3-50
Cisco UCS C240 Server Installation and Service Guide
OL-25761-01
Chapter 3 Maintaining the Server
Installing or Replacing Server Components
Installation Procedures
Use one of the following two procedures, depending on your server version:
•
If you have a version 01 server, use the procedure in
Installing the GPU Card in Version 01 Servers,
page 3-50
. You are required to upgrade the server with a GPU upgrade kit before you can install the
GPU card.
•
If you have a version 02 server, use the procedure in
Installing the GPU Card in Version 02 Servers,
page 3-55
. In this case, the GPU upgrade kit is not required.
See
How to Determine Your Server Version, page 3-49
if you do not know your server version.
Installing the GPU Card in Version 01 Servers
The procedure in this section requires that you use the GPU upgrade kit to ready the server for GPU card
installation.
•
GPU Upgrade Kit, page 3-50
•
Installation Procedure, page 3-51
GPU Upgrade Kit
The GPU upgrade kit includes the following components (see
Figure 3-26
):
•
Two replacement PCIe risers
•
One replacement chassis mid-brace
•
One 8-to-8 pin power-cable adapter (connects between the motherboard and the GPU power cable)
•
One straight GPU power cable (for a single GPU)
•
One “Y” GPU power cable (for dual GPUs)
Figure 3-26
Cisco UCS C240 GPU Kit
1
Chassis mid-brace
4
8-to-8 pin GPU power cable adapter
2
PCIe riser 2
5
Straight GPU power cable
3
PCIe riser 1
6
Y GPU power cable
2
3
1
4
5
6
336562
Содержание UCS C24
Страница 12: ...x Cisco UCS C240 Server Installation and Service Guide OL 25761 01 Preface ...
Страница 14: ...xii Cisco UCS C240 Server Installation and Service Guide OL 25761 01 Preface ...
Страница 156: ...D 2 Cisco UCS C240 Server Installation and Service Guide OL 25761 01 Appendix D Installation for Cisco UCS Integration ...