Содержание NCS 2002

Страница 1: ...ation Guide First Published 2016 10 17 Last Modified 2017 04 28 Americas Headquarters Cisco Systems Inc 170 West Tasman Drive San Jose CA 95134 1706 USA http www cisco com Tel 408 526 4000 800 553 NETS 6387 Fax 408 527 0883 Text Part Number ...

Страница 2: ... 2017 Cisco Systems Inc All rights reserved ...

Страница 3: ...d Security Guidelines xxvii C H A P T E R 1 Overview 1 Compliance Standards 1 Cisco NCS 2002 Shelf 1 Cisco NCS 2006 Shelf 3 Cisco NCS 2015 Shelf 4 C H A P T E R 2 Preparing to Install the Cisco NCS 2002 NCS 2006 and NCS 2015 Shelf 9 Important Safety Recommendations 9 Required Tools and Equipment 10 Cisco Supplied Materials 10 User Supplied Materials 13 Ordering Solutions for NCS 2002 NCS 2006 and ...

Страница 4: ... A P T E R 5 Mounting the Cisco NCS 2002 Brackets 45 NTP L44 Mounting the Brackets in ANSI Configuration 45 DLP L35 Mounting the 19 inch Brackets on the NCS 2002 Shelf for ANSI Rack Configuration 46 DLP L36 Mounting the 23 inch Brackets on the NCS 2002 Shelf for ANSI Rack Configuration 47 DLP L37 Mounting the Bracket with Air Deflectors Front to Back on the NCS 2002 Shelf for ANSI Rack Configurati...

Страница 5: ...LP L51 Connecting Office Power DC to the NCS 2002 Shelf ETSI Only 88 DLP L52 Turning On and Verifying AC Office Power on the NCS 2002 Shelf 91 DLP L53 Turning On and Verifying DC Office Power on the NCS2002Shelf 92 C H A P T E R 8 Connecting and Routing the Cables and Wires 95 NTP L36 Attaching Wires to Timing LAN and Craft Pin Connections in NCS 2002 95 DLP L54 Installing Timing Wires in Cisco NC...

Страница 6: ...ilure 132 NTP L35 Installing the Fan Tray Assembly in the NCS 2002 Shelf 132 Air Filter 135 C H A P T E R 1 1 NCS 2006 Installation Overview 137 NCS 2006 Installation Overview 137 C H A P T E R 1 2 Installing the Air Flow Regulator 139 Air Deflector 139 Air Plenum 140 Air Plenum Rack and Cabinet Compatibility 143 NTP L43 Install the Air Plenum in NCS 2006 Shelf 144 DLP L64 Installing Air Plenum fo...

Страница 7: ...006 Shelf for ETSI Rack Configuration 182 C H A P T E R 1 4 Mounting the Cisco NCS 2006 Shelf 185 ANSI Rack Installation 185 Mounting a Single Shelf 186 Mounting Multiple Nodes 187 ETSI Rack Installation 187 Mounting a Single Node 189 NTP L3 Mounting the NCS 2006 Shelf 189 DLP L9 Mounting the NCS 2006 Shelf on a Rack One Person 191 DLP L10 Mounting the NCS 2006 Shelf on a Rack Two People 193 DLP L...

Страница 8: ...N Wires in NCS 2006 240 C H A P T E R 1 7 NCS 2006 Shelf Installation Acceptance Test 243 NTP L18 Performing NCS 2006 Shelf Installation Acceptance Test 243 C H A P T E R 1 8 Installing the Cisco NCS 2006 Door and Other Modules 245 Front Door 245 NTP L4 Installing the Standard Door of the NCS 2006 Shelf 247 NTP L5 Opening and Removing the Standard Door of the NCS 2006 Shelf 252 DLP L12 Opening the...

Страница 9: ... LCD Unit 292 NTP L10 Installing the LCD Module in the NCS 2006 Shelf 292 Fan Tray Assembly 295 Fan Speed 296 Fan Failure 296 NTP L11 Installing the Fan Tray Assembly in the NCS 2006 Shelf 296 Air Filter 298 C H A P T E R 1 9 NCS 2015 Installation Overview 299 NCS 2015 Installation Overview 299 C H A P T E R 2 0 Mounting the Brackets on the NCS 2015 Shelf 301 NTP L48 Mounting Brackets on NCS 2015 ...

Страница 10: ...the Cables 347 Cable Routing and Management 347 Default Module 347 Fiber Module 347 Cable and Fiber Routing 348 NTP L55 Routing and Locking Cable and Fiber Modules 348 NTP L56 Attaching Wires to Alarm Timing LAN and Craft Pin Connections 350 DLP L76 Installing Alarm Wires in NCS 2015 350 DLP L77 Installing Timing Wires on NCS 2015 352 DLP L78 Installing LAN Wires in NCS 2015 356 C H A P T E R 2 4 ...

Страница 11: ... TNCS O Card 399 DLP L62 Installing the TNC TNCE TSC TSCE TNCS or TNCS O Card 400 DLP L63 Provisioning PPM and Port for the TNC TNCE and TNCS Cards 404 DLP L64 Configuring UDC and VoIP for the TNC TNCE TNCS and TNCS O Cards 405 Filler and Blank Cards 406 C H A P T E R 2 7 Multishelf Management 407 NTP L15 Connecting the NCS 2006 Multishelf Node and the NCS 2006 Subtending Shelves 407 NTP G318 Conn...

Страница 12: ...54 NCS 2006 and NCS 2015 SSCs Can Be Connected To the NCS 2015 NC Through RJ 45 Ports 426 Cisco NCS 2006 Node Controller and ONS 15454 NCS 2006 and NCS 2015 Subtending Shelves 427 Scenario 1 Using RJ 45 and SFP MSM M and MSM P Ports ONS 15454 NCS 2006 and NCS 2015 SSCs Can Be Connected To the NCS 2006 NC 427 Scenario 2 Using Cisco Catalyst Switch 3650 ONS 15454 NCS 2006 and NCS 2015 SSCs Can Be Co...

Страница 13: ... the Air Filter of the NCS 2002 Shelf Assembly 441 NTP L20 Replacing the Air Filter of the NCS 2006 Shelf Assembly 444 NTP L21 Replacing the Air Filter of the AC Power Module in the NCS 2006 Shelf Assembly 447 NTP L58 Replacing the Air Filter of the NCS 2015 Shelf Assembly 448 NTP L22 Cleaning Fiber Connectors 452 DLP G261 Cleaning Multi Fiber Optic Cable Connectors 452 DLP G262 Cleaning Fiber Con...

Страница 14: ...Remote Inventory 468 BITS Interface 468 System Timing 469 System Power 469 AC Power Specifications 469 DC Power Specifications 470 Power Supply Modules Supported by NCS 2006 ECU S 471 Power Calculation 471 Fan Tray 472 System Environmental Specifications 472 Dimensions 472 NCS 2015 Shelf Specifications 473 Bandwidth 473 Cisco Transport Controller 473 External LAN Interface for EMS 473 TL1 Craft In...

