background image

GAS

ELECTRIC

COLD WATER

CLEARANCE

DRAINAGE

1

1

4

˝ IPS line size, 

3

4

˝ (13mm) connection 

120V-1Phase, 60 Hz.

35 psi minimum

RIGHT = 12.00˝

1

1

2

˝ dia.

NATURAL

PROPANE

BTU 

2 Blowers & Controls

60 psi maximum

LEFT = 3.00˝

Do not connect other

Piping 

3

4

˝ N.P.T.

Piping 

3

4

˝ N.P.T.

35,000 each

150 watts each

C2 

3

8

˝ dia. NPT for Generator

REAR = 3.00˝

units to this drain

Supply pressure

Supply pressure

Generator,

C1 

3

8

˝ dia. NPT for Condenser

Allow 6˝ space min.

4.50˝ W.C. Min.

11.00˝ W.C. Min.

70,000 total

from rear and sides

Drain must be vented

14.00˝ W.C. Max.

14.00˝ W.C. Max.

When located near 

combustible walls

Do not use PVC pipe

Manufacturer must be notified if unit will
be used above 2,000 feet

(NOT TO SCALE)

SECT.

IV

PAGE 

12

0402

Litho in U.S.A.

Each Compartment has Capacity for:
• Three  2

1

2

˝ x 12˝ x 20˝ Steam Table Pans

• Six 

1˝ x 12˝ x 20˝

Steam Table Pans

• Two 

4˝ x 12˝ x 20˝

Steam Table Pans

C

NOTES:

Cleveland Range reserves right of design improvement or modification, as warranted.
Many regional, state and local codes exist and it is the responsibility of the owner and installer to comply with the codes.
Cleveland Range equipment is built to comply with applicable standards for manufacturers. Included among those approval agencies are UL/NSF#4 and CSA (AGA, CGA).

D

WATER QUALITY 

REQUIREMENTS

The quality of water varies
greatly from region to
region. Steam equipment
generators must be
drained daily and chemi-
cally descaled periodically
to ensure proper operation.
To minimize service prob-
lems caused by the accu-
mulation of minerals and
chemicals in water review
the following quality guide-
lines with a local water
treatment specialist. Inlet
water that is beyond these
specified guidelines should
be treated to achieve these
acceptable limits.

Total

Dissolved Solids less than
60 ppm, Alkalinity less than
20 ppm, Silica less than 13
ppm, pH factor greater
than 7.5, Chlorine less
than 30 ppm.

Right - 3”, Left - 3”, 
Rear -3”

(12” on control side if
adjoining wall or 
equipment is over 30”
high for service access)

Contact factory 
for variances to 
clearances.

Отзывы: