13
Cisco Catalyst 6500 Series ASA Services Module Installation Note
OL-23955-01
Installing the ASA Services Module
Figure 3
Clearing the EMI Gasket in a Horizontal Slot Chassis
Figure 4
Closing the Ejector Levers in a Horizontal Slot Chassis
1
2
3
FAN
STATUS
4
5
6
VS-S720-10G
STATUS SYSTEM ACTIVE PWR MGMT
RESET
EJECT
DISK 0
UPLINK
SFP
1
3
10/100/100
3
LINK
LINK
LINK
CONSOLE
LINK
LINK
4
10GE UPLINK
5
SUPERVISOR 720 WITH INTEGRA
TED SWITCH FABRIC/PFC3
VS-S720-10G
STATUS SYSTEM ACTIVE PWR MGMT
RESET
EJECT
DISK 0
UPLINK
SFP
1
3
10/100/100
3
LINK
LINK
LINK
CONSOLE
LINK
LINK
4
10GE UPLINK
5
SUPERVISOR 720 WITH INTEGRA
TED SWITCH FABRIC/PFC3
ASA SERVICE MODULE
WS-SVC-ASA-SM1
SHUTDOWN
ST
AT
US
ID
1mm
4
3
5
3
2
4
6
Gap between the module
EMI gasket and the
module above it
Press down
Press down
255076
ASA SERVICE MODULE
WS-SVC-ASA-SM1
SHUTDOWN
ST
AT
US
ID
1
2
3
FAN
STATUS
4
5
6
VS-S720-10G
STATUS SYSTEM ACTIVE PWR MGMT
RESET
EJECT
DISK 0
UPLINK
SFP
1
3
10/100/100
3
LINK
LINK
LINK
CONSOLE
LINK
LINK
4
10GE UPLINK
5
SUPERVISOR 720 WITH INTEGRA
TED SWITCH FABRIC/PFC3
ASA SERVICE MODULE
WS-SVC-ASA-SM1
SHUTDOWN
ST
AT
US
ID
VS-S720-10G
STATUS SYSTEM ACTIVE PWR MGMT
RESET
EJECT
DISK 0
UPLINK
SFP
1
3
10/100/100
3
LINK
LINK
LINK
CONSOLE
LINK
LINK
4
10GE UPLINK
5
SUPERVISOR 720 WITH INTEGRA
TED SWITCH FABRIC/PFC3
255077
Ejector levers flush
with module faceplate