Step 6:
Check the rafter-to-rafter dimensions along all the purlins. Also check that every rafter is
standing up straight (plumb). Square the corners by measuring diagonally corner-to-corner, and
line up all rafters using a straight line.
Section D - Installl Additional Bays
Step 1:
Once you have the first bay installed and anchored, you can attach the second and any
additional bays one at a time, a rafter at a time. Bays share a common center "Y" post.
Section E - Finish Rough Edges
Step 1:
Check for any sharp edges on the frame and file them smooth so they will not cut the cover.
Step 2:
Apply two layers of heavy duct tape on all pipe connections and connectors that may
contact the cover.
Page 7