Cisco UCS C220 M3 Server 
Installation and Service Guide

Covers Server Generation M3

October 29, 2013

Text Part Number: 

OL-25760-01

Содержание UCS C220

Страница 1: ... West Tasman Drive San Jose CA 95134 1706 USA http www cisco com Tel 408 526 4000 800 553 NETS 6387 Fax 408 527 0883 Cisco UCS C220 M3 Server Installation and Service Guide Covers Server Generation M3 October 29 2013 Text Part Number OL 25760 01 ...

Страница 2: ...pyright 1981 Regents of the University of California NOTWITHSTANDING ANY OTHER WARRANTY HEREIN ALL DOCUMENT FILES AND SOFTWARE OF THESE SUPPLIERS ARE PROVIDED AS IS WITH ALL FAULTS CISCO AND THE ABOVE NAMED SUPPLIERS DISCLAIM ALL WARRANTIES EXPRESSED OR IMPLIED INCLUDING WITHOUT LIMITATION THOSE OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF DEA...

Страница 3: ...rver Installation 2 3 Installation Guidelines 2 3 Rack Requirements 2 4 Equipment Requirements 2 4 Slide Rail Adjustment Range 2 4 Installing the Server In a Rack 2 5 Initial Server Setup 2 9 Connecting and Powering On the Server Standalone Mode 2 9 NIC Modes and NIC Redundancy Settings 2 12 System BIOS and CIMC Firmware 2 13 Updating the BIOS and CIMC Firmware 2 13 Accessing the System BIOS 2 14 ...

Страница 4: ...2 Drive Population Guidelines 3 12 Drive Replacement Procedure 3 13 Replacing a Drive Backplane 3 14 Replacing Fan Modules 3 16 Replacing DIMMs 3 18 Memory Performance Guidelines and Population Rules 3 18 DIMM Replacement Procedure 3 21 Replacing CPUs and Heatsinks 3 23 Special Information For Upgrades to Intel E5 2600 v2 Series CPUs 3 23 CPU Configuration Rules 3 23 CPU Replacement Procedure 3 24...

Страница 5: ...tware RAID Key Module 3 51 Replacing Power Supplies 3 52 Wiring a DC Power Supply 3 53 Enabling or Disabling the Internal USB Port 3 55 A P P E N D I X A Server Specifications A 1 Physical Specifications A 1 Environmental Specifications A 2 Power Specifications A 3 450W AC Power Supply A 3 650W AC Power Supply A 4 930W DC Power Supply A 4 A P P E N D I X B Power Cord Specifications B 1 Supported P...

Страница 6: ... Windows and Linux C 11 Downloading the LSI MegaSR Drivers C 12 Microsoft Windows Driver Installation C 12 Linux Driver Installation C 14 RAID Controller Cabling C 19 Cable Routing C 19 Cisco UCS C220 Server Cabling C 20 Backplane and Expander Options C 20 SFF 8 Drive Backplane Cabling C 20 LFF 4 Drive Backplane Cabling C 22 Restoring RAID Configuration After Replacing a RAID Controller C 23 For M...

Страница 7: ...erview of the server Chapter 2 Installing the Server Describes how to install the server in a rack how to cable and power on the server and how to set up the server in standalone mode Chapter 3 Maintaining the Server Describes the server LEDs and buttons identifies the replaceable components of the server and describes how to replace them Appendix A Server Specifications Lists physical environment...

Страница 8: ...ectly can cause physical injuries A warning symbol precedes each warning statement Warning IMPORTANT SAFETY INSTRUCTIONS This warning symbol means danger You are in a situation that could cause bodily injury Before you work on any equipment be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents Use the statement number provided a...

Страница 9: ...befinden sich in einer Situation die zu Verletzungen führen kann Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer Schaltungen und den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut Suchen Sie mit der am Ende jeder Warnung angegebenen Anweisungsnummer nach der jeweiligen Übersetzung in den übersetzten Sicherheitshinweisen die zusammen mit diesem Gerät ausgeliefert w...

Страница 10: ...lo de aviso indica peligro Existe riesgo para su integridad física Antes de manipular cualquier equipo considere los riesgos de la corriente eléctrica y familiarícese con los procedimientos estándar de prevención de accidentes Al final de cada advertencia encontrará el número que le ayudará a encontrar el texto traducido en el apartado de traducciones que acompaña a este dispositivo GUARDE ESTAS I...

Страница 11: ...ção fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham o dispositivo GUARDE ESTAS INSTRUÇÕES Advarsel VIGTIGE SIKKERHEDSANVISNINGER Dette advarselssymbol betyder fare Du befinder dig i en situation med risiko for legemesbeskadigelse Før du begynder arbejde på udstyr skal du være opmærksom på de involverede risici der er ved elektriske kre...

Страница 12: ...xii Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Preface ...

Страница 13: ...vice request and gathering additional information see What s New in Cisco Product Documentation at http www cisco com en US docs general whatsnew whatsnew html Subscribe to What s New in Cisco Product Documentation which lists all new and revised Cisco technical documentation as an RSS feed and deliver content directly to your desktop using a reader application The RSS feeds are a free service ...

Страница 14: ...xiv Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Preface ...

Страница 15: ...in this chapter show an overview of external server features Internal server features are illustrated in Figure 3 5 on page 3 9 The server is orderable in two different versions each with one of two different front panel backplane configurations Cisco UCS C220 small form factor SFF drives with 8 drive backplane Holds up to eight 2 5 inch hard drives or solid state drives Cisco UCS C220 large form ...

Страница 16: ...work link activity LED 3 System status LED 8 Pull out asset tag 4 Fan status LED 9 KVM connector used with KVM cable that provides two USB one VGA and one serial connector 5 Temperature status LED 10 Drives hot swappable up to eight 2 5 inch drives HDD4 HDD5 HDD1 HDD6 HDD2 HDD7 HDD3 HDD8 8 9 10 1 3 4 5 7 6 2 331682 1 Power button Power status LED 6 Power supply status LED 2 Identification button L...

Страница 17: ...2 3 1 7 331683 Table 1 1 Cisco UCS C220 Server Features Chassis One rack unit 1RU chassis Processors Two Intel Xeon E5 2600 Series processors Memory The server provides 16 DIMM1 sockets on the motherboard This provides a possible total of up to 512 GB of industry standard DDR32 memory Multi bit error protection This server supports multi bit error protection Baseboard management BMC running Cisco ...

Страница 18: ...so contains one internal USB 2 0 port on the motherboard that you can use with a USB thumb drive for additional storage Cisco Flexible Flash drives The server can be ordered with up to two optional Cisco Flexible Flash drives SD cards This drive is pre loaded with four virtual drives The four virtual drives contain respectively the Cisco Server Configuration Utility the Cisco Host Upgrade Utility ...

Страница 19: ...1 5 Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Chapter 1 Overview 6 SAS serial attached SCSI 7 SATA serial advanced technology attachment ...

Страница 20: ...1 6 Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Chapter 1 Overview ...

Страница 21: ... Jumpers page 2 15 Note Before you install operate or service a server review the Regulatory Compliance and Safety Information for Cisco UCS C Series Servers for important safety information Warning IMPORTANT SAFETY INSTRUCTIONS This warning symbol means danger You are in a situation that could cause bodily injury Before you work on any equipment be aware of the hazards involved with electrical ci...

Страница 22: ...sentative immediately To inspect the shipment follow these steps Step 1 Remove the server from its cardboard container and save all packaging material Step 2 Compare the shipment to the equipment list provided by your customer service representative and Figure 2 1 Verify that you have all items Step 3 Check for damage and report any discrepancies or damage to your customer service representative H...

Страница 23: ... that the protective device is rated not greater than 250 V 15 A Statement 1005 Warning Installation of the equipment must comply with local and national electrical codes Statement 1074 Caution Do not block the air vents on the top of the server s cover Do not stack another server directly on top of the C220 server Doing so blocks the proper airflow which could result in overheating higher fan spe...

Страница 24: ...the requirements for the standard open racks The rack must be of the following type A standard 19 in 48 3 cm wide four post EIA rack with mounting posts that conform to English universal hole spacing per section 1 of ANSI EIA 310 D 1992 The rack post holes can be square 0 38 inch 9 6 mm round 0 28 inch 7 1 mm 12 24 UNC or 10 32 UNC when you use the supplied slide rails The minimum vertical rack sp...

Страница 25: ...ent at the bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Statement 1006 To install the slide rails and the server into a rack follow these steps Step 1 Open the front securing latch see Figure 2 2 The end of the slide rail assembly marked FRONT has a spring loaded securing latch that must be open before...

Страница 26: ... pegs protrude through the desired holes in the rear rack post Use your finger to hold the rear securing latch open when you insert the rear mounting pegs to their holes When you release the latch it wraps around the rack post and secures the slide rail assembly Figure 2 3 Attaching a Slide Rail Assembly d Attach the second slide rail assembly to the opposite side of the rack Ensure that the two s...

Страница 27: ...ure 2 4 Optional Securing Screws Step 5 Optional Attach the cable management arm CMA to the rear of the slide rails Note The CMA is designed for mounting on either the right or left slide rails These instructions describe an installation to the rear of the right slide rails as viewed from the rear of server a Slide the plastic clip on the inner CMA arm over the flange on the mounting bracket that ...

Страница 28: ... Management Arm Rear of Server Shown Step 6 Continue with the Initial Server Setup section on page 2 9 1 Flange on rear of outer left slide rail 5 Inner CMA arm attachment clip 2 CMA retaining bracket 6 UP orientation marking 3 Flange on rear of right mounting bracket 7 Outer CMA arm attachment clip 4 Flange on rear of outer right slide rail 7 331690 6 5 4 3 1 2 ...

Страница 29: ...pplied power cord to each power supply in your server and then attach the power cord to a grounded AC power outlet See the Power Specifications page A 3 for power specifications Wait for approximately two minutes to let the server boot in standby power during the first bootup You can verify power status by looking at the Power Status LED see Figure 1 1 on page 1 2 Off There is no AC power present ...

Страница 30: ...ct a NIC redundancy and IP setting Cisco Card The ports on an installed Cisco UCS virtual interface card VIC are used to access the CIMC You must select a NIC redundancy and IP setting Note The Cisco Card NIC mode is currently supported only with a Cisco UCS VIC that is installed in PCIe slot 1 See also Special Considerations for Cisco UCS Virtual Interface Cards page 3 37 d Use this utility to ch...

Страница 31: ...y settings require you to connect to two ports Step 5 Use a browser and the IP address of the CIMC to connect to the CIMC Setup Utility The IP address is based upon the settings that you made in Step 3 either a static address or the address assigned by your DHCP server Note The default user name for the server is admin The default password is password To manage the server see the Cisco UCS C Serie...

Страница 32: ...t select a NIC redundancy and IP setting Shared LOM The 1 Gb Ethernet ports are used to access the CIMC You must select a NIC redundancy and IP setting Cisco Card The ports on an installed Cisco UCS virtual interface card VIC are used to access the CIMC You must select a NIC redundancy and IP setting Note The Cisco Card NIC mode is currently supported only with a Cisco UCS VIC that is installed in...

Страница 33: ... method for systems running firmware level 1 2 or later Use the Cisco Host Upgrade Utility to simultaneously upgrade the CIMC BIOS LOM LSI storage controller and Cisco UCS P81E VIC firmware to compatible levels See the Cisco Host Upgrade Utility Quick Reference Guide for your firmware level at the documentation roadmap link below Note Your system firmware must be at minimum level 1 2 to use the Ci...

Страница 34: ...ootup Note The version and build of the current BIOS are displayed on the Main page of the utility Step 2 Use the arrow keys to select the BIOS menu page Step 3 Highlight the field to be modified by using the arrow keys Step 4 Press Enter to select the field that you want to change and then modify the value in the field Step 5 Press the right arrow key until the Exit menu screen is displayed Step ...

Страница 35: ... 15 Using the BIOS Recovery Header J41 page 2 16 Using the Clear CMOS Header J37 page 2 19 Header Locations on the Motherboard See Figure 2 6 The block of headers is shown in red The individual headers are shown in the magnified view The pin numbering is the same for all headers in the block Figure 2 6 Service Header Locations 1 J41 BIOS RCVR BOOT 2 J37 Clear CMOS FAN1 FAN2 FAN3 FAN4 FAN4 FAN5 PSU...

Страница 36: ...for recovering the BIOS Try procedure 1 first then if that does not recover the BIOS use procedure 2 Note The server must have CIMC version 1 4 6 or later to use these procedures Procedure 1 Reboot With recovery cap File Step 1 Download the BIOS update package and extract it to a temporary location Step 2 Copy the contents of the extracted recovery folder to the root directory a USB thumb drive Th...

Страница 37: ...r 2 Installing the Server Service Headers and Jumpers Note During the BIOS update the CIMC will shut down the server and the screen will be blank for about 10 minutes Do not unplug the power cords during this update The CIMC will power on the server after the update is complete ...

Страница 38: ...he shorting jumper to pins 2 and 3 of the J41 header see Figure 2 6 Step 8 Reconnect AC power cords to the server The server powers up to standby power mode Step 9 Insert the USB thumb drive that you prepared in Step 2 into a USB port on the server Step 10 Return the server to main power mode by pressing the Power button on the front panel The server boots with the updated BIOS boot block When the...

Страница 39: ... the top cover as described in Removing and Replacing the Server Top Cover page 3 8 Step 5 Move the shorting jumper to pins 2 and 3 of the J37 header see Figure 2 6 Step 6 Reinstall the top cover and reconnect AC power cords to the server The server powers up to standby power mode indicated when the Power LED on the front panel is amber Step 7 Return the server to main power mode by pressing the P...

Страница 40: ...2 20 Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Chapter 2 Installing the Server Service Headers and Jumpers ...

Страница 41: ...r CLI interfaces See the user documentation for your firmware release at the following URL http www cisco com en US products ps10739 products_installation_and_configuration_guides_list html Server Configuration Utility Cisco has also developed the Cisco Server Configuration Utility for C Series servers which can aid and simplify the following tasks Monitoring server inventory and health Diagnosing...

Страница 42: ...status LED 6 Power supply status LED 2 Identification button LED 7 Network link activity LED 3 System status LED 8 Hard drive fault LED 4 Fan status LED 9 Hard drive activity LED 5 Temperature status LED Table 3 1 Front Panel LEDs Definitions of States LED Name State Power button Power status LED Off There is no AC power to the server Amber The server is in standby power mode Power is supplied onl...

Страница 43: ...erature status Green The server is operating at normal temperature Amber steady One or more temperature sensors have exceeded a warning threshold Amber blinking One or more temperature sensors have exceeded a critical threshold Power supply status Green All power supplies are operating normally Amber steady One or more power supplies are in a degraded operational state Amber blinking One or more p...

Страница 44: ...y fault Off The power supply is operating normally Amber blinking An event warning threshold has been reached but the power supply continues to operate Amber solid A critical fault threshold has been reached causing the power supply to shut down for example a fan failure or an over temperature condition Power supply status AC power supplies Off There is no AC power to the power supply Green blinki...

Страница 45: ...affic is present on the active link 1 Gb Ethernet link speed Off link speed is 10 Mbps Amber link speed is 100 Mbps Green link speed is 1 Gbps 1 Gb Ethernet link status Off No link is present Green Link is active Green blinking Traffic is present on the active link Identification Off The Identification LED is not in use Blue The Identification LED is activated Table 3 2 Rear Panel LEDs Definitions...

Страница 46: ...t be connected to the server for these LEDs to be operate See Figure 3 3 for the locations of these internal LEDs Figure 3 3 Internal Diagnostic LED Locations 1 Fan module fault LEDs one next to each fan connector on the motherboard 2 DIMM fault LEDs one next to each DIMM socket on the motherboard Table 3 3 Internal Diagnostic LEDs Definition of States LED Name State Internal diagnostic LEDs all O...

Страница 47: ...or and the cooling fans and it is safe to power off the server from this mode You can invoke a graceful shutdown or an hard shutdown by using either of the following methods Use the CIMC management interface Use the Power button on the server front panel To use the Power button follow these steps Step 1 Check the color of the Power Status LED see the Front Panel LEDs section on page 3 2 Green the ...

Страница 48: ...bout one half inch 1 27 cm until it stops d Lift the top cover straight up from the server and set it aside Step 2 Replace the top cover a Place the cover on top of the server about one half inch 1 27 cm behind the lip of the chassis front cover panel The cover should sit flat Note Make sure that the wrap around flanged edge on the rear of the cover is correctly aligned with the chassis features s...

Страница 49: ...for LSI battery backup unit or SuperCap Power Module air baffle not shown 12 Half height PCIe riser PCIe slot 2 4 Cooling fan modules five 13 Cisco Flexible Flash card slot SD2 socket on PCIe riser 2 5 SCU upgrade ROM header PBG DYNAMIC SKU 14 Cisco Flexible Flash card slot SD1 socket on PCIe riser 2 6 DIMM slots on motherboard sixteen 15 Internal USB 2 0 port 7 CPUs and heatsinks two 16 Power sup...

Страница 50: ...r the front Color Coded Touch Points This server has color coded touch points that indicate thumbscrews and latches on replaceable and hot swappable components Hot swappable components have green plastic touch points This includes the internal cooling fans and the power supplies An exception is the drive trays on the front panel which are hot swappable but not green Some replaceable but non hot sw...

Страница 51: ...ic server that you are servicing when you go to the opposite side of the rack You can also activate these LEDs remotely by using the CIMC interface See the Status LEDs and Buttons section on page 3 2 for locations of these LEDs This section describes how to install and replace server components and it includes the following topics Replacing Hard Drives or Solid State Drives page 3 12 Replacing a D...

Страница 52: ...to four 3 5 inch hard drives The drive bay numbering is shown in Figure 3 6 Figure 3 6 Drive Numbering Small Form Factor Figure 3 7 Drive Numbering Large Form Factor Observe these drive population guidelines for optimum performance When populating drives add drives to the lowest numbered bays first Keep an empty drive blanking tray in any unused bays to ensure proper air flow You can mix hard driv...

Страница 53: ...ay See Figure 3 8 b Grasp and open the ejector lever and then pull the drive tray out of the slot c If you are replacing an existing drive remove the four drive tray screws that secure the drive to the tray and then lift the drive out of the tray Step 2 Install a new drive a Place a new drive in the empty drive tray and install the four drive tray screws b With the ejector lever on the drive tray ...

Страница 54: ...ll cables from the backplane f Loosen the two captive thumbscrews that secure the backplane to the chassis floor see Figure 3 9 g Loosen the single captive thumbscrew that secures the backplane to the operations panel assembly see Figure 3 9 The operations panel assembly plugs into a socket on the front side of the backplane h Push the operations panel assembly forward and out the front of the cha...

Страница 55: ...wn removed from server 2 Supporting hooks on chassis three 6 Captive thumbscrews two securing backplane to chassis floor 3 Operations panel assembly handle 7 Slotted holes for supporting hooks three 4 Captive thumbscrew one securing backplane to operations panel 8 Captive thumbscrew securing backplane to operations panel FAN1 FAN1 FAN1 FAN2 FAN2 FAN2 FAN3 FAN3 FAN3 FAN4 FAN4 FAN4 FAN4 FAN5 FAN5 FA...

Страница 56: ...er for more than one minute with any fan module removed Step 1 Remove a fan module that you are replacing see Figure 3 11 a Slide the server out the front of the rack far enough so that you can remove the top cover You might have to detach cables from the rear panel to provide clearance Caution If you cannot safely view and access the component remove the server from the rack b Remove the top cove...

Страница 57: ...r Components Figure 3 11 Replacing Fan Modules 1 Rubber dampening gaskets two on each fan module 3 Fan connector to motherboard 2 Fan module fault LED on motherboard one for each fan module FAN1 FAN1 FAN1 FAN2 FAN2 FAN2 FAN3 FAN3 FAN3 FAN4 FAN4 FAN4 FAN4 FAN5 FAN5 FAN5 PSU2 PCIe1 PCIe2 PSU1 CPU1 CPU2 SAS1 SAS2 SAS1 SAS2 1 2 3 331724 ...

Страница 58: ...port 3rd party DIMMs Using non Cisco DIMMs in the server might result in system problems or damage to the motherboard Note To ensure the best server performance it is important that you are familiar with memory performance guidelines and population rules before you install or replace memory Memory Performance Guidelines and Population Rules This section describes the type of memory that the server...

Страница 59: ...IMM slots for example channel A slots A1 and A2 A channel can operate with one or two DIMMs installed If a channel has only one DIMM populate slot 1 first the blue slot When both CPUs are installed populate the DIMM slots of each CPU identically Fill blue slots in the channels first A1 E1 B1 F1 C1 G1 D1 H1 Fill black slots in the channels second A2 E2 B2 F2 C2 G2 D2 H2 Any DIMM installed in a DIMM...

Страница 60: ...MM Operation Power Saving Mode You can enable low voltage 1 35 V DIMM operation for all DIMMs in the server There is a setting in the BIOS Setup utility that you can use to change the DDR memory mode to Power Saving mode as described in the following procedure Step 1 Enter the BIOS setup utility by pressing the F2 key when prompted during bootup Step 2 Select the Advanced tab Step 3 Select Low Vol...

Страница 61: ...enable memory mirroring populate the DIMM slots in the order shown in Table 3 5 DIMM Replacement Procedure This section includes the following topics Identifying a Faulty DIMM page 3 21 Replacing DIMMs page 3 21 Identifying a Faulty DIMM Each DIMM slot has a corresponding DIMM fault LED See Figure 3 3 for the locations of these LEDs The LEDs light amber to indicate a faulty DIMM Power must be pres...

Страница 62: ...MM slot then lift the DIMM out of the slot Step 2 Install a new DIMM Note Before installing DIMMs refer to the population guidelines See Memory Performance Guidelines and Population Rules page 3 18 f Align the new DIMM with the empty slot on the motherboard Use the alignment key in the DIMM slot to correctly orient the DIMM g Push down evenly on the top corners of the DIMM until it is fully seated...

Страница 63: ...already at the required levels shown in Table 3 6 you can replace the CPU hardware by using the procedure in this section If your server s firmware and or Cisco UCS Manager software is earlier than the required levels use the instructions in the Cisco UCS C Series Servers Upgrade Guide for Intel E5 2600 v2 Series CPUs to upgrade your firmware After you upgrade the software return to the procedure ...

Страница 64: ...CS CPU EP2 PNP for v2 12 core CPUs purple To install or replace a CPU heatsink and CPU follow these steps Step 1 Remove the CPU and heatsink that you are replacing a Power off the server as described in the Shutting Down and Powering Off the Server section on page 3 7 b Slide the server out the front of the rack far enough so that you can remove the top cover You might have to detach cables from t...

Страница 65: ... a protective cap that is intended to prevent bent contact pins Use the tool as shown in Figure 3 14 to grasp the protective cap and then pivot to remove the cap Figure 3 14 Protective Cap Removal Tool Step 3 Remove an old CPU a Set the Pick and Place tool on the CPU in the socket aligning the arrow on the tool with the registration mark on the socket the small triangular mark See Figure 3 15 b Pr...

Страница 66: ...tal that is included in the kit Align the registration mark on the corner of the CPU with the arrow on the corner of the pedestal see Figure 3 16 b Press down on the top button of the tool to lock it open c Set the Pick and Place tool on the CPU pedestal aligning the arrow on the tool with the arrow on the corner of the pedestal Make sure that the tabs on the tool are fully seated in the slots on ...

Страница 67: ...Remove the empty tool c Close the hinged CPU cover plate d Clip down the CPU retaining latch with the icon then clip down the CPU retaining latch with the icon See Figure 3 13 Step 6 Install a heatsink Caution The heatsink must have a new undamaged thermal pad on the heatsink to CPU surface to ensure proper cooling If you are replacing a heatsink that was previously used you must remove the old th...

Страница 68: ...te If you do not have a syringe of thermal grease you can order a spare UCS CPU GREASE2 Figure 3 17 Thermal Grease Application Pattern d For a new heatsink peel the protective film from the thermal pad that is on the bottom of the new heatsink Note Do not apply a syringe of thermal grease if you are installing a new heatsink that already has a pre applied thermal pad e Align the heatsink captive s...

Страница 69: ...l UCS CPU EP PNP for 10 8 6 4 or 2 core CPUs green or UCS CPU EP2 PNP for v2 12 core CPUs purple Scenario 2 You are replacing the existing heatsinks Heat sink UCSC HS C220M3 Heat sink cleaning kit UCSX HSCK Intel CPU Pick n Place tool UCS CPU EP PNP for 10 8 6 4 or 2 core CPUs green or UCS CPU EP2 PNP for v2 12 core CPUs purple A CPU heatsink cleaning kit is good for up to four CPU and heatsink cl...

Страница 70: ... described in the Shutting Down and Powering Off the Server section on page 3 7 b Slide the server out the front of the rack far enough so that you can remove the top cover You might have to detach cables from the rear panel to provide clearance Caution If you cannot safely view and access the component remove the server from the rack c Remove the top cover as described in Removing and Replacing t...

Страница 71: ... Power off the server as described in the Shutting Down and Powering Off the Server section on page 3 7 b Slide the server out the front of the rack far enough so that you can remove the top cover You might have to detach cables from the rear panel to provide clearance Caution If you cannot safely view and access the component remove the server from the rack c Remove the top cover as described in ...

Страница 72: ...s of the mezzanine card evenly to engage the card s connector with the socket on the motherboard c Tighten the single captive thumbscrew that secures the mezzanine card to the motherboard standoff d Reconnect cables to the mezzanine card See RAID Controller Cabling page C 19 for more information e Replace the top cover f Replace the server in the rack replace cables and then power on the server by...

Страница 73: ...rack c Remove the top cover as described in Removing and Replacing the Server Top Cover section on page 3 8 d Lift straight up on both ends of the PCIe riser to disengage its circuit board from the socket on the motherboard e If the riser has a card installed remove the card from the riser Step 2 Install a new PCIe riser a If you removed a card from the old PCIe riser install the card to the new r...

Страница 74: ...r Replacing Server Components Figure 3 21 Replacing the PCIe Riser 1 Chassis alignment peg for PCIe riser 1 3 Chassis alignment pegs for PCIe riser 2 2 Rear alignment tabs FAN1 FAN1 FAN1 FAN2 FAN2 FAN2 FAN3 FAN3 FAN3 FAN4 FAN4 FAN4 FAN4 FAN5 FAN5 FAN5 PSU2 PCIe1 PCIe2 PSU1 CPU1 CPU2 SAS1 SAS2 SAS1 SAS2 3 2 1 331713 ...

Страница 75: ... Fusion ioDrive2 Storage Accelerator Cards page 3 37 RAID Controller Card Cable Routing page 3 38 Installing Multiple PCIe Cards and Resolving Limited Resources page 3 38 PCIe Slots The server contains two toolless PCIe risers for horizontal installation of PCIe cards See Figure 3 22 and Table 3 7 for a description of the PCIe slots on these risers Figure 3 22 Rear Panel Showing PCIe Slots PSU1 PS...

Страница 76: ... cover as described in the Removing and Replacing the Server Top Cover section on page 3 8 d Remove any cables from the ports of the PCIe card that you are replacing Tip Label the cables when you disconnect them to aid correct connection to the new card e Lift straight up on both ends of the PCIe riser to disengage it from the socket on the motherboard f Pull evenly on both ends of the PCIe card t...

Страница 77: ...on or Cisco Card NIC Mode Minimum CIMC Firmware Minimum VIC Firmware For Use With UCS Integration Minimum Nexus OS on an Upstream Nexus Fabric Interconnect Cisco UCS VIC P81E N2XX ACPCI01 1 PCIE 1 PCIE 1 1 4 4 2 0 2 5 0 Cisco UCS VIC 1225 UCSC PCIE CSC 02 1 PCIE 1 PCIE 1 1 4 6 2 1 0 5 0 Cisco UCS VIC1225T UCSC PCIE C10T 02 1 PCIE 1 PCIE 12 2 The Cisco UCS VIC1225T is not supported for UCS integrat...

Страница 78: ...ntroller and reports the following error in the Error Manager page of the BIOS Setup utility ERROR CODE SEVERITY INSTANCE DESCRIPTION 146 Major N A PCI out of resources error Major severity requires user intervention but does not prevent system boot To resolve this issue disable the Option ROMs that are not needed for system booting The BIOS Setup Utility provides the setup options to enable or di...

Страница 79: ...e following symptoms have been observed The system might get stuck in an infinite reset loop The BIOS might appear to hang while initializing PCIe devices The PCIe option ROMs might take excessive time to complete which appears to lock up the system PCIe boot devices might not be accessible from the BIOS PCIe option ROMs might report initialization errors These errors are seen before the BIOS pass...

Страница 80: ...ternal slots for these cards are on the circuit board of PCIe riser 2 see Figure 3 23 Note Dual cards are supported only with CIMC 1 5 1 or later With releases earlier than CIMC 1 5 1 only a single card is supported and it must be in slot SD1 The Cisco Flexible Flash card is pre installed with three software bundles each on one of four preconfigured virtual drives VDs The fourth VD allows you to i...

Страница 81: ...ime boot option When you want to boot the hypervisor HV VD you boot it with a permanent boot order selection See the following topics in this section Booting the Cisco SCU and Cisco HUU Software VDs page 3 41 Booting the Hypervisor VD page 3 41 Booting the Cisco SCU and Cisco HUU Software VDs You can access the preinstalled Cisco SCU and Cisco HUU software bundles on a Cisco Flexible Flash card by...

Страница 82: ...sco com go unifiedcomputing c series doc Synchronizing RAID After Installing a Second Cisco FlexFlash Drive After you install or replace a second Cisco FlexFlash drive you must synchronize the RAID partition by using the Cisco UCS Server Configuration Utility SCU The SCU provides an option to synchronize the Hypervisor VD configured as a RAID 1 disk This feature is available only when both Cisco F...

Страница 83: ...rack far enough so that you can remove the top cover You might have to detach cables from the rear panel to provide clearance Caution If you cannot safely view and access the component remove the server from the rack c Remove the top cover as described in Removing and Replacing the Server Top Cover section on page 3 8 d Locate the Cisco Flexible Flash card that you are replacing on PCIe riser 2 Se...

Страница 84: ...the Pre Installed Cisco Flexible Flash Card page 3 40 This overwrites data on the SD card where Cisco stores the configuration metadata a Insert the Cisco Flexible Flash card into the slot with the label side facing outward Note Dual cards are supported only with CIMC 1 5 1 or later With releases earlier than CIMC 1 5 1 only a single card is supported and it must be in slot SD1 see Figure 3 23 b P...

Страница 85: ...of used batteries according to the manufacturer s instructions Statement 1015 To replace the RAID controller BBU or SCPM follow these steps Step 1 Remove a backup unit see Figure 3 24 a Power off the server as described in the Shutting Down and Powering Off the Server section on page 3 7 b Slide the server out the front of the rack far enough so that you can remove the top cover You might have to ...

Страница 86: ...0 Server Installation and Service Guide OL 25760 01 Chapter 3 Maintaining the Server Installing or Replacing Server Components Figure 3 24 RAID Backup Unit Mounting Location 1 RAID backup unit mounting location 1 331725 ...

