Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful network
operation, ventilation, and accessibility. The following table lists the site planning that we recommend
completing before installing a Cisco R42612 rack or PDU.
Table 2: Site Planning Checklist
Date
Time
Verified By
Activity
Task No.
Space evaluation:
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Maintenance access
1
Environmental evaluation:
• Ambient temperature
• Humidity
• Altitude
• Atmospheric
contamination
• Air flow
2
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
14
Site Preparation
Site Preparation Checklist