10
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
STEP 4: SQUARING UP THE FRAME
Be sure the frame is stand-
ing at the desired location
Level the frame both end
to end and side to side.
Check that the frame
measures 8’ (244cm) in
width (fig 11).
Measure the distance
between the interior of
the frame feet diagonally.
The sections A to B and C
to D should be equal
length (fig 11). If they are
not equal length, tap the
corner leg of the longer
section using a rubber mallet, inward until both diagonals are equal.
STEP 5: ANCHORING THE FRAME
The shed must be well anchored.
Do not attempt to install any of the fab-
ric before the frame is properly
anchored.
If the ground is hard or rocky, pre-drill
holes before inserting the anchors.
Four anchors (21) are provided to
secure the shed. They are to be
installed around the bent corner legs
(3) at each corner of the shed.
Screw the anchor head to the ground.
Insert the cable (22) through the eye-
lets of the anchor (21) and the bent
corner leg (3). Secure the cable (22)
with the cable clamp (23) as in fig 12.
Repeat the same procedure for the
other three anchors.
Содержание 3503582
Страница 16: ......