Страница 87: ... riser 1 See Figure 3 25 If there is no card installed in PCIe riser 1 you can access the TPM socket Go to Step 2 If there is a card installed in PCIe riser 1 remove PCIe riser 1 from the chassis See Replacing a PCIe Riser page 3 33 for details Step 2 Install a TPM see Figure 3 25 a Locate the TPM socket on the motherboard as shown in Figure 3 25 b Align the connector that is on the bottom of the ...

Страница 88: ... page 3 48 Figure 3 25 TPM Socket Location on Motherboard Enabling the Intel Trusted Execution Technology TXT Feature For the TPM Intel TXT provides greater protection for information that is used and stored on the business server A key aspect of that protection is the provision of an isolated execution environment and associated sections of memory where operations can be conducted on sensitive da...

Страница 89: ... feature a On the Advanced tab select Intel TXT LT SX Configuration to open the Intel TXT LT SX Hardware Support screen Note The Intel Trusted Execution Technology feature can be enabled only when the server has a TPM installed on the TPM header b Set TXT Support to Enabled Step 3 On the same screen verify that the Intel Virtualization Technology VT and the Intel VT for Directed I O VT d features ...

Страница 90: ...placing the Server Top Cover page 3 8 Step 2 Remove the SCU upgrade ROM module a Locate the module on the motherboard see Figure C 1 b Grasp the printed circuit board of the module and lift it from the header Note The module has a small retention feature that must have clearance from the header before the module can be pulled up Tilt the module back then pull up as shown in Figure 3 26 Step 3 Inst...

Страница 91: ... and Replacing the Server Top Cover page 3 8 Step 2 Remove the software RAID key module a Locate the module on the motherboard see Figure C 1 b Grasp the printed circuit board of the module and lift it from the header Note The module must have clearance from the retention clip on the header before the module can be pulled up Open the retention clip then pull up as shown in Figure 3 27 Step 3 Insta...

Страница 92: ...ure 3 28 a Perform one of the following actions If your server has only one power supply shut down and power off the server as described in the Shutting Down and Powering Off the Server section on page 3 7 If your server has two power supplies you do not have to shut down the server b Remove the power cord from the power supply that you are replacing For a DC power supply release the electrical co...

Страница 93: ...e with national and local wiring regulations Statement 1045 Warning When installing or replacing the unit the ground connection must always be made first and disconnected last Statement 1046 Warning Installation of the equipment must comply with local and national electrical codes Statement 1074 Warning Hazardous voltage or energy may be present on DC power terminals Always replace cover when term...

Страница 94: ...es of insulation off the DC wires that you will use Step 4 Orient the connector as shown in Figure 3 29 with the orange plastic button toward the top Step 5 Use a small screwdriver to depress the spring loaded wire retainer lever on the lower spring cage wire connector Insert your green ground wire into the aperture and then release the lever Step 6 Use a small screwdriver to depress the wire reta...

Страница 95: ...abled or disabled in the server BIOS To enable or disable the internal USB port follow these steps Step 1 Enter the BIOS Setup utility by pressing the F2 key when prompted during bootup Step 2 Navigate to the Advanced tab Step 3 On the Advanced tab select USB Configuration Step 4 On the USB Configuration page select USB Ports Configuration Step 5 Scroll to USB Port Internal press Enter and then se...

Страница 96: ...3 56 Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Chapter 3 Maintaining the Server Installing or Replacing Server Components ...

Страница 97: ...ludes the following sections Physical Specifications page A 1 Environmental Specifications page A 2 Power Specifications page A 3 Physical Specifications Table A 1 lists the physical specifications for the server Table A 1 Physical Specifications Description Specification Height 1 7 in 4 3 cm Width 16 9 in 42 9 cm Depth 28 5 in 72 4 cm Weight fully loaded chassis 35 6 lb 16 1 Kg ...

Страница 98: ...Specification Temperature operating 41 to 104 F 5 to 40 C Derate the maximum temperature by 1 C per every 305 meters of altitude above sea level Temperature non operating 40 to 149 F 40 to 65 C Humidity RH noncondensing 10 to 90 Altitude operating 0 to 10 000 feet Altitude non operating 0 to 40 000 feet Sound power level Measure A weighted per ISO7779 LwAd Bels Operation at 73 F 23 C 5 4 Sound pre...

Страница 99: ...content_elements flash dataCenter cisco_ucs_power_calculator Note Do not mix power supply types in the server Both power supplies must be identical 450W AC Power Supply Table A 3 lists the specifications for each 450 W AC power supply Cisco part number UCSC PSU 450W Table A 3 Power Supply Specifications Description Specification AC input voltage range Low range 100 VAC to 120 VAC High range 200 VA...

Страница 100: ...264 VAC self ranging 180 to 264 VAC nominal AC input frequency Range 47 to 63 Hz single phase 50 to 60Hz nominal AC line input current steady state 7 6 A peak at 100 VAC 3 65 A peak at 208 VAC Maximum output power for each power supply 650 W Power supply output voltage Main power 12 VDC Standby power 12 VDC Table A 5 930 W DC Power Supply Specifications Description Specification Class RSP1 Input D...

Страница 101: ... provided with the server are supported Table B 1 lists the power cords for the server power supplies Table B 1 Supported Power Cords for the Server Description Length Power Cord Reference Illustration Feet Meters SFS 250V 10A AR Power Cord 250 VAC 10 A IRAM 2073 Plug Argentina 8 2 2 5 Figure B 1 CAB 9K10A AU 250 VAC 10 A 3112 Plug Australia 8 2 2 5 Figure B 2 SFS 250V 10A CN Power Cord 250 VAC 10...

Страница 102: ...13 A IEC60320 Plug North America 6 6 2 0 Figure B 10 CAB N5K6A NA Power Cord 250 VAC 13 A NEMA 6 15 Plug North America 8 2 2 5 Figure B 11 CAB 9K12A NA Power cord 125 VAC 13 A NEMA 5 15 Plug North America 8 2 2 5 Figure B 12 CAB C13 CBN Cabinet Jumper Power Cord 250 VAC 10 A C13 C14 Connectors 2 2 0 68 Figure B 13 CAB C13 C14 2M Cabinet Jumper Power Cord 250 VAC 10 A C13 C14 Connectors 6 6 2 0 Fig...

Страница 103: ...Figure B 1 through Figure B 15 Figure B 1 SFS 250V 10A AR Figure B 2 CAB 9K10A AU Figure B 3 SFS 250V 10A CN 186571 2500 mm Cordset rating 10 A 250 500 V MAX Length 8 2 ft Plug EL 219 IRAM 2073 Connector EL 701 IEC60320 C13 Plug EL 206 A S 3112 2000 Cordset rating 10 A 250 V 500V Length 2500mm 186581 Connector EL 701C IEC 60320 C15 Cordset rating 10A 250V 2500 mm Plug EL 218 CCEE GB2009 186573 Con...

Страница 104: ...e B 4 CAB 9K10A EU Figure B 5 SFS 250V 10A ID Figure B 6 SFS 250V 10A IS Connector VSCC15 Cordset rating 10A 16 A 250 V Length 8 ft 2 in 2 5 m Plug M2511 186576 OVE Cordset rating 16A 250V 2500mm Plug EL 208 187490 Connector EL 701 Cordset rating 10A 250V 500V MAX 2500 mm Plug EL 212 SI 32 186574 Connector EL 701B IEC60320 C13 EL 212 16A 250V ...

Страница 105: ...Figure B 8 CAB 9K10A SW Figure B 9 CAB 9K10A UK Plug I 3G CEI 23 16 Connector C15M EN60320 C15 Cordset rating 10 A 250 V Length 8 ft 2 in 2 5 m 186575 Plug MP232 R Cordset rating 10 A 250 V Length 8 ft 2 in 2 5 m 186578 Connector IEC 60320 C15 Plug Cordset rating 10 A 250 V 500 V MAX Length 2500mm 186580 Connector EL 701C EN 60320 C15 EL 210 BS 1363A 13 AMP fuse ...

Страница 106: ...0 CAB AC 250V 13A Figure B 11 CAB N5K6A NA Figure B 12 CAB 9K12A NA Cordset rating 13A 250V 6 6 feet 79 2m Plug EL312MoldedTwistlock NEMA L6 20 186568 Connector EL 701 IEC60320 C13 Cordset rating 10 A 250 V Length 8 2 ft 186570 Plug NEMA 6 15P Connector IEC60320 C13 Connector IEC60320 C15 Cordset rating 13A 125V 8 2 feet 2 5m Plug NEMA 5 15P 192260 ...

Страница 107: ... Figure B 13 CAB C13 CBN Jumper Power Cord 0 68 m Figure B 14 CAB C13 C14 2M Jumper Power Cord 2 m Figure B 15 CAB C13 C14 AC Jumper Power Cord 3 m Cordset rating 10A 250V 686mm Plug SS10A 186569 Connector HS10S Cordset rating 10A 250V 2 0 m Plug SS10A 336014 Connector HS10S Cordset rating 10A 250V 3 0 m Plug SS10A 336013 Connector HS10S ...

Страница 108: ...B 8 Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Appendix B Power Cord Specifications Supported Power Cords and Plugs ...

Страница 109: ...s and Required Cables page C 2 RAID Controller Migration page C 6 Factory Default Option ROM Settings page C 5 Mixing Drive Types in RAID Groups page C 4 RAID Backup Units page C 4 RAID Controller Migration page C 6 Embedded MegaRAID Controller page C 7 RAID Controller Cabling page C 19 Restoring RAID Configuration After Replacing a RAID Controller page C 23 For More Information page C 23 ...

Страница 110: ...uires an optional SCU upgrade ROM module on the motherboard No 0 1 54 10 4 Support for RAID 5 requires an optional RAID 5 software key module on the motherboard 4 drives 1 mini SAS UCSC CABLE15 8 drives 2 mini SAS UCSC CABLE1 5 UCSC CABLE1 is a kit of two mini SAS cables This pair of cables is shipped with every new system Cisco UCS RAID SAS 2008M 8i PID UCSC RAID MZ C220 Mezzanine 8 internal No 0...

Страница 111: ... mini SAS UCSC CABLE3 Cisco UCS RAID SAS 2008M 8i PID UCSC RAID MZ C220 Mezzanine 4 internal No 0 1 1E 10 4 drives 1 mini SAS UCSC CABLE3 Cisco UCS RAID SAS 2008M 8i PID UCSC RAID 11 C220 Includes RAID 5 50 Mezzanine 4 internal No 0 1 1E 5 10 50 4 drives 1 mini SAS UCSC CABLE3 LSI MegaRAID SAS 9266CV 8i The cache memory of this controller is ECC protected PCIe 4 internal SCPM 0 1 5 6 10 50 60 4 dr...

Страница 112: ...e in the RAID group Never mix HDDs and SSDs in the same RAID group RAID Backup Units This server supports installation of one SuperCap Power Module SCPM The unit mounts to a holder on the left side air baffle see Figure 3 24 Note The iBBU09 battery backup unit BBU has been phased out by Cisco and replaced with the SuperCap power module SCPM If you are replacing a BBU order the SCPM for the replace...

Страница 113: ...220 SFF 8 HDD C220 LFF 4 HDD 1 Enabled Not allowed1 1 You cannot use the embedded SW RAID and HW RAID mezzanine or PCIe card at the same time Not allowed Not allowed Always enabled All other OPROM is disabled C220 SFF 8 HDD C220 LFF 4 HDD 1 Not allowed Not allowed2 2 In single CPU configurations the mezzanine card slot is not supported Installed PCIe slot 1 enabled3 3 In single CPU configurations ...

Страница 114: ...to SW RAID Allowed None no drives Onboard SCU Storage support is Disabled in BIOS Allowed 1 Install card 2 Install cables Allowed 1 Install desired upgrade modules to motherboard 2 Enable SCU storage support in BIOS 3 Install cables Embedded SW RAID Onboard SCU Storage support is Enabled in BIOS Caution Data migration from SW RAID to HW RAID is not supported and could result in data loss Allowed o...

Страница 115: ...edded controller see RAID Controller Migration page C 6 Instructions for installing upgrade modules and enabling the embedded controller in the BIOS are included here for those upgrading a server with no RAID controller or drives Caution Data migration from SW RAID embedded RAID to HW RAID a controller card is not supported and could result in data loss Migrations from SW RAID to HW RAID are suppo...

Страница 116: ...can configure a RAID 5 VD using three or more PDs This level supports up to eight PDs and eight VDs RAID 10 This is a spanned VD that is RAID 0 is implemented on two or more RAID 1 VDs This level supports up to eight PDs two to four RAID 1 volumes spanned and one VD Note None of these RAID levels require drives of the same size The smallest drive in the array determines the size of the VD Note An ...

