c l i m a t e m a s t e r.c o m
7
Tranquility
®
Compact High Capacity (TC_L) Series
R e v. : O c t o b e r 5 , 2 0 2 1
T H E S M A R T S O L U T I O N F O R E N E R G Y E F F I C I E N C Y
TC_LH072-120 Dimensional Data
Model
Overall Cabinet
Discharge Connections
Duct Flange
Water Connections
Electrical Knockouts
Return Air Connections
Using Return Air Opening
A
Depth
B
Width
C
Height
D
E
Supply
Depth
F
Supply
Width
G
Supply
Height
K
L
1
Water
Outlet
M
2
Water
Inlet
O
P
Q
R
S
Return
Depth
T
Return
Height
U
V
072-120 in.
36.3
84.9
21.6
14.0
17.0
13.5
7.8
15.0
8.3
4.0
2.0 18.8 16.8 13.8
65.0
18.0
1.0
18.9
cm.
92.2
215.6
54.9
35.6
43.2
34.3
19.8
38.1
21.1
10.2
5.1 47.8 42.7 35.1
165.1
45.7
2.5
48.0
LEFT RETURN STRAIGHT DISCHARGE
CAP
CAP
FRONT
BSP
A
EAP
CBP
B
C
O
PQR
K
M
F
G
E
D
BSP
RIGHT RETURN STRAIGHT DISCHARGE
1
EAP
2
CAP
CAP
2
FRONT
CBP
1
5
4
LEGEND
CAP=Compressor Access Panel
CBP=Control Box Panel
BSP=Blower Service Panel
EAP=Expansion Valve Access panel
1=Water Outlet 1-1/4” FPT (072-096) 1-1/2” FPT (120)
2=Water Inlet 1-1/4” FPT (072-096) 1-1/2” FPT (120)
3=Condensate 3/4” FPT
4=High Voltage 1-1/8” [2.9cm] KO
5=Low Voltage 7/8” [2.2cm] KO
HANGER BRACKET DIMENSIONS
87”
[221cm]
1.0”
[2.54cm]
PLAN VIEW
TOP
4.3”
[10.8cm]
34.1”
[86.6cm]
FRONT
CONTROL BOX
U
T
S
V
1.3”
[3.3cm]
condensate
LEFT RETURN LEFT VIEW-
AIR COIL SIDE
LEFT RETURN END DISCHARGE
CBP
EAP
BSP
CAP
CAP
FRONT
E
D
F
G
CAP
CBP
CAP
EAP
BSP
FRONT
FRONT
CONTROL BOX
PLAN VIEW
TOP
V
S
U
RIGHT RETURN RIGHT VIEW-
AIR COIL SIDE
RIGHT RETURN END DISCHARGE
1.3”
[3.3cm]
condensate drain
3
NOTES:
-
All dimensions in table are inches (cm).
1. Service a
ccess is required for all removable panels and installer should take care to comply with all building codes and
allow
adequate clearance for future field service.
2.
Water inlet and water outlet connections are available on either side (left or right) of the unit. Qty (2x) MPT Plugs are
shipped loose in a plastic bag tied to the water leg in front of the unit. Installer must plug water inlet/outlet side not being
connected to.
3. Condensate drain is 3/4" FPT and is located on cabinet end opposite the compressor.
4.
Electrical access is available on either side (left or right) of the front.
5.
Electric box is on right side. It can be field converted to left side. Conversion should only be attempted by qualified
service technician. If electric box relocated to opposite side, and water connected to opposite side, then this access is
not required.
6.
Units require 3’ (9.1 cm) clearance for water connections, CAP, C
B
P, EAP and BSP service access.
7.
Overall cabinet width dimensions does not include filter rail and duct flange.
8. Units are shipped with air filter rails that are not suitable for supporting return air ductwork. An air filter frame with duct
mounting collar is available as an accessory.
SERVICE ACCESS
3’ (91 cm.)
Note 5, 6
Note 6
Note 6
Note 6
ALL CONFIGURATIONS REQUIRE SERVICE ACCESS AREA
DESCRIBED IN NOTES 5 AND 6.
LEFT RETURN STRAIGHT DISCHARGE
CAP
CAP
FRONT
BSP
A
EAP
CBP
B
C
O
PQR
K
M
F
G
E
D
BSP
RIGHT RETURN STRAIGHT DISCHARGE
1
EAP
2
CAP
CAP
2
FRONT
CBP
1
5
4
LEGEND
CAP=Compressor Access Panel
CBP=Control Box Panel
BSP=Blower Service Panel
EAP=Expansion Valve Access panel
1=Water Outlet 1-1/4” FPT (072-096) 1-1/2” FPT (120)
2=Water Inlet 1-1/4” FPT (072-096) 1-1/2” FPT (120)
3=Condensate 3/4” FPT
4=High Voltage 1-1/8” [2.9cm] KO
5=Low Voltage 7/8” [2.2cm] KO
HANGER BRACKET DIMENSIONS
87”
[221cm]
1.0”
[2.54cm]
PLAN VIEW
TOP
4.3”
[10.8cm]
34.1”
[86.6cm]
FRONT
CONTROL BOX
U
T
S
V
1.3”
[3.3cm]
condensate
LEFT RETURN LEFT VIEW-
AIR COIL SIDE
LEFT RETURN END DISCHARGE
CBP
EAP
BSP
CAP
CAP
FRONT
E
D
F
G
CAP
CBP
CAP
EAP
BSP
FRONT
FRONT
CONTROL BOX
PLAN VIEW
TOP
V
S
U
RIGHT RETURN RIGHT VIEW-
AIR COIL SIDE
RIGHT RETURN END DISCHARGE
1.3”
[3.3cm]
condensate drain
3
NOTES:
-
All dimensions in table are inches (cm).
