17-65
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
78-19416-01
Chapter 17 DLPs H100 to H199
DLP-H172 Apply a Lockout
Note
Multiple lockouts in the same protection group are not allowed.
Note
For a 1+1 optical protection group, only the protect port can be locked out.
Step 1
In node view, click the
Maintenance > Protection
tabs.
Step 2
In the Protection Groups list, click the protection group that contains the port you want to lock out.
Step 3
In the Selected Group list, click the port where you want to lock out traffic.
Step 4
In the Inhibit Switching area, click
Lock Out
.
Step 5
Click
Yes
in the confirmation dialog box.
The Lock Out has been applied and traffic is switched to the opposite port. To clear the lockout, see the
“DLP-H173 Clear a Lock-on or Lockout” task on page 17-65
.
Note
Provisioning a lockout raises a LOCKOUT-REQ or an FE-LOCKOUTOFPR condition in CTC.
Clearing the lockout switch request clears these conditions.
Step 6
Return to your originating procedure (NTP).
DLP-H173 Clear a Lock-on or Lockout
Purpose
This task switches traffic from one port to another using a lockout,
which is a switching mechanism that overrides other manual switching
connections (Force or Manual).
Tools/Equipment
None
Prerequisite Procedures
DLP-H29 Log into CTC, page 16-43
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Maintenance or higher
Purpose
This task clears a lock on or lockout.
Tools/Equipment
None
Prerequisite Procedures
DLP-H171 Apply a Lock-on, page 17-64
DLP-H172 Apply a Lockout, page 17-65
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Maintenance or higher
Содержание ONS 15310-MA SDH
Страница 20: ...Figures xx Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 ...
Страница 45: ...xlv Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 48: ...xlviii Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 290: ...15 4 Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Chapter 15 Power Down the Node ...