Страница 15: ...System Timing 474 System Power 475 Power Calculation 476 Fan Tray 476 System Environmental Specifications 476 Dimensions 477 Cisco NCS 2000 Series Hardware Installation Guide xv Contents ...

Страница 16: ...Cisco NCS 2000 Series Hardware Installation Guide xvi Contents ...

Страница 17: ...te This section explains the objectives intended audience and organization of this publication and describes the conventions that convey instructions and other information The sections are Revision History page xvii Document Objectives page xviii Audience page xviii Document Organization page xviii Related Documentation page xx Document Conventions page xxi Obtaining Optical Networking Information...

Страница 18: ...se of this publication November 2013 Document Objectives This document explains installation turn up provisioning and maintenance for Cisco NCS 2002 and Cisco NCS 2006 and Cisco NCS 2015 systems Use this document in conjunction with the appropriate publications listed in the Related Documentation on page xx section Audience To use this publication you should be familiar with Cisco or equivalent op...

Страница 19: ...the Cisco NCS 2002 Door and Other Modules on page 107 Provides an overview of the steps involved to install the NCS 2006 NCS 2006 Installation Overview on page 137 Explains how to mount the Cisco NCS 2006 brackets Mounting the Brackets on NCS 2006 Shelf on page 163 Explains how to mount the Cisco NCS 2006 shelf Mounting the Cisco NCS 2006 Shelf on page 185 Explains how to connect the power and gro...

Страница 20: ...he NCS 2002 NCS 2006 and NCS 2015 shelf installations Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves on page 441 Provides hardware specifications of the NCS ANSI and ETSI NCS 2002 NCS 2006 and NCS 2015 shelves Hardware Specifications on page 463 Related Documentation Use the Cisco NCS 2000 Series Hardware Installation Guide in conjunction with the following referenced publications Cisco NC...

Страница 21: ...ut spaces after a syntax element indicates that the element can be repeated A vertical line called a pipe indicates a choice within a set of keywords or arguments Optional alternative keywords are grouped in brackets and separated by vertical bars x y Required alternative keywords are grouped in braces and separated by vertical bars x y Nested set of square brackets or braces indicate optional or ...

Страница 22: ...ny equipment be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device Statement 1071 SAVE THESE INSTRUCTIONS Warning BELANGRIJKE VEILIGHEIDSINSTRUCTIES Dit waarschuwingssymbool beteke...

Страница 23: ...itué à la fin de chaque avertissement CONSERVEZ CES INFORMATIONS Attention WICHTIGE SICHERHEITSHINWEISE Dieses Warnsymbol bedeutet Gefahr Sie befinden sich in einer Situation die zu Verletzungen führen kann Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer Schaltungen und den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut Suchen Sie mit der am Ende jeder Warnung ang...

Страница 24: ...sos de segurança traduzidos que acompanham este dispositivo GUARDE ESTAS INSTRUÇÕES Aviso INSTRUCCIONES IMPORTANTES DE SEGURIDAD Este símbolo de aviso indica peligro Existe riesgo para su integridad física Antes de manipular cualquier equipo considere los riesgos de la corriente eléctrica y familiarícese con los procedimientos estándar de prevención de accidentes Al final de cada advertencia encon...

Страница 25: ...nça traduzidos que acompanham o dispositivo GUARDE ESTAS INSTRUÇÕES Aviso VIGTIGE SIKKERHEDSANVISNINGER Dette advarselssymbol betyder fare Du befinder dig i en situation med risiko for legemesbeskadigelse Før du begynder arbejde på udstyr skal du være opmærksom på de involverede risici der er ved elektriske kredsløb og du skal sætte dig ind i standardprocedurer til undgåelse af ulykker Brug erklær...

Страница 26: ...Cisco NCS 2000 Series Hardware Installation Guide xxvi Preface Document Conventions ...

Страница 27: ...so includes translations of the safety warnings that appear in the Cisco NCS system documentation Obtaining Documentation Obtaining Support and Security Guidelines For information on obtaining documentation submitting a service request and gathering additional information see the monthly What s New in Cisco Product Documentation which also lists all new and revised Cisco technical documentation at...

Страница 28: ...Cisco NCS 2000 Series Hardware Installation Guide xxviii Preface Obtaining Documentation Obtaining Support and Security Guidelines ...

Страница 29: ...trical Code Part I CSA C22 1 Other countries If local and national electrical codes are not available refer to IEC 364 Part 1 through Part 7 Cisco NCS 2002 Shelf The NCS 2002 is designed to comply with Telcordia GR 1089 CORE Issue 5 The NCS 2002 provides only Type 2 and Type 4 interfaces A single NCS 2002 shelf supports both ANSI and ETSI standards The NCS 2002 is Federal Information Processing St...

Страница 30: ...co NCS 2002 shelf the standard door and the deep front panel The front door provides access to the shelf and acts as a protective panel The deep front panel provides additional space in front of the shelf to accommodate cables that do not fit inside the standard door It also provides more space for fiber bend radius and to manage the line card connections The deep door does not have a hinge and ca...

Страница 31: ...page 463 Cisco NCS 2006 Shelf The NCS 2006 is designed to comply with Telcordia GR 1089 CORE Issue 5 The NCS 2006 provides only Type 2 and Type 4 interfaces A single NCS 2006 shelf supports both ANSI and ETSI standards The NCS 2006 is FIPS 140 2 and CC compliant The NCS 2006 shelf has 8 horizontal card slots numbered 1 to 8 While Slot 2 to Slot 7 house MSTP cards that provide 10 to 100 Gbps interc...

Страница 32: ... rack the Cisco NCS 2006 shelf is typically connected to a fuse and alarm panel to provide centralized alarm connection points and distributed power for the NCS 2006 Fuse and alarm panels are third party equipment and are not described in this documentation If you are unsure about the requirements or specifications for a fuse and alarm panel consult the user documentation for the related equipment...

Страница 33: ... of the NCS 2015 DC Chassis Alarm dry contacts and BITS in the power input panel 2 Power modules 1 Fan tray assembly with LCD panel 4 DC termination blocks 3 TNCS TNCS O cards in slots 1 and 17 6 External connection unit ECU 5 Air inlet 8 Line cards 7 Cisco NCS 2000 Series Hardware Installation Guide 5 Overview Cisco NCS 2015 Shelf ...

Страница 34: ...C Chassis Alarm dry contacts and BITS in the power input panel 2 Power modules 1 Fan tray assembly with LCD panel 4 AC cable connectors 3 TNCS TNCS O cards in slots 1 and 17 6 External connection unit ECU 5 Air inlet 8 Line cards 7 Cisco NCS 2000 Series Hardware Installation Guide 6 Overview Cisco NCS 2015 Shelf ...

Страница 35: ...ttom of the chassis and expelled at the top rear as seen in the following figure Figure 5 Airflow Direction in the NCS 2015 DC Chassis The NCS 2015 is mounted on a 19 inch or 23 inch ANSI rack 482 6 or 584 2 mm or on a 600 x 300 mm 23 6 x 11 8 inch ETSI standard equipment rack The rack is mounted using mounting brackets When installed in an equipment rack the Cisco NCS 2015 shelf is typically conn...

Страница 36: ...d equipment The empty shelf weighs approximately 69 225 pounds 31 4 kg Install and operate the NCS 2015 only in environments that do not expose wiring or cabling to the outside plant Note For information on hardware and software specifications for the NCS shelf see the NCS 2015 Shelf Specifications on page 473 Cisco NCS 2000 Series Hardware Installation Guide 8 Overview Cisco NCS 2015 Shelf ...

Страница 37: ...zards involved with electrical circuitry and be familiar with standard practices for preventing accidents To see translations of the warnings that appear in this publication refer to the Regulatory Compliance and Safety Information document for the appropriate Cisco chassis Statement 274 Warning Installation of the equipment must comply with local and national electrical codes Statement 1074 Warni...

Страница 38: ...both ANSI and ETSI environments Note The NCS 2006 is suitable for installation in network telecommunication facilities where the National Electric Code NEC applies Note Required Tools and Equipment The following sections describe the tools and equipment you need to install and test the NCS 2002 NCS 2006 or NCS 2015 shelves Cisco Supplied Materials The following table lists the materials that are r...

Страница 39: ... AWG multistrand copper wire 1 Double hole grounding lug for ground connection with a wire receptacle to accommodate the recommended 13 3 mm 6 AWG multistrand copper wire angled at 45 degree 1 Double hole grounding lug for ground connection with a wire receptacle to accommodate the recommended 13 3 mm 6 AWG multistrand copper wire 1 Double hole grounding lug for ground connection with a wire recep...

Страница 40: ...ad Phillips screws 10 ANSI 12 24 x 0 50 pan head Phillips screws 8 ETSI M6 0 x 20 pan head Phillips screws 8 ANSI 12 24 x 0 50 pan head Phillips screws 8 ETSI M6 0 x 20 pan head Phillips screws 8 Mounting bracket screws M3 x 10 mm screws 10 M3 x 8 mm screw 1 and safety washer 1 Deep door bracket screws and washer M6 0 x 16mm pan head Phillips screws 2 M6 lock washers 2 Screws and lock washers for ...

Страница 41: ...nt are required but are not supplied with the NCS 2002 NCS 2006 and NCS 2015 Table 2 User Supplied Materials NCS 2015 NCS 2006 NCS 2002 User Supplied Material Bit error rate BER tester BNC insertion tool 1 4 socket wrench sockets and a torque wrench 1 4 socket wrench sockets and a torque wrench 1 4 socket wrench sockets and a torque wrench Chassis grounding connecting power Cisco NCS 2000 Series H...

Страница 42: ...opper conductors 194 degrees Fahrenheit 90 degrees Celsius Ground cable 6 AWG stranded Alarm cable pairs for all alarm connections 22 or 24 AWG 0 51 mm or 0 64 mm solid tinned 100 ohm shielded building integrated timing supply BITS clock cable pair 22 or 24 AWG 0 51 mm or 0 64 mm twisted pair T1 type ETSI Copper ground cable 13 3 mm 6 AWG stranded specified for up to 90 degrees Celsius 194 degrees...

Страница 43: ...dth 22 inches 558 8 mm 23 inch ANSI Standard Telcordia GR 63 CORE 584 2 mm rack total width 26 inches 660 4 mm ETSI Equipment rack ETSI rack 2200 mm 86 6 inch H x 600 mm 23 6 inch Wx 300 mm 11 8 inch D ANSI 19 inch ANSI Standard Telcordia GR 63 CORE 482 6 mm rack total width 22 inches 558 8 mm 23 inch ANSI Standard Telcordia GR 63 CORE 584 2 mm rack total width 26 inches 660 4 mm ETSI Equipment ra...

Страница 44: ... 2006 shelf are offered Select one of these solutions Shelf assembly that is preinstalled with all the ancillary units such as fan tray assembly LCD unit power module and NCS 2006 ECU Shelf assembly that is not preinstalled with the ancillary units but can be ordered separately One ordering solution for the Cisco NCS 2015 shelf is offered Shelf assembly that is not preinstalled with the ancillary ...

Страница 45: ... with high speed back plane connectors Orange Hollow Circle Slots 2 and 3 New Uplink card Pink Pentagon NCS 2006 The NCS 2006 shelf assemblies have eight card slots numbered sequentially from bottom to top Slots 1 and 8 are reserved for control cards TNC TNCE TSC or TSCE Slots 2 3 4 5 6 and 7 are dedicated for common line cards The NCS 2006 system can work with a single control card TNC TNCE TSC o...

Страница 46: ...card Pink Pentagon When the NCS 2006 shelf is powered at 60 VDC nominal only TNC OPT AMP C OPT AMP 17 C OPT EDFA 17 OPT EDFA 24 and NCS 2006 ECU can be installed Note NCS 2015 The NCS 2015 shelf assemblies have 18 card slots numbered sequentially from left to right Slots 1 and 17 are reserved for control cards TNCS or TNCS O Slots 2 through 16 are dedicated for common line cards and slot 18 is res...

Страница 47: ... Slot 18 ECU slot Green Pentagon Card Replacement To replace a card with another card of the same type you do not need to make any changes to the database remove the old card and replace it with a new card To replace a card with a card of a different type physically remove the card and replace it with the new card then delete the original card from CTC For specifics refer to the Maintain the Node ...

Страница 48: ...d As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Complete the DLP L62 Unpacking and Verifying the Shelf on page 20 Step 2 Complete the DLP L63 Inspecting the Shelf on page 22 Stop You have completed this procedure DLP L62 Unpacking and Verifying the Shelf This task removes the shelves from the package Purpose None Tools Equipment None Prerequisite Procedures Required Required ...

Страница 49: ...ic and a smaller box of items needed for installation Step 3 To remove the shelf grasp both rings of the shelf removal strap and slowly lift the shelf out of the box The NCS 2015 chassis has lifting handles at either side for this purpose see figure below Figure 9 Handling the NCS 2015 DC Chassis During Installation Cisco NCS 2000 Series Hardware Installation Guide 21 Preparing to Install the Cisc...

Страница 50: ...lf on page 20 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Cisco NCS 2002 and NCS 2006 Open the shelf removing temporary door or standard door For more information see the DLP L46 Removing the Standard Door of the NCS 2002 Shelf on page 113 and DLP L13 Removing the Standard Door of the NCS 2006 Shelf on page 255 Step 2 Verify the fol...

Страница 51: ...e 23 Cisco NCS 2002 Installation Overview This chapter includes these sections Mounting the brackets Mounting the shelf Installing the door and other modules Connecting the power and ground Connecting and routing the cables Installing and configuring the control card Performing the shelf acceptance test Cisco NCS 2000 Series Hardware Installation Guide 23 ...

Страница 52: ...Cisco NCS 2000 Series Hardware Installation Guide 24 Cisco NCS 2002 Installation Overview Cisco NCS 2002 Installation Overview ...

Страница 53: ... Air Plenum page 26 Air Plenum Rack and Cabinet Compatibility page 27 NTP L42 Install the Air Plenum in NCS 2002 Shelf page 28 Air Deflector An air deflector is a sheet metal part that is mounted on the NCS 2002 shelf to orient the air flow in a specific direction The air deflectors can be mounted in different positions to control the air flow Front to Front Only ETSI rack Front to Back For ANSI a...

Страница 54: ...from the front top inlet are channelized to the right vertical plenum inside the equipment and then to the exhaust air channel towards the left vertical air plenum The air flow is deflected by 90 degrees and exited out in the rear end The following figure shows the air flow inside the air plenum Figure 10 Air flow within the air plenum Cisco NCS 2000 Series Hardware Installation Guide 26 Installin...

Страница 55: ...abinet Compatibility The table shows the compatibility of air plenum with the ANSI and ETSI racks and cabinets The chassis can be installed with brackets in front position only Table 6 Air plenum compatibility with racks and cabinets Front to back air flow Rack Cabinet Supported 1 ANSI 19 inch rack Supported 1 ANSI 19 inch cabinet Cisco NCS 2000 Series Hardware Installation Guide 27 Installing the...

Страница 56: ...mpatible with air plenum installation is available from Telect with part number 12545 301 Note Figure 13 Minimum rear opening for ANSI 19 inch and ETSI configuration NTP L42 Install the Air Plenum in NCS 2002 Shelf This procedure installs the air plenum to orient the air flow in front to back direction in the NCS 2002 shelf Purpose Cisco NCS 2000 Series Hardware Installation Guide 28 Installing th...

Страница 57: ...uit Statement 1074 Warning Before working on a chassis or working near power supplies unplug the power cord on AC units Statement 246 Warning This equipment is intended to be grounded Ensure that the host is connected to earth ground during normal use Statement 39 Warning For nominal voltage of 60 VDC the input voltage range is from 40 to 72 VDC Note Use only the fastening hardware provided with t...

Страница 58: ...m in NCS 2002 Shelf for ANSI 23 inch Configuration on page 33 DLP L70 Installing Air Plenum for NCS 2002 Shelf in ETSI Configuration on page 40 DLP L71 Installing Pre assembled Air Plenums in ANSI 23 inch Configuration on page 38 Stop You have completed this procedure DLP L65InstallingAirPlenumforNCS2002ShelfinANSI19 inchConfiguration This task installs the air plenum for the NCS 2002 shelf in ANS...

Страница 59: ...e value of 11 5 in lb 1 3 N m Figure 14 Installing the horizontal air plenum in the ANSI 19 inch configuration Step 3 Install the vertical air plenum to the left of the horizontal air plenum a Insert the vertical plenum in the free space between the horizontal plenum and cabinet b Install t he wing head screws fom the internal side of the horizontal plenum as shown in the following figure Cisco NC...

Страница 60: ...p 4 Install the vertical air plenum to the right of the horizontal air plenum Follow step 3a to 3c Figure 16 Installing the right vertical air plenum Cisco NCS 2000 Series Hardware Installation Guide 32 Installing the Air Flow Regulator DLP L65 Installing Air Plenum for NCS 2002 Shelf in ANSI 19 inch Configuration ...

Страница 61: ...Figure 17 Installing the NCS 2002 chassis below the horizontal air plenum Step 7 Return to your originating procedure NTP DLP L69InstallingAirPlenuminNCS2002ShelfforANSI23 inchConfiguration This task installs the air plenum for the NCS 2002 shelf in the ANSI 23 inch cabinet or rack configuration Purpose Cisco NCS 2000 Series Hardware Installation Guide 33 Installing the Air Flow Regulator DLP L69 ...

Страница 62: ...needed Required As Needed Onsite Onsite Remote None Security Level The air plenums for ANSI 23 inch configuration can also be pre assembled outside the cabinet and then installed inside the cabinet See DLP L71 Installing Pre assembled Air Plenums in ANSI 23 inch Configuration on page 38 Note Cisco NCS 2000 Series Hardware Installation Guide 34 Installing the Air Flow Regulator DLP L69 Installing A...

Страница 63: ... plates to the shelf Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 18 Installing the adapter plates on the horizontal air plenum Cisco NCS 2000 Series Hardware Installation Guide 35 Installing the Air Flow Regulator DLP L69 Installing Air Plenum in NCS 2002 Shelf for ANSI 23 inch Configuration ...

Страница 64: ...to the left of the horizontal air plenum a Insert the vertical air plenum in the free space between the horizontal air plenum and cabinet b Install the wing head screws from the internal side of the horizontal plenum as shown in the following figure c Tighten the screws to a torque value of 11 5 in lb 1 3 N m Figure 20 Installing the left vertical air plenum Cisco NCS 2000 Series Hardware Installa...

Страница 65: ... front position See DLP L35 Mounting the 19 inch Brackets on the NCS 2002 Shelf for ANSI Rack Configuration on page 46 Step 8 Install the NCS 2002 empty chassis below the horizontal plenum Figure 22 Installing the NCS 2002 chassis below the horizontal air plenum Cisco NCS 2000 Series Hardware Installation Guide 37 Installing the Air Flow Regulator DLP L69 Installing Air Plenum in NCS 2002 Shelf fo...

Страница 66: ...screwdriver Medium slot head screwdriver Small slot head screwdriver Screws 12 24 x 3 4 pan head Phillips mounting screws 8 Wing head screws 4 Adapter plates One air plenum kit horizontal and vertical air plenum Tools Equipment As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 38 Installing the Air Flow Regulator DLP L71 Install...

Страница 67: ...ight of the horizontal plenum Step 4 Install the wing head screws from the internal side of the horizontal plenum and tighten the screws to a torque value of 11 5 in lb 1 3 N m Step 5 Install the vertical air plenum to the left of the horizontal air plenum Follow step 4 Figure 23 Pre assembling the air plenums Cisco NCS 2000 Series Hardware Installation Guide 39 Installing the Air Flow Regulator D...

Страница 68: ... the air plenum for the NCS 2002 shelf in the ETSI configuration Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Screws M6 0 x 20 pan head Phillips screws 4 Wing head screws 4 Adapter plates One air plenum kit horizontal and vertical air plenum Tools Equipment As needed Required As Needed Onsite Onsite Remote Cisco NCS 2000 Series Hardware Insta...

Страница 69: ...horizontal air plenum Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m as shown in the following figure Figure 25 Installing the adapter plates on the horizontal air plenum Cisco NCS 2000 Series Hardware Installation Guide 41 Installing the Air Flow Regulator DLP L70 Installing Air Plenum for NCS 2002 Shelf in ETSI Configuration ...

Страница 70: ...e left of the horizontal air plenum a Insert the vertical plenum in the free space between the horizontal plenum and cabinet b Install the wing head screws from the internal side of the horizontal plenum as shown in the following figure c Tighten the screws to a torque value of 11 5 in lb 1 3 N m Figure 27 Installing the left vertical air plenum Cisco NCS 2000 Series Hardware Installation Guide 42...

Страница 71: ...See DLP L35 Mounting the 19 inch Brackets on the NCS 2002 Shelf for ANSI Rack Configuration on page 46 Step 8 Install the NCS 2002 empty chassis below the horizontal plenum Figure 29 Installing the NCS 2002 chassis below the horizontal air plenum Step 9 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 43 Installing the Air Flow Regulator DLP L70 Installing...

Страница 72: ...Cisco NCS 2000 Series Hardware Installation Guide 44 Installing the Air Flow Regulator DLP L70 Installing Air Plenum for NCS 2002 Shelf in ETSI Configuration ...

Страница 73: ... inch mounting brackets to the NCS 2002 shelf for ANSI rack configuration Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Tools Equipment NTP L41 Unpacking and Inspecting the Shelf on page 20 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Perform these procedures as required DLP L35 Mounting the 19 ...

Страница 74: ... Shelf on page 20 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Use only the fastening hardware provided with the NCS 2002 to prevent loosening deterioration and electromechanical corrosion of the hardware and joined material Caution When mounting the NCS 2002 in a frame with a nonconductive coating such as paint lacquer or enamel either use the thre...

Страница 75: ...the NCS 2002 shelf for a 19 inch 482 6 mm ANSI Configuration Step 5 Return to your originating procedure NTP DLP L36 Mounting the 23 inch Brackets on the NCS 2002 Shelf for ANSI Rack Configuration This task installs the 23 inch mounting brackets on the NCS 2002 shelf for ANSI rack configuration Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Too...

Страница 76: ...h a nonconductive coating such as paint lacquer or enamel either use the thread forming screws provided with the NCS 2002 ship kit or remove the coating from the threads to ensure electrical continuity Caution The mounting brackets can be installed in the front or the middle position of the chassis Note Cisco NCS 2000 Series Hardware Installation Guide 48 Mounting the Cisco NCS 2002 Brackets DLP L...

Страница 77: ...ont to back on the NCS 2002 shelf for ANSI rack configuration In an ANSI rack the air deflectors can be mounted only in the 23 inch rack configuration and in the front position of the chassis Note Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Tools Equipment NTP L41 Unpacking and Inspecting the Shelf on page 20 Prerequisite Procedures As neede...

Страница 78: ... NCS 2002 shelf Note Step 5 Align the screw holes on the left back air deflector with the screw holes on the chassis Step 6 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m See Diagram 2 of the following figure Step 7 Place the air deflector covers on the front and rear ends of the chassis as shown in Diagram 3 of the following figure Step 8 Align the screw holes on the a...

Страница 79: ...gure against the left side of the chassis Step 14 Align the screw holes on the 23 inch mounting bracket with the screw holes on the left side of the chassis Step 15 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 32 Mounting the Brackets on the NCS 2002 Shelf for ANSI Rack Configuration Step 16 Return to your originating procedure NTP NTP L45 Mounting the Brackets...

Страница 80: ...completed this procedure DLP L38 Mounting the Brackets on the NCS 2002 Shelf for ETSI Rack Configuration This task installs the mounting brackets on the NCS 2002 shelf for ETSI rack configuration In an ETSI rack the air deflectors can be mounted only in the front position of the chassis Note Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Tools ...

Страница 81: ...dure Step 1 Place the mounting bracket flush against the shelf as shown in the figure below Step 2 Align the mounting bracket screw holes against the shelf screw holes Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 4 Repeat steps 1 through 3 for the mounting bracket on the opposite side Figure 33 Mounting the Brackets on the NCS 2002 Shelf for ETSI Rack Conf...

Страница 82: ...of the chassis Note Procedure Step 1 Place the right front air deflector flush against the right side of the chassis as shown in Diagram 1 of the figure below Step 2 Align the screw holes on the right front air deflector with the screw holes on right side of the chassis Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m See Diagram 1 of the figure below Step 4 Place ...

Страница 83: ...tighten them to a torque value of 11 5 in lb 1 3 N m Step 13 Place the other mounting bracket flush in the front position see Diagram 3 of the figure below against the left side of the chassis Step 14 Align the screw holes on the mounting bracket with the screw holes on the left side of the chassis Step 15 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 34 Mountin...

Страница 84: ...s as shown in Diagram 1 of the following figure Step 2 Align the screw holes on the right front air deflector with the screw holes on right side of the chassis Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m See Diagram 2 of the following figure Step 4 Place the left back air deflector flush against the chassis as shown in Diagram 1 of the following figure If the ...

Страница 85: ...owing figure Step 8 Align the screw holes on the air deflector covers with the screw holes on the chassis Step 9 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m See Diagram 4 of the following figure Figure 35 Mounting the Air Deflectors Front to Back on the NCS 2002 Shelf for ETSI Rack Configuration Cisco NCS 2000 Series Hardware Installation Guide 57 Mounting the Cisco ...

Страница 86: ... mounting bracket with the screw holes on the left side of the chassis Step 15 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 36 Mounting the Brackets with Air Deflectors Front to Back on the NCS 2002 Shelf for ETSI Rack Configuration Step 16 Return to your originating procedure NTP DLP L41 Mounting the Bracket with Air Deflectors Front to Top on the NCS 2002 She...

Страница 87: ... mounting bracket flush against the left side of the chassis see Diagram 2 of the following figure Step 7 Align the screw holes on the mounting bracket with the screw holes on the left side of the chassis Step 8 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 9 Place the mounting bracket flush against the right side of the chassis see Diagram 2 of the following figu...

Страница 88: ... of the following figure Figure 37 Mounting the Bracket with Air Deflectors Front to Top on the NCS 2002 Shelf for ETSI Rack Configuration Step 15 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 60 Mounting the Cisco NCS 2002 Brackets DLP L41 Mounting the Bracket with Air Deflectors Front to Top on the NCS 2002 Shelf for ETSI Rack Configuration ...

Страница 89: ...front position then it projects 1 7 inches 43 18 mm from the front of the rack If the shelf is mounted in the middle position then it projects 5 1 inches 129 54 mm from the front of the rack The shelf mounts in both Electronic Industries Alliance EIA standard and Telcordia standard racks The shelf is a total of 17 2 inches 431 8 mm wide with no mounting ears attached Ring runs are not provided by ...

Страница 90: ...n ANSI rack the brackets can be mounted in the front or middle position The shelf should be empty for easier lifting The NCS 2002 shelves can be mounted above each other without any space between the shelves This method of mounting does not restrict the air flow because the air vents are on either sides of the NCS 2002 shelves ETSI Rack Installation The NCS 2002 shelf is mounted on a 600 x 600 mm ...

Страница 91: ...s 88 9 mm 3 5 inches high 535 mm 21 06 inches wide and 304 8 mm 11 1 inches deep When mounting a shelf in a partially filled rack load the rack from the bottom to the top with the heaviest component at the bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Caution Cisco NCS 2000 Series Hardware Installation ...

Страница 92: ...k space To ensure the mounting is secure use two to three 2006 mounting screws for each side of the shelf In an ETSI rack the brackets can be mounted only in the front position The NCS 2002 shelves can be mounted above each other without any space between the shelves This method of mounting does not restrict the air flow because the air vents are on either sides of the NCS 2002 shelves Cisco NCS 2...

Страница 93: ...rewdriver Small slot head screwdriver ETSI only Two M6 x 20 pan head Phillips mounting screws ANSI only Two 12 24 x 3 4 pan head Phillips mounting screws Tools Equipment DLP L62 Unpacking and Verifying the Shelf on page 20 DLP L63 Inspecting the Shelf on page 22 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Stability hazard The rack stabilizing mechan...

Страница 94: ...area that exceeds the maximum recommended ambient temperature of 131 F 55 C Statement 1047 Warning Take care when connecting units to the supply circuit so that wiring is not overloaded Statement 1018 Warning To prevent bodily injury when mounting or servicing this unit in a rack you must take special precautions to ensure that the system remains stable The following guidelines are provided to ens...

Страница 95: ...d For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Step 4 Continue with NTP L30 Opening and Removing the Standard Door of the NCS 2002 Shelf on page 111 Stop You have completed this procedure DLP L42 Mounting the NCS 2002 Shelf on a Rack One Person This task allows one person to mount the shelf on a rack Purpo...

Страница 96: ...fuse rating must not exceed 15A For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes Step 2 Ensure that the shelf is mounted on the appropriate rack equipment 23 inches 584 2 mm or 19 inches 482 6 mm for ANSI rack...

Страница 97: ...ckets with the mounting holes in the rack Step 6 Using the Phillips Dynamometric screwdriver install one mounting screw in each side of the assembly Tighten the screw to a torque value of 22 in lb 2 5 N m Step 7 When the shelf is secured to the rack install the remaining two mounting screws on either sides of the shelf Step 8 Return to your originating procedure NTP DLP L43 Mounting the NCS 2002 S...

Страница 98: ...in an overall weight of at least 20 kg 44 lb Note Procedure Step 1 Verify that the proper fuse panel has been installed in the top mounting space If a fuse panel is not present you must install one according to manufacturer instructions For a DC power supply the fuse rating must not exceed 15A For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circui...

Страница 99: ... on the wall Step 3 Align the mounting bracket screw holes against the shelf screw holes see diagram 1 of the figure below Step 4 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m See diagram 2 of the figure below Figure 41 Wall Mounting of the NCS 2002 Shelf Cisco NCS 2000 Series Hardware Installation Guide 71 Mounting the Cisco NCS 2002 Shelf DLP L43 Mounting the NCS 200...

Страница 100: ...m 2 of the figure below Figure 42 Mounting the Fire Protective Cove Step 7 Return to your originating procedure NTP DLP L44 Mounting the NCS 2002 Shelf on the Desktop This task explains mount the shelf on the desktop Purpose None Tools Equipment None Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 72 Mo...

Страница 101: ...in the accessory tool kit Step 3 Place the NCS 2002 shelf upside down on a smooth flat surface To ensure proper cooling of the NCS 2002 shelf make sure that the space in front of the air flow vents are free of cables fibers and mechanical fixtures for fiber and cable management Note Step 4 Peel off the rubber bumpers from the adhesive strip and place it adhesive side down onto all the four corners...

Страница 102: ...Cisco NCS 2000 Series Hardware Installation Guide 74 Mounting the Cisco NCS 2002 Shelf DLP L44 Mounting the NCS 2002 Shelf on the Desktop ...

Страница 103: ...cal and national electrical codes The voltage rating value for AC power ranges between 100 VAC to 240 VAC depending on the standards in various countries This product is intended for use on the TN and TT power systems The NCS 2002 has redundant 48 VDC 12 single hole lug power terminals The terminals are labeled RET A RET B 48V A and 48V B on the power module To install redundant DC power feeds use...

Страница 104: ...upply the fuse rating must not exceed 15A The voltages 40 5 VDC and 57 6 VDC are respectively the minimum and maximum voltages required to power the chassis The nominal steady state voltage is 48 VDC For AC power feed use the power cable shipped with the NCS 2002 and one ground cable For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protecti...

Страница 105: ...rapper ETSI only Power cable from fuse panel to power modules shipped with the NCS 2002 ETSI Two hole grounding lug shipped with the NCS 2002 ETSI Tools Equipment Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite...

Страница 106: ...tact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available Statement 1024 Warning Never install an AC power module and a DC power module in the same chassis Statement 1050 Warning When stranded wiring is required use approved wiring terminations such as closed loop or spade type with upturned lugs These terminations should be th...

Страница 107: ...es Caution Procedure Step 1 Verify that the correct fuse panel is installed in the top mounting space For a DC power supply the fuse rating must not exceed 15A For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes ...

Страница 108: ...the table below Tools Equipment Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series NTP L30 Opening and Removing the Standard Door of the NCS 2002 Shelf on page 111 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level This product is...

Страница 109: ...omply with national and local codes Caution Not more than 7 feet 2 m of the power supply cable should be exposed between the equipment and the fiber storage tray Note When terminating the frame ground do not use soldering lug connectors screwless push in connectors quick connect connectors or other friction fit connectors Caution If the system loses power or if both TNC TNCE TSC or TSCE cards are ...

Страница 110: ... 3 Close the cable clip to secure the power cable see the figure below Figure 45 Cable Clip to Secure the Power Cable Step 4 Connect the power cable to the fuse panel or power source The voltage rating value for AC power ranges between 100 VAC to 240 VAC depending on the standards in various countries Note Cisco NCS 2000 Series Hardware Installation Guide 82 Connecting Power and Ground DLP L49 Con...

Страница 111: ...t 15454 M CBL RAUS AC power cable AUS right exit 15454 M CBL R UK AC power cable UK right exit 15454 M CBL RKOR AC power cable KOR right exit 15454 M ACCBL R AC power cable ANSI 110VAC right exit 15454 M ACCBL R2 AC power cable ANSI 220VAC right exit 15454 M ACL6 R AC power cable for data center right exit DLP L50 Connecting Office Power DC to the NCS 2002 Shelf ANSI Only This task connects DC pow...

Страница 112: ... Discharge and Grounding Guide for Cisco NCS 2000 Series NTP L30 Opening and Removing the Standard Door of the NCS 2002 Shelf on page 111 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level When installing or replacing the unit the ground connection must always be made first and disconnected last Statement 1046 Warning Hazardous voltage or energy may be pre...

Страница 113: ...s are reset and the system is not provisioned to get the time from a Network Time Protocol Simple Network Time Protocol NTP SNTP server you must reset the NCS clock After powering down the date defaults to January 1 1970 00 04 15 To reset the clock see the NTP G24 Set Up Name Date Time and Contact Information If you are using the TNC TNCE TSC or TSCE cards the system clock will run for up to three...

Страница 114: ...ite practice Step 5 Strip 1 2 inch 12 7 mm of insulation from all power cables that you will use Step 6 Crimp the lugs onto the ends of all power leads Step 7 Verify that the DC power module is installed in Slot A Step 8 Remove the screws from the terminal block protective cover from the DC power module see the figure below Figure 46 Connecting Office Power DC Power Module ANSI Only Cisco NCS 2000...

Страница 115: ...r RET and the other for 48V Note Step 10 Tighten the screws to a torque value of 7 in lb 0 79 N m to lock the lugs Step 11 Tighten the screws to a torque value of 4 in lb 0 45 N m of the terminal block protective cover on the DC power module see the figure below Cisco NCS 2000 Series Hardware Installation Guide 87 Connecting Power and Ground DLP L50 Connecting Office Power DC to the NCS 2002 Shelf...

Страница 116: ...ect them You do not need to prepare tinned solder plated or silver plated connectors and other plated connection surfaces but always keep them clean and free of contaminants Caution When terminating power return RET and frame ground do not use soldering lug screwless push in connectors quick connect or other friction fit connectors Caution Step 12 Return to your originating procedure NTP DLP L51 C...

Страница 117: ...2002 Shelf on page 111 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level When installing or replacing the unit the ground connection must always be made first and disconnected last Statement 1046 Warning Hazardous voltage or energy may be present on DC power terminals Always replace cover when terminals are not in service Be sure uninsulated conductors ar...

Страница 118: ...down the date defaults to January 1 1970 00 04 15 To reset the clock see the see the NTP G24 Set Up Name Date Time and Contact Information If you are using the TNC TNCE TSC or TSCE cards the system clock will run for up to three hours In this case no action would be required Note Procedure Step 1 Connect the return cables of the power supply to the Earth ground located at the power supply side Ste...

Страница 119: ...ars to a bright finish then coat with an antioxidant before you connect them You do not need to prepare tinned solder plated or silver plated connectors and other plated connection surfaces but always keep them clean and free of contaminants Caution When terminating power return and frame ground do not use soldering lug screwless push in connectors quick connect or other friction fit connectors Ca...

Страница 120: ... the chassis Statement 389 Warning To reduce the risk of electric shock switch on the power only after the power cord is completely installed into the power module Statement 390 Warning Procedure Step 1 To power up the node insert the fuse into the fuse position according to site practice The fuse rating must not exceed 15A in case of AC power Step 2 If the NCS 2002 does not power up check the vol...

Страница 121: ...le is completely installed into the chassis Statement 389 Warning To reduce the risk of electric shock switch on the power only after the power cord is completely installed into the power module Statement 390 Warning Procedure Step 1 Using a voltmeter verify the office battery and ground at the following points on the fuse panel a To verify the power place the black test lead of the voltmeter to t...

Страница 122: ...rify that it reads between 40 5 VDC and 57 6 VDC Then place the red test lead of the voltmeter to the RET1 A side return ground black cable and verify that no voltage is present The voltages 40 5 VDC and 57 6 VDC are respectively the minimum and maximum voltages required to power the chassis Note b To verify the B side of the shelf place the black test lead of the voltmeter to the frame ground Pla...

Страница 123: ... or 24 AWG 0 51 mm or 0 64 mm shielded wires for LAN or craft 75 ohm coaxial cable with DIN 1 0 2 3 miniature coax connector Tools Equipment NTP L35 Installing the Power and Ground to the NCS 2002 Shelf on page 76 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Always use the supplied Electrostatic Discharge ESD wristband when working with a powered NC...

Страница 124: ...timing Step 2 Complete DLP L56 Installing LAN Wires in Cisco NCS 2002 on page 102 to create an external LAN connection You must connect a CAT 5 Ethernet cable to the LAN port on the TNC TNCE TSC TSCE card to create an external LAN connection Stop You have completed this procedure DLP L54 Installing Timing Wires in Cisco NCS 2002 ANSI This task installs the timing wires in the DC 2 or AC 2 Power Mo...

Страница 125: ...le as shown in the figures below Figure 51 DC 2 Power Module ANSI BITS connectors Figure 52 AC 2 Power Module ANSI BITS Connectors Cisco NCS 2000 Series Hardware Installation Guide 97 Connecting and Routing the Cables and Wires DLP L54 Installing Timing Wires in Cisco NCS 2002 ANSI ...

Страница 126: ...step for each cable that is needed Step 4 Return to your originating procedure NTP DLP L55 Installing Timing Wires in Cisco NCS 2002 ETSI This task installs the timing wires in the AC 2 or DC 2E Power Module of NCS 2002 ETSI Purpose Cisco NCS 2000 Series Hardware Installation Guide 98 Connecting and Routing the Cables and Wires DLP L55 Installing Timing Wires in Cisco NCS 2002 ETSI ...

Страница 127: ...T cable is 15454 M TMGCBL Tools Equipment None Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 99 Connecting and Routing the Cables and Wires DLP L55 Installing Timing Wires in Cisco NCS 2002 ETSI ...

Страница 128: ...le as shown in the figures below Figure 53 DC 2E Power Module ETSI BITS Connectors Figure 54 AC 2 Power Module ETSI BITS Connectors Cisco NCS 2000 Series Hardware Installation Guide 100 Connecting and Routing the Cables and Wires DLP L55 Installing Timing Wires in Cisco NCS 2002 ETSI ...

Страница 129: ...nnectors that are used for timing input and output The input connectors for timing provide a 75 ohm termination System cables that can convert timing clocks from 75 ohms to 100 120 ohms are available See ITU T G 813 for rules about provisioning timing references Note Step 4 Connect the other end of the cable to the external source of the timing Repeat this step for each cable that is needed Step 5...

Страница 130: ...ably standard CAT 5 Tools Equipment NTP L35 Installing the Power and Ground to the NCS 2002 Shelf on page 76 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Using a 0 51 mm or 0 64 mm 22 or 24 AWG wire or a standard CAT 5 Ethernet cable connect the wires to the RJ 45 connector Step 2 Return to your originating procedure NTP Cisco NCS 2...

Страница 131: ...P L38PerformingtheNCS2002ShelfInstallationAcceptance Test Use this procedure to perform a shelf installation acceptance test for the NCS 2002 Purpose Voltmeter Tools Equipment None Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 If you installed an NCS 2002 shelf verify each applicable procedure that was completed Cisco NCS 2000 Series ...

Страница 132: ... page 400 NTP L29 Installing the Standard Door of the NCS 2002 Shelf on page 108 Step 2 Complete the DLP L49 Connecting Office Power AC to the NCS 2002 Shelf on page 80 Step 3 Complete the DLP L61 Measuring DC Voltage on the NCS 2002 Shelf on page 105 Step 4 Continue with Connect the PC and Log into the GUI Stop You have completed this procedure DLP L60 Inspecting the NCS 2002 Shelf Installation a...

