PE 2000
2 COLUMNS ASYMETRIC POST LIFT WITH BASEMENT 4T
40
Picture 12
(end switch connection)
POWER CONNECTION:
CONNECTING THE ELECTROMAGNETIC RELEASE DEVICE:
The three-phase connection power cables - 5 poles (5 × 2.5mm2) have to be connected to the
L1 #, L2 # L3 # and N # terminals, located inside the control box.
The PE earth cable must be connected to the marked terminal.
If the lift is operated at 230V, connect L3 #, N # to the terminals located inside the control unit.
The PE # ground cable must be connected to its marked terminal.
Connect the 230 # and 200 # steel cables to the cables
marked with the same identification number, inside the
control unit.
CONNECTION OF THE END SWITCH DEVICE:
Connect the 102 # and 100 # cables to the cables marked
with the same identification number, inside the control
unit.
Check that the power supply connection is correct, and pay attention to the rotation of the
three-phase motor.
Make sure that all the dowels are tight.
Verify that, by pressing the «UP» button, the electromagnets release the mechanical safety lock
and that the carts are aligned and lifted simultaneously
Press the «DOWN» button and check that the electromagnets release the safety devices and
consequently allow the lowering of the carts to the minimum height position.
CALIBRATION
1 CALIBRATION PROCEDURE
Содержание PE 2000
Страница 21: ...PE 2000 PONT ELEVATEUR 2 COLONNES ASYMETRIQUE AVEC SOCLE 4T 21 VUE CLAT E ANNEXES...
Страница 30: ...PE 2000 2 COLUMNS ASYMETRIC POST LIFT WITH BASEMENT 4T 30 4 TECHNICAL DRAWING Picture 1 lift dimension...
Страница 45: ...PE 2000 2 COLUMNS ASYMETRIC POST LIFT WITH BASEMENT 4T 45 LIFT EXPLODED VIEW ANNEXES...
Страница 51: ......