4-44
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
DLP-G84 Verify the OSC-CSM Incoming Power
DLP-G84 Verify the OSC-CSM Incoming Power
Step 1
Display the OSC-CSM card in card view.
Step 2
Click the
Provisioning > Optical Line > Parameters
tabs.
Step 3
Verify that the Power value for Port 2 is higher than the default no-power value of –30 dBm. The
calculated expected power value for Port 2 is:
Pout COM TX of OPT-PRE (this normally is + 2 dBm)
Note
Actual output power is affected by many factors. Always consider the calculated expected power
to be a general guideline and not a precise value.
Step 4
Return to your originating procedure (NTP).
DLP-G85 Verify Express Channel Connections on an OADM Node with OSCM
Cards
Step 1
If you are using a tunable laser, set the output power to a nominal value, such as –3 dBm. If not, continue
with
.
Step 2
Connect the tunable laser transmitter or the TXP_MR_2.5G card DWDM TX port to the east OPT-BST
LINE RX port.
Purpose
This task verifies the OSC-CSM card incoming power.
Tools/Equipment
None
Prerequisite Procedures
DLP-G46 Log into CTC, page 2-25
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Superuser
Purpose
This task verifies the express channel connections during an OADM node
acceptance test.
Tools/Equipment
A tunable laser or eight TXP_MR_2.5G cards covering the 32 C-band
wavelengths (see
Prerequisite Procedures
DLP-G46 Log into CTC, page 2-25
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
Superuser
Содержание ONS 15454 DWDM
Страница 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...