36
INSTALLATION
INSTALLATION PROCEDURE
1. Identify the polarity of the dome light circuit and set the switch
on the bottom of the overhead monitor housing.
2. Test fit the overhead monitor system on the ceiling of the vehicle,
verifying it is not going to interfere with the safe operation of the
vehicle.
3. Once the mounting location of the overhead monitor system has
been determined, carefully mark the location with masking tape.
4. Lower the vehicle’s headliner down to see if a roof support
beam is available to screw the mounting bracket to. If a support
beam is not available to screw into, use a 3⁄4” piece of plywood
cut to the appropriate size. Attach the plywood to the roof of the
vehicle using silicone allowing adequate drying time.
5. Screw the mounting bracket in the vehicle.
DOUBLE CHECK
THE LENGTH OF THE SCREWS PRIOR TO MOUNTING THE
BRACKET
.
6. Cut a 1” hole in the headliner along the backside of the
mounting bracket for the cables to pass through.
7. Route cables through the hole to the predetermined location of
the AV source (s).
8. Identify the dome light wires in the vehicle and connect them
to the corresponding dome light wires on the overhead monitor
system.
9. Plug in the AV cables and power harness into the overhead
monitor system.
E
ng
lis
h
�
�
�
��
��
O
H
M
D
1
0
2
ohmd 102
3/16/05, 6:35 AM
36
Содержание OHMD102
Страница 39: ......
Страница 52: ...53 NOTES O H M D 1 0 2 English O H M D 1 0 2 ohmd 102 3 16 05 6 36 AM 53...