 VM2050C 2150C Operating Manual This page intentionally left blank...
Страница 28: ...Page 16 VM2050C 2150C Operating Manual This page intentionally left blank...
Страница 31: ......
Страница 32: ......