Cleveland Convotherm OEB-6.10 Скачать руководство пользователя страница 5

Cleveland

Project  ________________________________

Item  __________________________________

Quantity _______________________________  

FCSI Section  ____________________________

Approval  _______________________________

Date  __________________________________

1333 East 179 St.,

Cleveland, Ohio, U.S.A. 44110 

Tel: 1-216-481-4900

Fax: 1-216-481-3782

Web Site: www.ClevelandRange.com

Email: [email protected]  

 

COMBI OVEN-STEAMER
Stacking Kits for Electric Table Type Models
(OEB 6.10 on OEB 6.10 or OES 6.10 on OES 6.10)

SECT.

IIB

PAGE 

5E

0707

by

by

Cleveland

Cleveland

Model #

Description

CSTK-610

for mounting two 6.10 models

CSTK-610CA

for mounting two 6.10 models (with casters)

6.00"

7

8

RC

CS

W1

W2

D

4.38"

39.50"

4

NOTE: Overall height of unit does not change for units with casters.

U

37.83"

LEFT SIDE VIEW

36.70"

1.58"

1.82"

2.52"

RC

CS

W1

W2

D

RC

CS

W1

W2

D

NOTE: Overall height of unit does not change for units with casters.

4.38"

38.08"

2

8

.4

3

5.00"

6

7

.8

5

"

2

8

.4

3

6.00"

7

8

.0

0

(M

IN

.H

O

O

D

R

E

Q

U

IR

E

M

E

N

T

)

UNIT A

UNIT B

UNIT A

UNIT B

R

6.10
on 6.10
ELEC

6

UTILITIES

(Utility connection shown below are listed per unit)

Required Clearances:

Rear - 2", Left Side - 4", Right Side - 2 1/2"

• Allow for sufficient distance if a "high heat source" (i.e. Broiler) is located next to 

the unit.

• Allow for sufficient clearance on left side for service access (contact the factory

service department for recommendations).

• Installation must comply with all local fire and health codes.

Electrical Requirements:

Do not connect to a G.F.I. outlet.

BOILER

UNIT A

- OEB-6.10

UNIT B

- OEB-6.10

MODELS

208/3/60 240/3/60

440/3/60 480/3/60

208/3/60 240/3/60 440/3/60 480/3/60

Total Connected Load: 

9.9 KW

12.8 KW

11 KW

13.1 KW

9.9 KW

12.8 KW

11 KW

13.1 KW

Hot Air: 

8.6 KW

11.4 KW

9.1 KW

10.2 KW

8.6 KW

11.4 KW

9.1 KW

10.2 KW

Steam Generator:

7.7 KW

10.2 KW

8.6 KW

10.2 KW

7.7 KW

10.2 KW

8.6 KW

10.2 KW

Amps per Phase:

27.3

30.8

15.2

16.3

27.3

30.8

15.2

16.3

BOILERLESS

UNIT A

- OES-6.10

UNIT B

- OES-6.10

MODELS

208/3/60 240/3/60

440/3/60 480/3/60

208/3/60 240/3/60 440/3/60 480/3/60

Total Connected Load:

9.9 KW

12.8 KW

11 KW

13.1 KW

9.9 KW

12.8 KW

11 KW

13.1 KW

Hot Air:

8.6 KW

11.4 KW

9.1 KW

10.2 KW

8.6 KW

11.4 KW

9.1 KW

10.2 KW

Amps per Phase:

27.3

30.8

15.2

16.3

27.3

30.8

15.2

16.3

W1

W2

D

RC

S

CS

AV

G

E1

Water Connections:

Cold Water (drinking water quality)

Flow Pressure:

30 - 60 PSI

Water Inlets:

3/4" GHT-F (Female Garden Hose

Connection)

Treated Water for Steam Generator

Untreated Water for Condenser

Drain Connection:

2" Tube

Venting:

Exhaust Hood required

*Connection for Cleaning Solution

*Connection for Rinse Cycle

*

Available as an option

Note:

For additional connection details, 

see spec sheet for each individual 

combi model to be stacked.

W1

W2

D

RC

S

CS

AV

G

W1

W2

D

RC

S

CS

AV

G

E1

E2

W1

W2

D

RC

S

CS

AV

G

E1

E2

W1

W2

D

RC

S

CS

AV

W1

W2

D

RC

S

CS

AV

G

Содержание Convotherm OEB-6.10

Страница 1: ...source i e Broiler is located next to the unit Allow for sufficient clearance on left side for service access contact the factory service department for recommendations Installation must comply with...

Страница 2: ...nt distance if a high heat source i e Broiler is located next to the unit Allow for sufficient clearance on left side for service access contact the factory service department for recommendations Inst...

Страница 3: ...for sufficient distance if a high heat source i e Broiler is located next to the unit Allow for sufficient clearance on left side for service access contact the factory service department for recommen...

Страница 4: ...ight Side 2 1 2 Allow for sufficient distance if a high heat source i e Broiler is located next to the unit Allow for sufficient clearance on left side for service access contact the factory service d...

Страница 5: ...ervice access contact the factory service department for recommendations Installation must comply with all local fire and health codes Electrical Requirements Do not connect to a G F I outlet BOILER U...

Страница 6: ...on left side for service access contact the factory service department for recommendations Installation must comply with all local fire and health codes Electrical Requirements Do not connect to a G...

Страница 7: ...for service access contact the factory service department for recommendations Installation must comply with all local fire and health codes Electrical Requirements Do not connect to a G F I outlet BO...

Страница 8: ...nit Allow for sufficient clearance on left side for service access contact the factory service department for recommendations Installation must comply with all local fire and health codes Electrical R...

Отзывы: