
6
4. OPERATING INSTRUCTIONS
4.1. FIRST STEPS
In order to achieve an optimum operation of the machine, please follow the below-mentioned steps
carefully.
1. After unpacking and positioning the machine on a level surface, remove the front cover by
unscrewing the 2 fastening screws shown in
Picture 1
. Lift the front cover out of its anchoring to
expose the pressing system.
Picture 1
2. Check that the supply tunnel is mounted properly and that the fixation lever is fixed
(see
Picture 2
).
Picture 2
Содержание Fantastic ECO
Страница 18: ...18 5 CERTIFICATES...
Страница 19: ...19...
Страница 20: ...20...
Страница 21: ...21...
Страница 22: ...22...