![Cisco ONS 15454 Скачать руководство пользователя страница 261](http://html.mh-extra.com/html/cisco/ons-15454/ons-15454_hardware-installation-manual_63823261.webp)
During the system startup or fan-tray replacement, the inventory data of the fan-tray assembly and the power
module is displayed in the
Inventory
tab of CTC after a delay of approximately 6 minutes.
Note
Procedure
Step 1
Complete the necessary task as applicable:
•
DLP-G592 Install the AC Power Module in the ONS 15454 M2 Shelf, on page 231
•
DLP-G593 Install the DC Power Module in the ONS 15454 M2 Shelf, on page 233
Step 2
Complete the
NTP-G271 Install the Power and Ground to the ONS 15454 M2 Shelf, on page 239
.
Stop. You have completed this procedure.
DLP-G592 Install the AC Power Module in the ONS 15454 M2 Shelf
This procedure installs the AC power module in the ONS 15454 M2 system.
Purpose
#2 Phillips screwdriver
Tools/Equipment
•
NTP-G266 Install the ONS 15454 M2 Shelf, on page 194
.
• Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, refer to the
Electrostatic Discharge and Grounding
Guide for Cisco CPT and Cisco ONS Platforms
.
Prerequisite Procedures
Required
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
Procedure
Step 1
Insert the AC power module in Slot A.
Cisco ONS 15454 Hardware Installation Guide
231
Installing the ONS 15454 M2 Shelf
DLP-G592 Install the AC Power Module in the ONS 15454 M2 Shelf
Содержание ONS 15454
Страница 2: ... 2019 Cisco Systems Inc All rights reserved ...
Страница 16: ...Cisco ONS 15454 Hardware Installation Guide xvi Contents ...
Страница 28: ...Cisco ONS 15454 Hardware Installation Guide xxviii Preface Preface ...
Страница 36: ...Cisco ONS 15454 Hardware Installation Guide 6 Overview Cisco ONS 15454 M6 Shelf ...
Страница 510: ...Cisco ONS 15454 Hardware Installation Guide 480 Hardware Specifications Dimensions ...