Clenergy PV-ezRack SolarTerrace II Скачать руководство пользователя страница 10

 

 

PV-ezRack Solar Terrace II_Planing and Installation Guide_V1.3 

Page 10 of 11

 

 

11/20 Duerdin St 

 

 

Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

 

Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

Email: [email protected] 

 
 

5

 Mount the rails

 

Mark  the  panel  array 
perimeter  and  attach 

the  T-Rail to Tri-groove 
Beam  with  one  T-Rail 

Clamp on each side.    

 

     

  

 

6

 Mount the panels

 

Install  the  panels  by 
using 

the 

patented 

Clenergy  End  Clamps 
and 

Inter 

Clamps. 

Fasten 

them 

by 

Hexagonal Bolt using 
15-20Nm torque. 

 

   

 

End Clamp         Middle Clamp    

The installation of the 

panels is completed. 

 

Содержание PV-ezRack SolarTerrace II

Страница 1: ... 6688 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au PV ezRack SolarTerrace II Code Compliant Planning and Installation Complying with AS NZS1170 2 2011 Amdt 3 2013 Contents 1 Introduction 2 2 Installation Tools Components 3 3 Installation Guide 7 4 Service 11 ...

Страница 2: ...equate and will meet the local standards During the installation and especially when working on the roof inform yourself about the appropriate safety regulations and please also pay attention to the relevant regulations of your local region Please check that you are using the current version of the installation manual by contacting Clenergy Australia by email on sales clenergy com au or your local...

Страница 3: ... 9017 6668 www clenergy com au Email sales clenergy com au 2 Installation tools components 1 Installation tools Hydraulic Pile Driver Allen Key Power Tool Maximum torque M8 20N m M10 30N m M12 50N m Adjustable Spanner String 2 Components list Overview of system components End Clamp Middle Clamp T Rail Rail Clamp Girder Post Head C Post Post Brace ...

Страница 4: ... Installation Guide_V1 3 Page 4 of 11 11 20 Duerdin St Tel 61 3 9017 6688 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au 3 Overview of system components T Rail Girder Post Head Post Brace Post ...

Страница 5: ... Tel 61 3 9017 6688 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au 4 Mounting of the single assembly groups Step 1 Pole grounding Step 2 Mounting top and side brackets Step 3 Fixing the structure Step 4 Mounting the T Rails Step 5 Module mounting ...

Страница 6: ...0 Duerdin St Tel 61 3 9017 6688 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au Angle positioning STII Panel dimension up to 1 7m Wind Zone Region A Region B Region C Region D Wind Speed m s 41 48 56 66 Leg Spacing m 3 3 2 85 2 05 1 45 ...

Страница 7: ...steps installation Instruction 1 Install the Open Post Before the installation prepare all the products and installation tools that will be needed Confirm the hydraulic pile driver can be used at the site Mark the Open Posts array perimeter Drive the piles into the earth Use a string to make sure all the piles are in a same line and height 2 Mount Post Head Install the Post Head fix with Hexagonal...

Страница 8: ...y com au Email sales clenergy com au 3 Mount Post Brace Insert the Post Brace on one side of Post Then fold it and fix it to the post with Hexagonal Bolt and Nut 4 Attach the Girder Attach the Girder on to the Post Head The fixing arm in the Post had will click on to the bolt on the Girder Connect the Support Tube to the Post Brace and fix using Hexagonal Bolt and Nut ...

Страница 9: ... 6688 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au After installing the Girder adjust the system to make sure all the Tri groove Beams are in a same line and height Notes Make sure the Tri groove Beams are all positioned the same before installing the T Rail ...

Страница 10: ...com au Email sales clenergy com au 5 Mount the rails Mark the panel array perimeter and attach the T Rail to Tri groove Beam with one T Rail Clamp on each side 6 Mount the panels Install the panels by using the patented Clenergy End Clamps and Inter Clamps Fasten them by Hexagonal Bolt using 15 20Nm torque End Clamp Middle Clamp The installation of the panels is completed ...

Страница 11: ...inished Aluminium www aamanet org are not followed by Purchaser This Warranty does not cover damage to the Product that occurs during its shipment storage or installation This Warranty shall be VOID if installation of the Product is not performed in accordance with Clenergy s written installation instructions or if the Product has been modified repaired or reworked in a manner not previously autho...

Отзывы: