19-37
Cisco ONS 15454 Procedure Guide, R5.0
September 2005
Chapter 19 DLPs A200 to A299
DLP-A255 Cross-Connect Card Side Switch Test
•
Hops—Enter the number of hops. The smaller the number of hops, the higher the priority.
c.
Click
OK.
Step 7
Return to your originating procedure (NTP).
DLP-A255 Cross-Connect Card Side Switch Test
Caution
Always wait 60 seconds between cross-connect card (side) switches.
Step 1
From the View menu, choose
Go to Network View
.
Step 2
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-A227 Disable Alarm Filtering” task on
as necessary.
b.
Verify that no unexplained alarms appear on the network. If unexplained alarms appear, resolve
them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting Guide
if necessary
.
Step 3
Click the
Conditions
tab. Verify that no unexplained conditions appear on the network. If unexplained
conditions appear, resolve them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting
Guide
if necessary.
Step 4
On the network map, double-click the node containing the cross-connect cards you are testing to open it
in node view.
Step 5
Click the
Maintenance > Cross-Connect
tabs.
Step 6
In the Cross-Connect Cards area, make a note of the active and standby slots.
Step 7
On the shelf graphic, verify that the active cross-connect card has a green ACT LED and the standby
cross-connect card has an amber SBY LED. If these conditions are not present, review the
Install the XCVT or XC10G Cards” task on page 17-45
or contact your next level of support.
Step 8
Click
Switch
.
Step 9
In the Confirm Switch dialog box, click
Yes
.
Step 10
Verify that the active slot noted in Step
becomes the standby slot, and that the standby slot becomes
the active slot. The switch should appear within 1 to 2 seconds.
Step 11
Verify that traffic on the test set connected to the node is still running. Some bit errors are normal, but
traffic flow should not be interrupted. If a traffic interruption occurs, do not continue. Refer to your next
level of support.
Purpose
This task verifies that the XCVT and XC10G cards can effectively switch
service (active to standby and standby to active).
Tools/Equipment
The test set specified by the acceptance test procedure, connected and
configured as specified in the acceptance test procedure.
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...