background image

SECTION 5:  120V WIRING INSTRUCTIONS

1.) Loosen the screw securing the junction box cover and remove the cover.

2.) Pull the power supply wires through the hole in the cover.

3.) Pull out the 4 wires marked L, N, G, S from the junction box on the side of the  

     builder box. 

4.) Connect the black L wire from the unit to the black L from the power supply.

5.) Connect the white N wire from the unit to the white N from power supply.

6.) Connect the green ground G wire from the unit to the ground from the power supply.

7.) Plug the S wire connector into the provided sign wire.

8.) Ensure that all connections are tight. 

9.) Secure all the wiring with wire-caps, then insert into the junction box.

10.) Remount the junction box cover (see figure 8 & 9.)

E-8

Figure 8

Note: 36EB110-GRT & 36EB111-GRC will only run on 120 volt operation.

 

           

CONTROL

120 V

Configration

Содержание 36EB110-GRT

Страница 1: ...or injury and will void the warranty For Customer Service E Mail parts twinstarhome com In English Call 866 661 1218 In French Call 866 374 9203 In Spanish Call 866 661 1218 IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED AN ELECTRIC SHOCK OR FIRE MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS OF LIFE DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY ...

Страница 2: ...IED PERSONNNEL WHERE REQUIRED BY LAW Section 1 Prepare product for installation Section 2 Rough in framing following the recommended dimensions Section 3 Recommended power supply wire specifications Section 4 Mount the unit Section 5 120V wiring instructions Section 6 208 240V wiring instructions Section 7 Function check Section 8 Finish wall construction Section 9 Electrical wiring diagram E 2 36...

Страница 3: ...rtons and put them in a safe location see figure 1 E 3 Figure 3 Figure 1 Sign Wire Remote Control SLEEP EMBERS HEAT FLAME Sign Wire Control Box with bracket Remote Control SLEEP DOWN LIGHTS HEAT FLAME UP LIGHTS AUTO Stones 36EB111 GRC 36EB221 GRC 36EB110 GRT 36EB220 GRT TIMRER FLAME LIGHT EFFECTS UP DOWN UP DOWN TIMRER FLAME UP DOWN Control Box with bracket ...

Страница 4: ... GRT 36EB220 GRT 36EB111 GRC 36EB221 GRC 2 Unscrew 2 screws on the side edge of the frame Fig 2 Securely holding the frame lift up and pull away from the unit to remove the frame Do not remove the protective plastic film at this time Place the frame in a safe place see figure 2 ...

Страница 5: ...al codes for rated power consumption For 36EB220 GRT 36EB221 GRC installations use four non metallic sheathed cables with ground wire for the incoming power supply Use the appropriate wires to meet local and national electrical codes for rated power consumption Recommended Wire and Fusing Requirements Use appropriate wire to meet local and national electrical codes for rated power consumption All ...

Страница 6: ...nstall Method 1 Remove front frame see figure 2 2 Remove the screws holding side panels and then remove the side panels see figure 4 5 3 Insert the builders box into the opening in the framing 36EB111 GRC 36EB221 GRC 36EB110 GRT 36EB220 GRT 36EB110 GRT 36EB220 GRT 36EB111 GRC 36EB221 GRC ...

Страница 7: ... GRT 36EB220 GRT 36EB111 GRC 36EB221 GRC Place stones here E 7 4 Install the builders box using 4pcs screws from the inside of the builder box see figure 6 7 5 Remount the side panels 6 Place the stones as desired Only for 36EB111 GRC 36EB221 GRC 7 Remount the front frame ...

Страница 8: ...lack L from the power supply 5 Connect the white N wire from the unit to the white N from power supply 6 Connect the green ground G wire from the unit to the ground from the power supply 7 Plug the S wire connector into the provided sign wire 8 Ensure that all connections are tight 9 Secure all the wiring with wire caps then insert into the junction box 10 Remount the junction box cover see figure...

Страница 9: ...the unit to the two dedicated 15 amp lines from the power supply 5 Connect the white N wire from the unit to the white N from power supply 6 Connect the green ground G wire from the unit to the ground from the power supply 7 Plug the S wire connector into the provided sign wire 8 Ensure that all connections are tight 9 Secure all the wiring with wire caps then insert into the junction box 10 Remou...

Страница 10: ...N 6 INSTALL CONTROL BOX 1 Mount the control box bracket to the wall using provided screws 2 Connect control panel wire to extension cable 3 Insert the control box to the bracket and finish the control box installation 1 2 3 ...

Страница 11: ...ols test all the functions to ensure they are working correctly If any functions do not work recheck the wiring using sections 4 and 5 of this guide 5 Use the remote control to operate the unit check all the functions 6 Finish wall construction work E 11 Caution When the wiring is complete a thorough testing cycle must be performed to check the operation of the unit PRIOR to the wall area being cl...

Страница 12: ...SECTION 10 WIRING SCHEMATIC E 12 36EB110 GRT ...

Страница 13: ...36EB220 GRT E 13 ...

Страница 14: ...E 14 36EB111 GRC ...

Страница 15: ...36EB221 GRC E 15 ...

Отзывы: