A P P E N D I X
E
Site Preparation and Maintenance Records
•
Site Preparation Checklist, on page 59
•
Contact and Site Information, on page 60
•
Chassis and Module Information, on page 61
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
The following table lists the site planning tasks that we recommend that you complete before you install the
switch. Your completion of each task ensures a successful switch installation.
Verification Time and Date
Planning Activity
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Physical access
Maintenance access
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Cisco Nexus 93180LC-EX NX-OS Mode Hardware Installation Guide
59
Содержание Nexus 93180LC-EX
Страница 6: ...Cisco Nexus 93180LC EX NX OS Mode Hardware Installation Guide vi Contents ...
Страница 14: ...Cisco Nexus 93180LC EX NX OS Mode Hardware Installation Guide 4 Overview Overview ...
Страница 22: ...Cisco Nexus 93180LC EX NX OS Mode Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 66: ...Cisco Nexus 93180LC EX NX OS Mode Hardware Installation Guide 56 LEDs LEDs ...