Maintenance:
Normal Operation
-Normal display alternates between time of day and days until regeneration.
-Days remaining until the next regeneration will count down from the regeneration day
override value to 1 day remaining.
-Once the count reaches 1, a regeneration cycle will be initiated at the next designated
regeneration time.
Battery back-up (this unit uses a standard 9 volt alkaline battery)
-To install the battery the back-cover must be removed by removing the two back-cover
screws.
-Next insert the battery into the battery holding clip and snap the 9 volt battery
connector onto the battery.
-Replace back-cover
-Features of battery back-up
-The battery back-up maintains the time of day during power failures.
Note: During power failure to conserve battery power the display is turned off.
However, to confirm that the battery is working you can press either button and the
display will turn on for five seconds.
* Menus cannot be accessed during power failure
* If a power failure occurs while the valve is in regeneration the regeneration
will resume operation once the power is restored
How To Start An Extra Regeneration Cycle
1. Starting delayed extra cycle
-If days remaining is not already at 1 press and hold the Set/Change button.
-After 3 seconds the days remaining display will read 1
-Regeneration cycle will be initiated at the next designated regeneration time
2. Starting Immediate Extra Cycle - First, complete above delayed cycle steps
-With days remaining at 1 press and hold the Set/Change button
-After 3 seconds the regeneration cycle will begin.
3. Fast Cycling Through Regeneration
-First complete above immediate cycle steps
-Press and hold the Set/Change button
-After 3 seconds the valve will start to advance to the next step