Страница 117: ...are routed along the chassis wall see Figure C 1 Step 2 Align the connector on the SCU upgrade ROM module with the pins on the header then gently push the connector onto the pins Step 3 Replace the top cover Step 4 Replace the server in the rack replace cables and then power on the server by pressing the Power button Step 5 Continue with either Installing a Software RAID Key Module for Embedded RA...

Страница 118: ...Replace the server in the rack replace cables and then power on the server by pressing the Power button Step 5 Continue with Enabling the Embedded RAID Controller in the BIOS page C 10 Enabling the Embedded RAID Controller in the BIOS When you order the server with this controller the controller is enabled in the BIOS at the factory Note The default setting in the BIOS for the embedded controller ...

Страница 119: ... Launching the LSI Embedded RAID Configuration Utility Launch the utility by pressing Ctrl M when you see the prompt during system boot For more information about using the Embedded MegaRAID software to configure your disk arrays see the LSI Embedded MegaRAID Software User Guide Installing LSI MegaSR Drivers For Windows and Linux Note The required drivers for this controller are already installed ...

Страница 120: ... save the drivers ISO file Microsoft Windows Driver Installation This section explains the steps to install the LSI MegaSR driver in a Windows installation This section contains the following topics Windows Server 2008R2 Driver Installation page C 12 Updating the Windows Driver page C 13 Linux Driver Installation page C 14 Windows Server 2008R2 Driver Installation Perform the following steps to in...

Страница 121: ...the wizard as required for your preferences and company standards Step 11 When Windows prompts you with Where do you want to install Windows install the drivers for embedded MegaRAID a Click Load Driver You are prompted by a Load Driver dialog to select the driver to be installed b Connect the USB thumb drive that you prepared in Step 3 to the target server c On the Windows Load Driver dialog that...

Страница 122: ...This section describes how to prepare physical Linux installation diskettes from the driver image files using either the Windows operating system or the Linux operating system Note Alternatively you can mount the dud img file as a virtual floppy disk as described in the installation procedures Preparing Physical Installation Diskettes With the Windows Operating System Under Windows you can use the...

Страница 123: ...nder Red Hat Linux and SuSE Linux you can use a driver diskette utility to create disk images from image files Perform the following steps to create the driver update disk Step 1 Download the Cisco UCS C Series drivers ISO as described in Downloading the LSI MegaSR Drivers page C 12 and save it to your Linux system that has a diskette drive Step 2 Extract the dud img file a Burn the ISO image to a...

Страница 124: ... folders to the location of the embedded MegaRAID drivers OS Storage Intel C600 c Copy the dud driver version img file to a temporary location on your workstation Step 4 Start the Linux driver installation using one of the following methods To install from local media Connect an external USB DVD drive to the server and then insert the first RHEL install disc into the drive Then continue with Step ...

Страница 125: ...m Installing the SUSE Linux Enterprise Server Driver For the specific supported OS versions see the Hardware and Software Interoperability Matrix for your server release This section describes the installation of the SuSE Linux Enterprise Server driver on a system with the embedded MegaRAID stack Us e the following procedure to install the SLES drivers Step 1 Create a RAID drive group using the LS...

Страница 126: ...ect the physical disc or virtual DVD and press Enter The SLES installation begins when the image is booted Step 9 When the first SLES screen appears select Installation on the menu Step 10 Type one of the following in the Boot Options field For SLES 11 and SLES 11 SP1 32 and 64 bit type brokenmodules ahci For SLES 11 SP2 32 and 64 bit type brokenmodules ahci brokenmodules isci Step 11 Press F6 for...

Страница 127: ...ine indicates the recommended cable routing path from the backplane to the possible controller locations An opening in the chassis divider has been provided for cable routing to the backplane Figure C 2 RAID Controller Connectors 1 Drive backplane 4 Mezzanine card mini SAS connectors 2 Cable opening in chassis divider 5 Embedded RAID mini SAS connectors on motherboard 3 RAID backup unit mounting l...

Страница 128: ...olid state drives Cisco UCS C220 large form factor LFF drives with 4 drive backplane Holds up to four 3 5 inch hard drives SFF 8 Drive Backplane Cabling The cable connections required for each type of controller are as follows Embedded RAID This option can control up to eight drives The required UCSC CABLE1 cable kit has two mini SAS cables Cable 1 controls drives 1 4 and cable 2 controls drives 5...

Страница 129: ... SAS cable 2 from connector SAS2 on the card to the drives 5 8 connectors on the backplane Step 4 Connect the mini SAS cable 2 SGPIO connector S2 to backplane connector S2 PCIe Style Card This option can control up to eight drives The required UCSC CABLE1 cable kit has two mini SAS cables Cable 1 controls drives 1 4 and cable 2 controls drives 5 8 Step 1 Connect mini SAS cable 1 from connector SAS...

Страница 130: ...PIO connector labeled S1 to backplane connector S1 Mezzanine Style Card This option can control up to four drives The required UCSC CABLE3 cable kit has two mini SAS cables Cable 1 controls drives 1 4 Step 1 Connect mini SAS cable 1 from connector SAS1 on the card to the drives 1 4 connectors on the backplane Step 2 Connect the mini SAS cable 1 SGPIO connector S1 to backplane connector S1 PCIe Sty...

Страница 131: ...us configuration are gone If this is an unexpected message then please power of your system and check your cables to ensure all disks are present Press any key to continue or C to load the configuration utility Step 6 Watch the subsequent screens for confirmation that your RAID configuration was imported correctly If you see the following message your configuration was successfully imported The LS...

Страница 132: ...rvice Guide OL 25760 01 Appendix C RAID Controller Considerations For More Information LSI SAS2 Integrated RAID Solution User Guide for LSI SAS 2008 http www cisco com en US docs unified_computing ucs 3rd party lsi irsas userguide LSI_IR_SAS_UG pdf ...

Страница 133: ... I X D Installation for Cisco UCS Integration The Cisco UCS integration instructions have been moved to the integration guides found here Cisco UCS C Series Server Integration with UCS Manager Guides Refer to the guide that is for the version of Cisco UCS Manager that you are using ...

Страница 134: ...D 2 Cisco UCS C220 Server Installation and Service Guide OL 25760 01 Appendix D Installation for Cisco UCS Integration ...

Отзывы: