20-13
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A322 Manual or Force Switch the Node Timing Reference
DLP-A322 Manual or Force Switch the Node Timing Reference
Step 1
In node view, click the
Maintenance > Timing > Source
tabs.
Step 2
From the Reference drop-down list for the desired Clock, choose the desired reference.
Step 3
From the Operation drop-down list for the desired Clock, choose one of the following options:
•
Manual
—This operation commands the node to switch to the reference you have selected if the
SSM quality of the reference is not lower than the current timing reference.
•
Force
—This operation commands the node to switch to the reference you have selected, regardless
of the SSM quality (if the reference is valid).
For information about the Clear option, see the
“DLP-A323 Clear a Manual or Force Switch on a
Node Timing Reference” task on page 20-13
Step 4
Click
Apply
next to the timing source.
Step 5
Click
Yes
in the confirmation dialog box. If the selected timing reference is an acceptable valid
reference, the node switches to the selected timing reference.
Step 6
If the selected timing reference is invalid, a warning dialog box appears. Click
OK
; the node does not
revert to the normal timing reference.
Step 7
Return to your originating procedure (NTP).
DLP-A323 Clear a Manual or Force Switch on a Node Timing Reference
Step 1
In node view, click the
Maintenance > Timing > Source
tabs.
Purpose
This task commands the node to switch to the timing reference you have
selected A Manual switch switches the reference if the synchronization
status message (SSM) quality of the requested reference is not less than
the current reference. A Force switch switches the reference regardless
of SSM quality.
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Maintenance or higher
Purpose
This task clears a Manual or Force switch on a node timing reference and
reverts the timing reference to its provisioned reference.
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Maintenance or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...