Clevertest and Clevertest Plus
Refer to the supplementary operation guide supplied with the Product.
After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red
flashing for a period up to 2 minutes.
Clevertest Essential
Refer to the supplementary operation guide supplied with the Product.
Zoneworks and DATA Monitored Options
Cleverfits with part numbers -ZW
, -DATA
are fitted with Zoneworks communications modules (nodes).
These fittings are monitored using either Powerline Carrier Technology that utilising the power cable to
provide data communication or a dedicated data cable to/from data routers installed on a dedicated data
trunk connected to a central Server (can also be connected via Ethernet/Internet/Fibre). Zoneworks
software on the server is used to monitor, coordinate testing and collate test data from each fitting.
Zoneworks Cleverfits can be commissioned by a single push of the test switch or scanning of the supplied
barcode. The LED Test Switch indicator provides a multifunction indication of the status of the fitting during
testing and normal operation:
State
LED Operation
Commissioned
LED on Solid (Green)
Un-commissioned
LED flashes at 0.5Hz (0.5s Green, 0.5s Yellow)
Emergency Light Test In Progress
LED flashes at 3s On (Yellow) & 0.5s Off
In the case of the DATA version a 2-
way “figure 8” cable and terminal block facilitates the connection to
the DATA network via a multi-drop bus (daisy chain connection). For further information of installation of
a Zoneworks LW system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl.
DATA version)
DALI EM Option
Cleverfits with part numbers
-DALI
are fitted with DALI modules (nodes) that facilitate connection and
integration to 3
rd
Party Lighting Control Systems. Before installing the fitting please confirm that the
Lighting Control System has the capability to monitor DALI Emergency Luminaires. The fitting will be
addressed and configured into the control system by the Lighting Control System Commissioning
Technicians and not Clevertronics.
State
LED Operation
Commissioned/ Un-commissioned
LED on Solid (Green)
Emergency Light Test in progress
LED flashes at 1s On (Yellow) & 1s Off
“IDENTIFY COMMAND”
Fitting goes into emergency mode for 10 seconds
A 2-
way “figure 8” cable and terminal block facilitates the connection to the DALI network. DALI
connections are marked as Da Da.
L10
™ Cleverfit LED Exit
Installation & Maintenance Instruction Leaflet
Victoria (Head Office & Manufacturing)
195 Chesterville Rd
Moorabbin VIC 3189
Phone:
+61 3 9559 2700
Fax:
+61 3 9559 2799
New South Wales
Phone:
+61 2 8805 6400
Fax:
+61 2 8805 6444
Queensland
Phone:
+61 7 3442 9700
Fax:
+61 7 3442 9777
South Australia/Northern Territory
Phone:
+61 8 8301 8800
Fax:
+61 8 8351 8286
Western Australia
Phone:
+61 8 9248 3720
Fax:
+61 8 9248 3725
New Zealand
Phone: +64 800 548 448
Designed in Australia to comply with the requirements of
AS2293.3: 2005 and AS/NZS CISPR15: 2011
NOTE: Standard product codes with this symbol are
enabled with Clevertest Plus capability. Please refer to the
operation guide supplied with the product for details.
Models:
LCFLED-xx-zz
CleverFit Exit
LCFLED-TH-xx-yy
CleverFit Theatre Exit
Testing:
Options:
Running Man
yy=R
Manual Test
xx = Blank
Running Man Left Arrow
yy=RL
Zoneworks
xx = ZW
Running Man Right Arrow yy=RR
Z/W DATA
xx = DATA
Double sided R/M
yy=DS-R
DALI Comp
xx = DALI
Double sided R/M Arrow
yy=DS-RAOW
Clevertest Essential xx = CTE
Black Colour
zz = BLK
Clevertest
xx = CT
(NOTE: -CT Products supplied with the Clevertest Plus Symbol are
activated with Clevertest PLUS capability. Please refer to the operation
guide supplied with the product for details).
Spare Parts:
1530090
BATTERY: L10 3.3V 2.5AH 390mm lead,noBRKT
8002430
PCA:Duris P5 6 LED Strip.L10,#CT10166-D1
8002321
PCA: LCFLED CT10164-L6 6C70 CTP DALI-COMP ZW AU
Important:
It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before installation,
ensure that the electricity supply has been switched off and isolated. Installation must be carried out in
accordance with the relevant Australian and International Standards.