ClearSpan R030A00008 Скачать руководство пользователя страница 3

3

Revision date: 06.02.09

Important Information

YOU MUST READ THIS DOCUMENT BEFORE YOU  
INSTALL THE END PANEL POLYCARBONATE KIT

.

Thank you for purchasing this ClearSpan™ Twin-Wall 
Polycarbonate Kit. When properly assembled and 
maintained, this product will provide years of reliable 
service. These instructions include helpful hints and 
important information needed to safely assemble and 
properly maintain the end panel kit. Please read these 
instructions 

before

 you begin.

If you have any questions during the assembly, contact 
Customer Service for assistance.

SAFETY PRECAUTIONS

Wear eye protection.

• 

Wear head protection.

• 

Use a portable GFCI (Ground Fault Circuit 

• 

Interrupter) when working with power tools and cords.

Do not climb on the shelter or framing during or after  

• 

construction.

Do not occupy the shelter during high winds,  

• 

tornadoes, or hurricanes.

Provide adequate ventilation if the structure is 

• 

enclosed.

Do not store hazardous materials in the shelter.

• 

Provide proper ingress and egress to prevent 

• 

entrapment. 
 

WARNING:

 The individuals installing the end wall are 

responsible for designing and furnishing all temporary 
bracing, shoring and support needed during the 
assembly process.  
 
For safety reasons, those who are not familiar with 
recognized construction methods and techniques 
must seek the help of a qualified contractor.

REQUIRED TOOLS

The following list identifies the main tools needed to  
assemble the end wall.

 Additional tools and supports may 

be needed depending on the structure, location, and  
application.

Tape measure or measuring device

• 

Fine point marker to mark the location on frame and 

• 

panels

Variable speed drill and impact driver (cordless with 

• 

extra batteries works best) 

Metal file and metal-cutting saw

• 

Scissors or utility knife and tool to cut polycarbonate 

• 

panels

Hammers, gloves, and eye protection

• 

Ladders, work platforms, and other machinery for 

• 

lifting designed to work safely at the height of the 
building and end wall.

ATTENTION:

 Consult the services of a qualified, 

professional contractor if you are not familiar with the 
construction of similar frame structures or the installation 
of comparable polycarbonate panels.

Содержание R030A00008

Страница 1: ...hout permission Diagram shows the end wall kit for a 35 wide frame without a door Door purchased separately Actual panel positions and sizes may differ from what is shown in the diagram ClearSpan Twin Wall Polycarbonate End Panel Kit 30 Wide 35 Wide STK R030A00008 30 Wide R035A00008 35 Wide ...

Страница 2: ...ation of the panels included in this PC package After assembling the end frame continue with these instructions to attach the twin wall polycarbonate panels to the end wall ATTENTION If you purchased an optional door kit consult those instructions and proceed as instructed In most instances the end wall frame and door frame are constructed before end panels are installed This allows for the placem...

Страница 3: ...ingress and egress to prevent entrapment WARNING The individuals installing the end wall are responsible for designing and furnishing all temporary bracing shoring and support needed during the assembly process For safety reasons those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor REQUIRED TOOLS The following list identifies t...

Страница 4: ...N The following graphics and photos will help you identify the different hardware used for the installation of the end panel Some parts are not shown UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin to install the end panels Unpack the contents of the shipment and place 1 where you can easily inventory the parts Refer to the Bill of M...

Страница 5: ...rbonate panels Quick Start section for the location and lengths of each panel The diagrams are located at the back of these instructions ATTENTION Position panels as shown on the panel diagrams Using a panel in the incorrect place can affect the placement of subsequent panels In addition the amount of aluminum profile used between panels may not be adequate if additional seams are created Install ...

Страница 6: ...o the girt every 12 on center Do not overtighten screws NOTE Do not use washers on Tek screws when securing the H channel to the girt Install Tek screws in the channel of the aluminum H channel With the first panel attached to the end frame verify 6 that the UV protected surface is toward the outside and repeat the steps to install the next panel A Ground Level 4 x 8 Panel 4 x 8 Panel Girt Diagram...

Страница 7: ...of the panel 11 sides and cut H channel to the measured length H channel when installed properly is positioned under the end cap with the panel Use the end cap as a guide to properly cut the upper end of the H channel Set the panel back in place 12 with the UV protected side facing to the outside against the end wall and install the H channel along the edges Top end of the side H channel fits unde...

Страница 8: ... channel and installed sidewall panels When installed the panels of the end wall and sidewall meet to form a finished edge at each corner of the building Secure any horizontal section of H channel to the end wall girt using Tek screws See D in the diagram below Measure and cut a section of 104213 profile and install it 16 along the outside of edge of each 6 x 12 panel to complete installation see ...

Страница 9: ...good condition Replace damaged panels if needed Check connections and all fasteners to verify that they remain tight Check the contents of the shelter to verify that nothing is touching the polycarbonate panels that could cause damage Inspect the end wall frequently and regularly to ensure that it remains secure and in good repair Replace broken or missing components immediately If the shelter is ...

Страница 10: ... Panel 6 x 8 Panel 6 x 8 Panel 6 x 8 Panel 6 x 8 Panel The horizontal dashed lines in the diagrams below show where to attach the panels to the end frame Install Tek screws and washers through the panel and into the end wall girt Evenly space the screws at 12 30 Wide Sample Ground Level 6 x 8 Panel 6 x 8 Panel 6 x 8 Panel 6 x 8 Panel 6 x 12 Panel 6 x 12 Panel 4 x 8 Panel 4 x 8 Panel 4 x 8 Panel 4 ...

Страница 11: ...oor installation Diagram below shows the installed sidewall hat channel used for the installation of the sidewall polycarbonate panels of the main building NOTE Install vent tape on the bottom edges of the lower panels and along the top edges of the upper panels Tape the top and bottom of the outer panels marked with an X below All polycarbonate panels to be installed with UV protected surface tow...

Страница 12: ...ycarbonate panels to be installed with UV protected surface toward the outside of the shelter X X Install 104213 profile along this edge of the end panel Install 104213 profile along this edge of the end panel If a door was purchased position panels as needed to accommodate the door installation Install door frames before end panels Install the end panels before the sliding door installation Diagr...

Страница 13: ...13 Revision date 06 02 09 Notes This page is reserved for customer notes ...

Отзывы: