background image

4

CLEARSPAN

 EZ-GROW GREENHOUSES

Revision date: 09.12.08

REQUIRED TOOLS

The following list identifies the main tools needed to  

assemble the shelter. Additional tools and supports may be 

needed depending on the structure, location, and  

application.
•  Tape measure or measuring device
•  Variable speed drill and impact driver (cordless with 

extra batteries works best) 

•  Wrench or ratchet and socket set (recommended)
•  Ropes long enough to reach over the shelter
•  Hammers and gloves
•  Metal file and metal-cutting saw
•  Duct tape (supplied by customer)
•  Box cutter, utility knife or scissors
•  Ladders, work platforms, and other machinery for lifting  

designed to work safely at the height of the shelter

UNPACK AND IDENTIFY PARTS

The following steps will ensure that you have all the  

necessary parts before you begin to assemble the shelter.
1.  Unpack the contents of the shipment and place where  

you can easily inventory the parts. Refer to the Bill of  

Materials/Spec Sheets.

2.  Verify that all parts listed on the Bill of Materials/Spec  

Sheets are present. If anything is missing or you have  

questions, consult the Pictorial Parts Guide and all  

shelter diagrams for clarification, or contact Customer  

Service.

 

NOTE:

 At this time, you do not need to open the plastic  

 

bags containing smaller parts such as fasteners or  

 washers. 

 

QUICK START GUIDE 

 

For a quick overview of this shelter and its components, 

consult the Quick Start Guide at the back of these 

instructions.

Space below is reserved for customer notes.

Содержание EZ-Growl

Страница 1: ...REENHOUSES Revision date 09 12 08 ClearSpan EZ Grow Greenhouse Photo may show a different but similar model 2008 ClearSpan All Rights Reserved Reproduction is prohibited without permission STK DIMENSIONS 104216 12 W x 18 L ...

Страница 2: ...nufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing...

Страница 3: ...To aid in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly...

Страница 4: ...work safely at the height of the shelter UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin to assemble the shelter 1 Unpack the contents of the shipment and place where you can easily inventory the parts Refer to the Bill of Materials Spec Sheets 2 Verify that all parts listed on the Bill of Materials Spec Sheets are present If anythin...

Страница 5: ...used Not all parts are shown Swaged Unswaged Swaged and Unswaged Rafter Sections not all pieces are shown Zippered End Panel 103620b Plain End Strap FA4470B Tek Screw CC6212 Fabric Clip 102191 3 Way Coupler 102204 Corner Coupler CC6250 Earth Anchor FA2912 Plate FA2921 U Bolt FALB02b Nut 102192 4 Way Coupler 102205 Tee Coupler QH1061 Ratchet 100442 Nut Setter ...

Страница 6: ...ersonal injury and damage to the shelter fasten and tighten a Tek screw at each pipe and coupler joint To prevent cover damage install the Tek screw so that it does not touch the main cover or any optional side or end panels once these are installed 4 Way Coupler no lock bolt 4 Way Coupler includes lock bolt ADDITIONAL PARTS IDENTIFICATION NOTES In some instances there can be differences between t...

Страница 7: ... OVERVIEW This section is an overview of the process for assembling your greenhouse The illustration below helps identify the main parts of the greenhouse 1 Locate the required parts for each assembly procedure 2 Assemble the rafters and frame 3 Square and anchor the shelter 4 Prepare and attach end panels and main cover Base Rail ...

Страница 8: ...le can be used Refer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle 3 After squaring the position of the building and placing a stake at all corners string a line between the stakes to mark the base of the building FRAME ASSEMBLY There are different ways to assemble this shelter This procedure describes assembling the roof frame first and then...

Страница 9: ...ye bolts are tight and install base conduits 4 Connect the 3 way couplers to form the end rafters of the assembly and connect the 4 way couplers to construct the inside rafters BASE CONDUIT INSTALLATION Gather the parts Pipe 1 315 x 72 plain 131P072 Corner coupler 102204 Tee coupler 102205 Assembly Procedure 1 Connect the base conduit 72 purlin section using a corner coupler on each end and Tee co...

Страница 10: ...e ground previous step NOTE Do not insert the conduit through the pocket at the bottom of the door section of the panel See the diagram in the next column 3 Position the conduit and panel between the legs of the end rafter and attach the conduit to each corner coupler NOTE The end panel material will need trimmed 4 Verify that the end rafter legs are straight plumb and that the rafter width is uni...

Страница 11: ...ions SQUARE THE ASSEMBLED FRAME Gather the parts Measuring tape Tek Screws Complete these steps 1 Square the frame by measuring diagonally corner to corner and align all rafters as shown below 2 Verify that the width of each rafter measured at the base conduit is 11 11 3 4 center to center Consult the Quick Start diagrams for additional details NOTE The frame is square when the two diagonal measur...

Страница 12: ...ng the door conduit is optional Pipe is included if the conduit is wanted Complete these steps to install the conduit 1 Assemble the door conduit by connecting the 75 swaged pipe to the 49 5 plain pipe secure the joint using a Tek screw and tape over the Tek screw to protect the end panel 2 Insert the conduit assembly into the door pocket When installed correctly the conduit is flush at each end o...

Страница 13: ...cover conduits into the pockets of the main cover Cover Conduits Cover Ends w Strapping PREPARE MAIN COVER Gather the parts Pipe 1 315 x 72 plain 131P072 Pipe 1 315 x 75 swaged 131S075 Main Cover Ratchet 1 4000lb and Tek screws Assembly Procedure The main cover is stretched and secured to the sides using straps and ratchets The ends front and back are secured to the bottom of each end panel corner...

Страница 14: ...he cover and possible serious personal injury DO NOT attempt to install the main cover on windy days Cover Conduit Ropes 6 Using the main cover conduit as a guide attach the ratchets to the bottom conduit Fasten each ratchet to the inside of the bottom conduit as shown above and on the Side Profile diagrams or to the inside or outside of the rafter leg near the bottom conduit as shown below using ...

Страница 15: ...r NOTE Depending on the shelter some main covers may not include a cover skirt 14 After the main cover is tight read the care and maintenance information that follows SHELTER CARE AND MAINTENANCE Proper care and maintenance of your shelter is important Check the following items periodically to properly maintain your shelter Regularly check the main cover and end panels to see that these remain tig...

Страница 16: ...16 CLEARSPAN EZ GROW GREENHOUSES Revision date 09 12 08 QUICK START GUIDE 12 Wide EZ Grow Greenhouse Sidewall 11 11 3 4 Height Width 6 1 1 2 9 8 11 16 Height ...

Страница 17: ...REENHOUSES Revision date 09 12 08 FRONT PROFILE 131P078 131P078 131P072 131P072 131S075 131P072 Front 102204 Middle 102205 Front 102204 Middle 102205 End 102191 Middle 102192 End 102191 Middle 102192 End 102191 Middle 102192 ...

Страница 18: ...18 CLEARSPAN EZ GROW GREENHOUSES Revision date 09 12 08 SIDE PROFILE 131P072 6 1 Rafter Spacing 18 3 Length 131P072 131P072 ...

Страница 19: ...ARSPAN EZ GROW GREENHOUSES Revision date 09 12 08 CONNECTIONS Purlin End Rafter Connection View 2 Rafter Purlin Bottom Connection View 1 Bottom Rail Auger Connection View 4 Purlin Mid Rafter Connection View 3 ...

Страница 20: ...Rail 5 16 x1 x2 1 2 U Bolt W U Bolt Plate 5 16 Nut Rafter Purlin Bottom Connection Purlin End Rafter Connection View 2 Rafter Purlin 102191 Purlin Mid Rafter Connection View 3 Rafter Purlin 102192 Bottom Rail 5 16 x1 x2 1 2 U Bolt W U Bolt Plate 5 16 Nut CC6250 View 4 Bottom Rail Auger Connection ...

Страница 21: ...21 CLEARSPAN EZ GROW GREENHOUSES Revision date 09 12 08 Space below is reserved for customer notes ...

Отзывы: