2-3
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 2 Preparing Your Site for Installation
Compliance Requirements
Compliance Requirements
This section includes Safety Compliance and Network Equipment Building Systems (NEBS) standards.
The Cisco RFGW-10 UEQAM is in compliance with national and international standards as described
in
NEBS Level 3 Compliance
The Cisco RFGW-10 UEQAM is designed to meet Network Equipment Building System (NEBS) Level
3 requirements per GR-1089-CORE and GR-63-CORE.
Cautions and Regulatory Compliance Statements for NEBS
This section lists the cautions, regulatory compliance statements, and requirements for the Network
Equipment-Building System (NEBS) certification from the Telcordia Electromagnetic Compatibility
and Electrical Safety – Generic Criteria for Network Telecommunications Equipment (A Module of
LSSGR, FR-64; TSGR, FR-440; and NEBSFR, FR-2063) Telcordia Technologies Generic
Requirements, GR-1089-CORE, Issue 4, June 2006.
Caution
Wear an ESD protective wrist-strap on your wrist and attach the other end to a bare metal grounded
surface to prevent ESD.
Caution
To comply with the Telcordia GR-1089 NEBS standard for electromagnetic compatibility and safety, for
Ethernet RJ-45 ports, use only shielded Ethernet cables that are grounded on both ends. In a NEBS
installation, all Ethernet ports are limited to intrabuilding wiring.
Table 2-1
NEBS Compliance Requirements
Safety Compliance and NEBS Requirements
Specification
Description
Safety
IEC 60950-1 First 2001
EN 60950-1: 2001 +A11
CAN/CSA-C22.2 No. 60950-1-03 1st. / UL 60950-1 First.
Telcordia NEBS
GR-1089-Core Statement
Caution
To comply with the Telcordia GR-1089 NEBS standard for electromagnetic
compatibility and safety, for Ethernet RJ-45 ports, use only shielded Ethernet cables
that are grounded on both ends. In a NEBS installation, all Ethernet ports are limited
to intrabuilding wiring.
GR-1089-CORE
GR-63-CORE
Содержание RFGW-10
Страница 8: ...R E V I E W D R A F T C I S C O C O N F I D E N T I A L Contents viii Book Title OL 16264 04 ...
Страница 14: ...6 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 ...
Страница 106: ...4 4 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 Chapter 4 Thermal Management Environmental Monitoring ...