© 2019
Step 6 of 6
Order #XXXXX
*
Shelf Support
Shelf Support
Completed Counter Assembly
Shelf
Counter Top
Steps:
1) Wrap
SEG graphic
around front & sides of counter.
See SEG Graphic Installation detail.
2) Attach shelf supports to
Velcro
, then place shelf on top of supports.
3) Place counter top on assembly. See
Counter Top Attachment
detail.
Graphic Removal
To remove the graphic from
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
SEG Graphic Installation
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
Back View
Front View
Align hole with pin
Rotate pin. Spring
will push pin into hole.
Counter Top Attachment
1
2
*
Pin
Hole
*
Top View
GOD-1558 Counter Assembly (Cont’d)
Содержание gravitee GK-1014
Страница 4: ...2019 Crate 1 of 1 Order XXXXX Crate Packing...
Страница 5: ...2019 Order XXXXX 1 sq foot GK 1014 Grid View...