CleverEVAC Blade Surface Mount Instructions
1942490 V1.0
June 2021
Mounting Points and dimension
Mount the base of the enclosure using appropriate fixing.
Route the mains connection. Terminate the supply cables to the unswitched Live L, Neutral N & Earth E
Route 24/VF control cables through the access hole and connect to the terminal block as per next step.
Connect positive signal of RED activation to I2 and negative signal to C (Common
). **only applicable for DYR
product**
Connect positive signal of GREEN activation to I1 and negative signal to C (Common).
Connect the mains loom connector from bracket to the Fitting.
Reinstall the Fire Panel terminal block to fitting. Make sure to align the orientation of the terminal block.
Place the fitting into enclosure (1) and secure using two screws (2). Add the top cover to the fitting (3)