CLEARSPAN
™
SUNBLOCKER SYSTEM
10
Visit
www.ClearSpan.com
for additional products and customer assistance.
Revision date: 10.04.07
FRAME ASSEMBLY (CONTINUED)
Space below is reserved for customer notes.
Frame length shown may differ from actual frame.
20'-3" on-center
10'-2 3/4
on-center
Two (2) struts
attached
Three (3) struts
attached
10'-2 3/4
on-center
Corner Connection
Mid Connection
Center Connection
6. Review the diagrams in the Quick Start section for your
shelter to determine the locations of the remaining
diagonal struts.
7. Install the diagonal struts. Each corner connection uses
two (2) struts, each mid connections (if present) uses
three (3) struts, and each center connection (if present)
uses four (4) struts. Refer to Quick Start Guide for
location and additional details.
8. With the struts in position, tighten the band clamps.
9. Once the frame assembly is complete, verify that all
frame bolts are tight,
anchor the frame,
and install the