![Clevertronics FBKLED Series Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/clevertronics/fbkled-series/fbkled-series_installation-and-maintenance-instruction-manual_2623514002.webp)
1949357
V2.0
August 2020
Installation:
The LED Bunkalite (FBKLED) can be installed either Ceiling or Wall Mounted.
•
Remove the four (4) screws holding the ring to the fitting.
•
Remove the four (4) screws holding the gear tray to the base.
•
At this point you must decide if the supply cable entry will be via the entry point provided, in the
channel recess between the outer-rim and the base, or if a new cable entry is to be drilled into the
rear of the base. NOTE: if you choose to use the cable entry point provided the luminaire cannot be
positioned/centred over the supply cable point on the wall or ceiling. The supply cable must line up
with the recessed channel as shown below.
•
Using the base as a guide, mark 2 holes for mounting and one for mains access.
•
Mount the base using appropriate fixings and seal these fixings with silicone (fill any additional entry
points with silicone also)
•
Route the power inside the base.
•
Connect the 240VAC (A, E, N) supply to the terminal block of the gear tray.
•
Connect the DALI Lines to the terminals marked “DA DA” on the gear tray.
•
Install the gear tray to the base.
•
Apply power to the fitting and test per the instructions.