11 / 13
Clenergy China
Tel86 592 311 0088
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Fac86 592 599 5028
Xiang'an District 361101, Xiamen, Fujian, China
corresponding positions
in Figure 10. The gap of
ear plate needs HDPE
Washer.
Use
a
professional
tool
to
rotate the HDPE Bolt
45° to lock it.
4.4.3 For each bolt and
nut connection point,
use professional tools
to lock the bolts and
nuts first, and then use
the electric drill to drill
the Self-drilling screw
ST6.3*25 through the
bolts and nuts, and
connect the two
together, as shown in
Figure 11.
Figure 10
Figure 11
4.5 PV Modules Installation
4.5.1 Place the PV
Module frame into the
open slot of the Rear
Clamp, as shown in
Figure 12. Adjust the
position
of
the
PV
Module to ensure that
the
left
and
right
dimensions
are
the
same, and then lock the
M8 bolt and nut .The
Figure 12