1. Service a
ccess is required for all removable panels and installer should take care to comply with all building codes and
allow
adequate clearance for future field service.
2.
Water inlet and water outlet connections are available on either side (left or right) of the unit. Qty (2x) MPT Plugs are
shipped loose in a plastic bag tied to the water leg in front of the unit. Installer must plug water inlet/outlet side not being
connected to.
3. Condensate drain is 3/4" FPT and is located on cabinet end opposite the compressor.
4.
Electrical access is available on either side (left or right) of the front.
5.
Electric box is on right side. It can be field converted to left side. Conversion should only be attempted by qualified
service technician. If electric box relocated to opposite side, and water connected to opposite side, then this access is
not required.
6.
Units require 3’ (9.1 cm) clearance for water connections, CAP, C
B
P, EAP and BSP service access.
7.
Overall cabinet width dimensions does not include filter rail and duct flange.
8. Units are shipped with air filter rails that are not suitable for supporting return air ductwork. An air filter frame with duct
mounting collar is available as an accessory.
SERVICE ACCESS
3’ (91 cm.)
Note 5, 6
Note 6
Note 6
Note 6
ALL CONFIGURATIONS REQUIRE SERVICE ACCESS AREA
DESCRIBED IN NOTES 5 AND 6.
LEFT RETURN STRAIGHT DISCHARGE
CAP
CAP
FRONT
BSP
A
EAP
CBP
B
C
O
PQR
K
M
F
G
E
D
BSP
RIGHT RETURN STRAIGHT DISCHARGE
1
EAP
2
CAP
CAP
2
FRONT
CBP
1
5
4
LEGEND
CAP=Compressor Access Panel
CBP=Control Box Panel
BSP=Blower Service Panel
EAP=Expansion Valve Access panel
1=Water Outlet 1-1/4” FPT (072-096) 1-1/2” FPT (120)
2=Water Inlet 1-1/4” FPT (072-096) 1-1/2” FPT (120)
3=Condensate 3/4” FPT
4=High Voltage 1-1/8” [2.9cm] KO
5=Low Voltage 7/8” [2.2cm] KO
HANGER BRACKET DIMENSIONS
87”
[221cm]
1.0”
[2.54cm]
PLAN VIEW
TOP
4.3”
[10.8cm]
34.1”
[86.6cm]
FRONT
CONTROL BOX
U
T
S
V
1.3”
[3.3cm]
condensate
LEFT RETURN LEFT VIEW-
AIR COIL SIDE
LEFT RETURN END DISCHARGE
CBP
EAP
BSP
CAP
CAP
FRONT
E
D
F
G
CAP
CBP
CAP
EAP
BSP
FRONT
FRONT
CONTROL BOX
PLAN VIEW
TOP
V
S
U
RIGHT RETURN RIGHT VIEW-
AIR COIL SIDE
RIGHT RETURN END DISCHARGE
1.3”
[3.3cm]
condensate drain
3
NOTES:
-
All dimensions in table are inches (cm).
1. Service a
ccess is required for all removable panels and installer should take care to comply with all building codes and
allow
adequate clearance for future field service.
2.
Water inlet and water outlet connections are available on either side (left or right) of the unit. Qty (2x) MPT Plugs are
shipped loose in a plastic bag tied to the water leg in front of the unit. Installer must plug water inlet/outlet side not being
connected to.
3. Condensate drain is 3/4" FPT and is located on cabinet end opposite the compressor.
4.
Electrical access is available on either side (left or right) of the front.
5.
Electric box is on right side. It can be field converted to left side. Conversion should only be attempted by qualified
service technician. If electric box relocated to opposite side, and water connected to opposite side, then this access is
not required.
6.
Units require 3’ (9.1 cm) clearance for water connections, CAP, C
B
P, EAP and BSP service access.
7.
Overall cabinet width dimensions does not include filter rail and duct flange.
8. Units are shipped with air filter rails that are not suitable for supporting return air ductwork. An air filter frame with duct
mounting collar is available as an accessory.
SERVICE ACCESS
3’ (91 cm.)
Note 5, 6
Note 6
Note 6
Note 6
ALL CONFIGURATIONS REQUIRE SERVICE ACCESS AREA
DESCRIBED IN NOTES 5 AND 6.