STEP 6
Place the bath into the desired position and align the drainage and the
waste as shown below. Test the water tightness of all connections.
Top View
Level floor surface
Side View
Drainage
Waste
Caution
Do not over tighten the
waste.
5
Marbleform Bath - Installation V2_10/18