
NOTE: If you power on the router
without inserting a NIM module,
the ZTP process will not work.
Copyright © 2018, Cisco Systems, Inc.
Product 78-101267-01, Rev 071118
Insert the NIM modules:
1
1
Boot the vEdge router:
3
1
2
Flip the On/Off switch on the rear
of the router to the ON position.
From vManage > Dashboard or
from vManage > Network > Device
Dashboard, verify that the vEdge
router is operational.
Install at least one NIM module in any
of the four available NIM slots.
Connect AC power to the vEdge router:
1
2
Plug one end of the power cord into
the AC power supply.
Plug the other end into the AC
power outlet.
Step 1
Step 2
Step 3
Step 4
Initial Configuration
Caution: If you are connecting AC
power to the router, it is recommended
that the building have an external surge
protective device installed.
From vManage > Configuration >
Devices > WAN Edge List > Upload
WAN Edge List, upload the WAN
Edge authorized serial number file.
From vManage > Configuration >
Certificates > WAN Edge List:
a. Check that the router's chassis and
serial number are in the WAN Edge list.
b. Authorize each router by clicking
Valid in the Validate column.
c. Click Send to Controller to send the
WAN Edge list to the controller devices.
From vManage > Configuration >
Templates:
a. Create a device template for the
vEdge router.
b. Attach the router to the device
template.
1
3
2
Configure the vEdge router:
vEdge 5000 Router Quick Start