7
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
Connect the other end to the spike
between a flat washer and the
copper rod with a lock washer under
the head of the M6 machine screw in
a similar fashion to the earth point
screw on the generator.
When pushing the spike into the
ground the generator must not be
running and it is suggested that the
spike is pushed into the ground by at
least 100 mm.
If you have doubt about earthing of generators in accordance with BS -
EN7430, consult a qualified electrician.
CHECKING THE AIR FILTER
1. Remove the side maintenance
panel.
2. Remove the air filter cover screw
shown on the right.
3. Slide out the air filter panel.