1-18
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 1 Install the Shelf and FMECs
NTP- D13 Perform the Shelf Installation Acceptance Test
Figure 1-4
ONS 15454 SDH FMEC Cover
Step 4
Attach the ground wire to the shelf.
Step 5
Attach the washer and nut.
Step 6
Attach the cover to the shelf using the screws on the top of the cover.
Stop. You have completed this procedure.
NTP-D13 Perform the Shelf Installation Acceptance Test
Step 1
Complete
by verifying that each applicable procedure was completed.
71087
FAN
FAIL
CRIT
MAJ
MIN
Pin hinge
FMEC cover
Hinge-locking
spring
Purpose
Use this procedure to perform a shelf installation acceptance test.
Tools/Equipment
Voltmeter
Oval and/or block ferrites
Prerequisite Procedures
Applicable procedures in
Chapter 1, “Install the Shelf and FMECs.”
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...