background image

STEP 1

Adjust the bath feet until the bath tub base is 8mm above the floor 

when the floor is finished. This can be done by turning the feet bolts 

accordingly. When measuring from the unfinished floor, ensure to 

take the floor finishing (e.g. tile) thickness into consideration.

STEP 2

Mark the floor and outline of the bath, at final installation position 

with a marking pencil. Ensure to trace the outline of the flat/tiling 

flange side of the bath on the wall.

STEP 3

If using footlocker option, simply drill and secure the footlockers to 

the floor where the two back feet of the bath will be positioned on 

final installation. Refer to 

Figure 2

 and 

Figure 3

.

STEP 4

Carefully tilt bath on its side and use Flexi-Dinger to connect the 

waste outlet to the drain, as illustrated in 

Figure 4

. Make sure to cut 

the Flexi-Dinger to correct length for ease of installation and to 

prevent it from bowing upward, as this will result in drainage issue. 

Be sure to protect the bath surface. Damage during installation is 

not covered by warranty.

STEP 5

Slide the bath into the wall. Ensure that the bath back feet glide into 

the footlockers. Refer to 

Figure 5

.

Figure 5

Foot installation to footlocker.

Figure 4

Flexi-Dinger installation

Figure 1

Feet set at 8mm above the floor

Figure 3

Freestanding bath 

with footlocker.

Figure 2

Congratulations on the purchase of your new Clark bath. We are sure you 

will have many years of relaxation, turning your bathroom into a stylish 

retreat.

CLARK ACRYLIC FREESTANDING BATHS

All our products are made from sanitaryware grade acrylic. It resists 

chipping, will not rust and has excellent heat retention properties. Its high 

gloss finish has natural slip resistance.

All dimensions are in millimeters and are subject to normal manufacturing 

variations. Therefore, Clark reserves the right to vary specifications 

without notice.

CLEANING YOUR BATH

 

A)  To preserve the polished surface, after using your bath, clean  

 

 

with soft cloth and warm soapy water to wash away any body  

 

 

oils or soap residue that forms a ring tide mark.

 

B)  As a weekly cleaner we recommend warm, soapy water. Do    

 

 

not use powders, pastes, cream cleaners, thinners, window    

 

 

cleaning sprays or dry cleaning liquid, etc.

 

C)  Stubborn marks or fine scratches may be polished out with    

  Brasso.

 

D)  When coloured essentials oils are used, first test that the  

 

 

 

colour won’t stain your bath. Always add oils into a bath full   

 

 

of water. Never pour them into an empty bath.

WARNING

BEFORE COMMENCING INSTALLATION, PLEASE READ THESE INSTRUCTIONS CAREFULLY. 

INSTALLATION MUST COMPLY WITH ALL STATE BY-LAWS AND

ANY REQUIREMENTS IMPOSED BY THE LOCAL AUTHORITIES

WARNING

NO PUTTIES OR SILICONES CONTAINING LINSEED OIL ARE TO BE USED AS SEALANTS ON THE 

WASTE. WE RECOMMEND SANITARY GRADE SILICONE.

RECEIVING YOUR BATH

 

A)  Unpack and check for damage.

 

 

After receiving your bath, please unpack and remove all  

 

 

 

plastic covering, checking carefully for any damages. Repack  

 

 

the bath if it is not being immediately installed. Clark  

 

 

 

reserves the right to reject any claim for damage if not  

 

 

 

notified in a timely manner.

 

B)  Protect your bath.

 

 

Before commencing installation, ensure the bath is  

 

 

 

completely protected, leave protection film in place until the  

 

 

bathroom is complete. Scratches and cracks incurred during   

 

 

installation are not covered by the warranty.

WATER TESTING

Water test your bath prior to enclosing to ensure it drains correctly as no 

claims for non-draining baths will be valid after enclosing or tiling has 

been done.

DRILLING AND REPAIRS

When drilling for taps, use a fine toothed hole saw at less than 1000rpm. 

Scratches or cigarette burns can be improved with 1200 grade wet & dry 

sandpaper then repolished with Brasso polishing compound. Always 

polish scratch in a circular movement.

All materials to comply with appropriate Australian & NZ Standards.

STEP 7

Rest the bath for a minimum 24 hours to allow the silicone to fully 

cure.

STEP 6

Apply silicone around the base surrounding, leaving a 20mm gap in 

an inconspicuous position. Refer to 

Figure 6

.

Figure 6

Silicone applied around base surrounding of bath.

Отзывы: