C H A P T E R
3
Prepare for Installation
Before you install the Cisco NCS 540 large density routers, you must prepare your site for installation.
Preparing your site involves these tasks:
•
General Precautions, on page 15
•
Site Planning Checklist, on page 16
•
Environmental Requirements, on page 16
•
Airflow Guidelines, on page 16
•
Recommended Airflow, on page 18
•
Site Power Guidelines, on page 18
•
Site Cabling Guidelines, on page 19
•
Interference Considerations, on page 20
•
Tools and Equipment, on page 20
•
Prepare Your Location , on page 21
•
•
Prepare Rack for Router Installation, on page 23
•
Cabinet Selection Guidelines, on page 24
•
Unpack the Cisco NCS 540 Large Density Routers, on page 25
General Precautions
Observe the following general precautions when using and working with your router:
• Keep your system components away from radiators and heat sources, and do not block cooling vents.
• Do not spill food or liquids on your system components, and never operate the product in a wet
environment.
• Do not push any objects into the openings of your system components. Doing so can cause fire or electric
shock by shorting out interior components.
• Position system cables and power supply cable carefully. Route system cables, the power supply cable,
and plug so that they are not stepped on or tripped over. Be sure that nothing else rests on your system
component cables or power cable.
• Do not modify power cables or plugs. Consult a licensed electrician or your power company for site
modifications. Always follow your local and national wiring rules.
Cisco Network Convergence System 540 Large Density Routers Hardware Installation Guide
15