19
CLEARSPAN
™
GARAGES
Revision date: 05.20.16
4. After assembling the cover conduits, take the main
cover and unfold it on a clean, smooth surface near the
frame.
NOTE:
Unfold the main cover with the inside surface
facing up.
5. Locate the main cover ends with strapping and align
with the front and back of the shelter.
6. Insert the cover conduits into the pockets of the main
cover.
NOTE:
Shelter shown above may be of a different
length than actual shelter. Do not insert a cover conduit
into any pocket that includes a pre-installed strap.
7. Continue by attaching the main cover ratchets and the
main cover to the frame.
PREPARE MAIN COVER
Gather parts:
• Ratchets (1"), main cover, and Tek screws
• 1.315" x 75" swaged pipe (131S075)
• 1.315" x XX" plain pipe (131P0XX); See Side
Profile diagrams in the Quick Start section for pipe
identification for your building.
Assembly Procedure
NOTE:
When handling the main cover and setting it in
position, do not pull on the end straps. They will pull out of
the cover.
WARNING:
To prevent damage to the cover and to
prevent serious personal injury, DO NOT attempt to
install the main cover on windy days.
1. Fasten a ratchet to the end conduit using a Tek screw
as shown below. The ratchet should be about 6" in from
the end of the conduit.
2. Repeat Step 1 at all remaining corners.
3. Assemble two main cover conduits. Consult the Side
Profile diagrams for pipe identification for your building.
a. Locate all sections of pipe needed and insert
the swaged end of each pipe into the plain end
of another pipe until the conduit is assembled.
b. Secure each pipe joint with a Tek screw and
tape the screw and joint with duct tape.
End Panel
End Conduit
6"
Ratchet
FA4482
Tek Screw
ATTENTION:
Cover conduits are inserted into the
pockets sealed into the main cover. The conduits are
used to tighten and secure the main cover.
Cover
Ends with
Strapping
Front with zippered
end panel.
Cover Conduits