CAUTION Hazardous voltages are present inside ClearPOWER P2, Docking station and Breaker panel
enclosures that can cause death or severe personal injury. Follow proper installation, operation and
maintenance procedures to avoid hazardous voltages. Turn off the main circuit breaker in the load
center before starting installation.
1. Identify installation location of the Docking Station. Most installations are done in utility rooms in proximity
to the home’s breaker panel.
2. Use Template to mark the lag locations that correspond with the lag holes on the back of the docking
station and the hole for the provided power whip (called the
ClearPOWER
installation cable).
3. Make sure lags will screw into studs or other secure surface.
Содержание ClearPOWER P2
Страница 1: ......