background image

 

14

 

 

 

 

TIP: 

When installing ALL pipes through the side panel slots and conduit slots, be 

sure to connect pipes by above Tek Screw technique and cover the ends of the 

pipe with duct tape, so any sharp edges will not be able to tear the fabric when 
sliding the pipe into position. 
 

 
 

 

 

INSTALLING THE COVER 

 
 

Step One- Unpack cover and unfold it completely with the inside surface facing 
up. 

     Tip:  The ends with black straps in the hems correspond to the front and back 

of the shelter. 
 

Step Two: Slide the assembled cover conduit pipe into the hem of the canopy.  

Detail view below 
 

 

 
 

 
 

 

 
 

 

 
 

 

 
 

 
 

 

 
 

 

 
 

 

Содержание Storage Master 104598

Страница 1: ...Storage Master Shed Row Poly Buildings Instructions Manual Building 104598 2005 ClearSpan All rights reserved Reproduction prohibited without permission Rev 24 February 2005 ...

Страница 2: ...5 166S099 1 66 PIPE SWAGED QUANTITY 18 131P0255 1 315 PIPE PLAIN QUANTITY 2 166P012 1 66 PIPE PLAIN QUANTITY 18 166P096D 1 66 PIPE LAIN QUANTITY 14 166P094 1 66 PIPE PLAIN QUANTITY 4 131S075 1 315 PIPE SWAGED QUANTITY 12 P 131P0735 1 315 PIPE PLAIN QUANTITY 2 131P0255 1 315 PIPE PLAIN QUANTITY 2 102675 3 X 1 900 GROUND POST QUANTITY 14 166S099 1 66 PIPE SWAGED QUANTITY 18 166P046 1 66 PIPE PLAIN Q...

Страница 3: ...ure rafter leg with supplied hex bolt and nut Be sure to leave holes 2 and 3 high enough off ground level in order to place a 2 x 6 ribbon board along building base if your construction plans include this addition Check ground posts so that holes are pointed outward Hole 4 is unused See Figure A ...

Страница 4: ...4 Step Two End Wall Rafter Parts needed 3 x 102193 3 way coupler W eyebolts 2 x Leg Pipe 94 2 x Rafter Pipe 99 2 x Rafter Pipe 12 Eyebolt Detail ...

Страница 5: ...after assembly Parts needed 2 x 102194 4 way coupler W eyebolts 2 x Rafter Pipe 99 2 x Rafter Pipe 12 2 x Hip Rafter Pipe 46 1 x Side Tee Fitting See Figure B 1 x Front Header Pipe 94 Swaged End 1 x Leg Pipe 94 Side Tee Figure B ...

Страница 6: ...6 Step Four Mid Rafter Assembly 3 x 102194 4 way coupler W eyebolts 2 x Rafter Pipe 99 2 x Rafter Pipe 12 4 x Hip Rafter Pipe 46 2 x Leg Pipe 94 ...

Страница 7: ...7 Step Five Finish rafter and end wall assembly by repeating steps 4 2 in descending order until cold frame assembly is complete ...

Страница 8: ...8 Step Six Ratchet Assembly Front Setup Back Setup Ratchets are place on outside of building just about ground post assemblies Figure C shows locations for all ratchets ...

Страница 9: ...9 Ratchet Location Figure C Ratchet Locations ...

Страница 10: ...sed for purlin is 1 315 in diameter Side panel pipe per side 2 x 75 swaged 1 x 73 5 plain Pipe Fastening After fastening pipe with a Tek screw be sure to Cover it with supplied duct tape so the screw won t rip any fabric Side panel pipe locations ...

Страница 11: ...11 Cover Conduit Pipe Pipe needed per side 1 315 5 x 75 swaged 1 x 25 5 plain These pipe make up the 16 front and back cover conduit pipe Cover conduit locations ...

Страница 12: ...ly CC6213 FABRIC CLIP CC4595 TIE DOWN 8 SNUGGER BALL Step Two End panel walls will be held on by fabric clips and 8 snugger ball tie downs detail view below Secure these panels to the frame before installing the main cover Inside View of End panel Fabric Clips ...

Страница 13: ...Close up view of snugger ball locations After fabric clips have been installed to the proper positions put a Tek screw through them in order to keep the clip from sliding off of the pipe Detail view below ...

Страница 14: ...pe so any sharp edges will not be able to tear the fabric when sliding the pipe into position INSTALLING THE COVER Step One Unpack cover and unfold it completely with the inside surface facing up Tip The ends with black straps in the hems correspond to the front and back of the shelter Step Two Slide the assembled cover conduit pipe into the hem of the canopy Detail view below ...

Страница 15: ...e Step Six In the front and rear hems locate the black straps Step Seven If either of your straps were shipped with a D ring attached you must cut the D ring off with scissors as it is not used on this model Step Eight Fasten ratchets to the outside of the legs with a Tek screw in the bottom hole of the ratchet as shown below There should be a few inches between the end of the cover and the ratche...

Страница 16: ...r notched at each leg where you will install a strap If your cover was not notched at the factory continue with this step Cut a 2 long slit in the hem just above the cover conduit Repeat this step on the other side of the hem so you can pass a 1 wide strap over the conduit through the slits Feed the both strap ends together through the slot in the ratchet spool and tighten slightly Refer to the ph...

Страница 17: ...oes around the cover conduit Step Five Along the opposite side of the shelter fasten ratchets to the outside of the legs where there are slits in the cover Use a Tek screw in the bottom hole of the ratchet as shown below There should be a few inches between the cover conduit and the ratchet Detail views below ...

Отзывы: