
1994c_Wartung_en-bedingt.fm, 12.06.2014
P1995BA/EN 2014-06
13
Maintenance
5
5
Maintenance
5.1
Service schedule
Regular service reduces operating faults, repair costs and downtime.
This maintenance schedule uses values that are valid for most applications. For a specific maintenance
interval, see 5.1.1 Calculating a customer-specific maintenance plan, page 14.
Implement a safety-related maintenance program that takes the local regulations for repair and mainte-
nance for all operating phases of the tool into account.
CAUTION!
Danger of injury due to unintentional activation
– before service, disconnect the tool from the compressed air supply.
Maintenance
interval
Rundowns
Measures
W1
100.000
Check the suspension bail for functional safety.
Check the air hose for wear.
Check the square on the output drive for wear.
Check the air inlet for tight fit.
Check the housing of the pulse unit for tight fit.
Check the maximum idling speed.
Check the reserve oil.
W2
500.000
Oil change, see 5.3 Complete oil filling, page 16.
Motor service kit, see 3) Part of motor service kit K1 order
no. 936178, page 27.
Hydraulic service kit, see 3) Part of hydraulic service kit K2,
order no. 936212, page 33.
Replace muffler, filter.
W3
1.000.000
Check individual parts and replace if necessary
Suspension bail
Throttle valve
Exhaust air throttle
Motor
Pulse unit
Содержание 80PHH
Страница 18: ...18 P1995BA EN 2014 06 1994c_Wartung_en bedingt fm 12 06 2014 Maintenance 5 Empty side...
Страница 24: ...24 P1995BA EN 2014 06 1994d_Reparatur_en bedingt fm 12 06 2014 Assembly instructions 7...
Страница 34: ...34 P1995BA EN 2014 06 1995e_Ersatzteile en fm 12 06 2014 Spare parts 8 8 5 Equipment order list 1 Order no...
Страница 36: ...36 P1995BA EN 2014 06 1995f_TechnDaten_en fm 12 06 2014 Technical data 9 9 2 Dimensions 80PHHA in mm Abb 9 2...