22
Maintenance
The following periodic maintenance is the suggested minimum requirements and minimum intervals;
accumulated hours or monthly period, which ever comes sooner. If you hear a noise or see any
indication of impending failure -
cease operation immediately
– inspect, correct and / or replace
parts as required.
WARNING OSHA
REQUIRES
USERS TO INSPECT LIFTING EQUIPMENT AT THE
START OF EVERY SHIFT. THESE AND OTHER PERIODIC INSPECTIONS ARE
THE RESPONSIBILITY OF THE USER.
IMPORTANT!
1.
Keep maintenance area clear.
2. During maintenance, always turn off the main power switch before
enter the working area.
DAILY PRE-OPERATION CHECK
The user should perform daily check.
ATTENTION! Daily check of safety latch system is very important. The discovery of device
failure before
it happens
could save you from expensive property damage, lost production time,
serious personal injury and even death.
●
Check safety lock audibly and visually while in operation
●
Check safety latches for free movement and
full engagement with rack.
●
Check hydraulic connections, and hoses for leakage.
●
Check connections, bends, cracks ,and looseness
●
●
Check snap rings at all rollers and sheaves.
●
Check bolts, nut, and screws and tighten.
●
Check wiring & switches for damage.
Keep base plate free of dirt, grease or any other corrosive substances.
REV A-082913
Содержание HR6K-70
Страница 2: ...HR6K 70 6600 lb Capacity High Rise Scissor Lift Operation Manual REV A 082913 ...
Страница 3: ......
Страница 13: ...12 SIZE DATA Fig 1 REV A 082913 ...
Страница 30: ...29 PARTS DRAWING FRAME REV A 082913 ...
Страница 35: ...34 HYDRAULIC HOSE CONNECTING DIAGRAM REV A 082913 ...
Страница 36: ......