3.1
Installation in brief
Step 1:
C-Post piling
Step 2:
Post brace and head installation
Step 3:
Pre-assembled support installation
Step 4:
T-Rail 110 installation
Step 5:
PV modules installation
Note: See steps below before beginning
double support installation. It is similar to
the single support systems.