corresponding  positions 

in Figure 10. The gap of 

ear  plate  needs  HDPE 

Washer. 

Use 

professional 

tool 

to 

rotate  the  HDPE  Bolt 

45° to lock it. 

4.4.3 For each bolt and 

nut connection point, 

use professional tools 

to lock the bolts and 

nuts first, and then use 

the electric drill to drill 

the Self-drilling screw 

ST6.3*25 through the 

bolts and nuts, and 

connect the two 

together, as shown in 

Figure 11.

 

 Figure 10 

 

Figure 11 

4.5 PV Modules Installation

 

4.5.1  Place  the  PV 

Module  frame  into  the 

open  slot  of  the  Rear 

Clamp,  as  shown  in 

Figure  12.  Adjust  the 

position 

of 

the 

PV 

Module  to  ensure  that 

the 

left 

and 

right 

dimensions 

are 

the 

same, and then lock the 

M8  bolt  and  nut  .The 

 

Figure 12

 

 
 

Содержание PV-ezRack SolarFloating I

Страница 1: ...na Telephone 86 592 311 0088 999 1009 Min an Rd Huoju Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn PV ezRack SolarFloating I Instal...

Страница 2: ...iate local safety regulations and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The ins...

Страница 3: ...areness establish the idea of safety first have a strong sense of responsibility and find timely handling and reporting of safety hazards to ensure smooth construction 2 Tools and Components 2 1 Tools...

Страница 4: ...ales clenergy com cn 2 2 Components Components ER SFI MF Main Floater ER SFI AF D Aisle Floater Double ER SFI RS Rear Support Leg ER SFI FS Front Support Leg ER SFI CB Connect Bolt ER SFI CN Connect N...

Страница 5: ...lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 3 2 1 Reduce the friction coefficient Ensure that the thread surface is clean no dirt or contaminant Apply lubricant...

Страница 6: ...d in engineering drawings As a result major components of the SolarFloating may be provided in sectional sizes and lengths that vary from those shown in this guide The installation operations detailed...

Страница 7: ...tion the scaffolding type is adopted and then laying wooden boards or laying the board directly after the shore is flat requires a certain roughness but no sharp protrusion Construction platform size...

Страница 8: ...stallation 4 1 1 Place the Main Floater flat on the ground as shown in Figure 1 4 1 2 Insert the Front and Rear Support Leg into the hexagonal mounting hole of the Main Floater as shown in Figure 2 4...

Страница 9: ...28 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn Figure4 4 2 Rear Clamp Installation 4 2 1 Lock the Rear Clamp on the support leg and do not lock the bolt and nut temporarily for...

Страница 10: ...strict 361101 Xiamen Fujian China sales clenergy com cn Figure 6 4 3 Connect Two Main Floaters 4 3 1 Use one Aisle Floater to connect the two Main Floaters together and lock them with bolts and nuts P...

Страница 11: ...n use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and connect the two together as shown in Figure 8 Figure 7 Figure 8 4 4 Peripheral Aisle Floater Installat...

Страница 12: ...For each bolt and nut connection point use professional tools to lock the bolts and nuts first and then use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and...

Страница 13: ...aining PV Modules Figure 13 is the installation effect of a 1 2 unit Figure 13 4 6 Connect the Floating System and Anchor System 4 6 1 Push the installed Floating System into the water as shown in Fig...

Страница 14: ...u Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn according to the actual conditions of the project After tightening the anchor rope f...

Отзывы: