Planning Activity
Task No.
Cable and interface
equipment
evaluation:
• Cable type
• Connector type
• Cable distance
limitations
• Interface
equipment
(transceivers)
5
EMI evaluation:
• Distance
limitations for
signaling
• Site wiring
• RFI levels
6
2
Verify that the power supply installed in the chassis has a dedicated AC source circuit.
3
UPS: uninterruptable power supply.
4
EMI: electromagnetic interference.
5
RFI: radio frequency interference.
Contact and Site Information
Use the following worksheet to record contact and site information.
Table 11: Contact and Site Information
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
Cisco UCS X9508 Server Chassis Installation Guide
119
Site Planning and Maintenance Records
Contact and Site Information
Содержание UCS X9508
Страница 6: ...Cisco UCS X9508 Server Chassis Installation Guide vi Contents ...
Страница 26: ...Cisco UCS X9508 Server Chassis Installation Guide 18 Overview Interpreting LEDs ...
Страница 31: ...Cisco UCS X9508 Server Chassis Installation Guide 23 Installation Handling the Chassis ...
Страница 64: ...Cisco UCS X9508 Server Chassis Installation Guide 56 Installation Repacking the Chassis ...
Страница 124: ...Cisco UCS X9508 Server Chassis Installation Guide 116 Technical Specifications Switzerland ...