NOTICE! Failure to remove shipping brackets from
spring-mounted compressors will cause excessive
noise, and could cause component failure due to
added vibration.
CAUTION!
All three phase scroll compressors must have
direction of rotation verifi ed at start-up. Verifi cation is
achieved by checking compressor Amp draw. Amp draw
will be substantially lower compared to nameplate values.
Additionally, reverse rotation results in an elevated sound
level compared to correct rotation. Reverse rotation will
result in compressor internal overload trip within several
minutes. Verify compressor type before proceeding.
CAUTION!
DO NOT store or install units in corrosive
environments or in locations subject to temperature or
humidity extremes (e.g., attics, garages, rooftops, etc.).
Corrosive conditions and high temperature or humidity can
signifi cantly reduce performance, reliability, and service
life. Always move and store units in an upright position.
Tilting units on their sides may cause equipment damage.
CAUTION!
CAUTION!
CAUTION!
CAUTION!
CUT HAZARD - Failure to follow this caution
may result in personal injury. Sheet metal parts may have
sharp edges or burrs. Use care and wear appropriate
protective clothing, safety glasses and gloves when
handling parts and servicing heat pumps.
Pre-Installation
Installation, Operation, and Maintenance instructions
are provided with each unit. Horizontal equipment
is designed for installation above false ceiling or in a
ceiling plenum. Other unit confi gurations are typically
installed in a mechanical room. The installation site
chosen should include adequate service clearance
around the unit. Before unit start-up, read all manuals
and become familiar with the unit and its operation.
Thoroughly check the system before operation.
Prepare units for installation as follows:
1. Compare the electrical data on the unit
nameplate with ordering and shipping
information to verify that the correct unit has been
shipped.
2. Keep the cabinet covered with the original
packaging until installation is complete and all
plastering, painting, etc. is fi nished.
3. Verify refrigerant tubing is free of kinks or dents
and that it does not touch other unit components.
4. Inspect all electrical connections. Connections
must be clean and tight at the terminals.
5. Remove any blower support packaging (water-to-
air units only).
6. Loosen compressor bolts on units equipped with
compressor spring vibration isolation until the
compressor rides freely on the springs. Remove
shipping restraints.
7. Some
airfl ow patterns are fi eld convertible
(horizontal units only). Locate the airfl ow
conversion section of this IOM.
8. Locate and verify any hot water generator (HWG),
hanger, or other accessory kit located in the
compressor section or blower section.