Страница 133: ...edures Required Required As Needed Onsite Onsite Remote None Security Level Do not apply power to the shelf until you complete all the installation steps Caution To ensure safety of personnel and equipment do not connect any power cables into the power module until the module is completely installed into the chassis Statement 389 Warning To reduce the risk of electric shock switch on the power onl...

Страница 134: ... lead positive on the RET1 A and the red lead on the 48V A point Verify a reading between 40 5 VDC and 57 6 VDC If there is no voltage check the following and correct if necessary Battery and ground are reversed to the shelf Battery is open or missing Return is open or missing Step 3 Repeat Steps 1 and 2 for the RET2 B and 48V B of the redundant power supply input Step 4 Return to your originating...

Страница 135: ...Shelf page 132 Air Filter page 135 Front Door The front door of the NCS 2002 provides access to the shelf and air filter There are two types of front doors that act as protective panels standard door and deep front panel The deep front panel provides additional space in front of the shelf to accommodate cables that do not fit inside the standard door The deep front panel provides more space for fi...

Страница 136: ...e NCS 2002 Shelf This procedure installs the standard door of the NCS 2002 Purpose 2 Phillips Dynamometric screwdriver Tools Equipment Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series NTP L35 Installing the Power and Ground to the NCS 2002 Shelf on page 76 NTP L35 Insta...

Страница 137: ...e 57 Installing the Standard Door Step 2 Align the standard door hinges with the chassis hinges Step 3 Release the hinge pins Reinstall the door after installing all the other modules Note Cisco NCS 2000 Series Hardware Installation Guide 109 Installing the Cisco NCS 2002 Door and Other Modules NTP L29 Installing the Standard Door of the NCS 2002 Shelf ...

Страница 138: ...he door screws to a torque value of 6 5 in lb 0 75 N m to close the standard door as shown in the figure below Figure 59 Close the Standard Door of NCS 2002 Shelf Stop You have completed this procedure Cisco NCS 2000 Series Hardware Installation Guide 110 Installing the Cisco NCS 2002 Door and Other Modules NTP L29 Installing the Standard Door of the NCS 2002 Shelf ...

Страница 139: ...As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Complete the DLP L45 Opening the Standard Door of the NCS 2002 Shelf on page 111 Step 2 Complete the DLP L46 Removing the Standard Door of the NCS 2002 Shelf on page 113 Stop You have completed this procedure DLP L45 Opening the Standard Door of the NCS 2002 Shelf This task opens the standard door of the NCS 2002 system Purpose 2 ...

Страница 140: ...e of the shelf on the right side It is labeled ESD on the top and bottom Always wear an ESD wrist strap and connect the strap to the ESD plug when working on the NCS 2002 For detailed instructions on how to wear the ESD wristband refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Caution Procedure Step 1 Loosen the standard door screws see the figure below Step 2 Pu...

Страница 141: ...uipment DLP L45 Opening the Standard Door of the NCS 2002 Shelf on page 111 Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 1...

Страница 142: ...e the nut Step 2 Remove the ground cable from the shelf see the figure below Figure 62 Removing the Standard Door Cisco NCS 2000 Series Hardware Installation Guide 114 Installing the Cisco NCS 2002 Door and Other Modules DLP L46 Removing the Standard Door of the NCS 2002 Shelf ...

Страница 143: ...Step 5 Return to your originating procedure NTP NTP L40 Installing the Deep Front Panel of the NCS 2002 Shelf This procedure installs the deep front panel of the NCS 2002 shelf Purpose 2 Phillips Dynamometric screwdriver Tools Equipment Cisco NCS 2000 Series Hardware Installation Guide 115 Installing the Cisco NCS 2002 Door and Other Modules NTP L40 Installing the Deep Front Panel of the NCS 2002 ...

Страница 144: ...aft Pin Connections in NCS 2002 on page 95 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Use the deep front panel when ONS SC 10G C pluggables are installed on a NCS 2002 shelf Note Procedure Step 1 Connect the ground strap cable a Loosen the ground nut from the shelf see the figure below b Insert the lug of the ground strap cable and tighten the nut...

Страница 145: ...serting the Lug to the Shelf Step 2 Loosen the deep front panel screws and slide them outwards using the plastic tabs Figure 65 Align the Deep Front Panel and Shelf Cisco NCS 2000 Series Hardware Installation Guide 117 Installing the Cisco NCS 2002 Door and Other Modules NTP L40 Installing the Deep Front Panel of the NCS 2002 Shelf ...

Страница 146: ... the deep front panel with the shelf by performing the following sub steps at the same time a Align the right and left retention features of the deep front panel with the right and left notches present on the top of the shelf see the figure above Cisco NCS 2000 Series Hardware Installation Guide 118 Installing the Cisco NCS 2002 Door and Other Modules NTP L40 Installing the Deep Front Panel of the...

Страница 147: ...7 Align the Deep Front Panel and Shelf The figure below shows the deep front panel aligned with the shelf Figure 68 Engage the Deep Front Panel and Shelf Cisco NCS 2000 Series Hardware Installation Guide 119 Installing the Cisco NCS 2002 Door and Other Modules NTP L40 Installing the Deep Front Panel of the NCS 2002 Shelf ...

Страница 148: ...gage the Deep Front Panel and Shelf Step 6 Lock the deep front panel by tightening the screws to a torque value of 6 5 in lb 0 75 N m Step 7 Connect the other end of the ground strap cable to the ground point present on the deep front panel exterior Figure 70 Connecting the Ground Strap Cable Cisco NCS 2000 Series Hardware Installation Guide 120 Installing the Cisco NCS 2002 Door and Other Modules...

Страница 149: ...he NCS 2002 Shelf on page 115 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 121 Installing the Cisco NCS 2002 Door and Other Modu...

Страница 150: ...o the exterior of the deep front panel see the figure below Figure 71 Remove the end of the ground strap cable Cisco NCS 2000 Series Hardware Installation Guide 122 Installing the Cisco NCS 2002 Door and Other Modules NTP G331 Removing the Deep Front Panel of the NCS 2002 Shelf ...

Страница 151: ... 4 Move the deep front panel away from the shelf see the figure below Figure 73 Move the deep front panel away The deep front panel does not have a hinge and cannot be rotated like a standard door Rotating the deep front panel can damage the deep front panel shelf hinges other devices and cables placed below the NCS 2002 shelf Caution Cisco NCS 2000 Series Hardware Installation Guide 123 Installin...

Страница 152: ... to connect the EMS or the craft interface terminal to access the NCS 2002 shelf Passive Unit Inventory Interfaces USB port The passive unit inventory interfaces are used to retrieve inventory information from passive devices such as fiber trays FBG DCU patch panels passive muxponder and demuxponder and so on The inventory details are displayed in the Inventory tab in CTC Timing Connections The BI...

Страница 153: ...lor red and green LED on the faceplate When the AC power line is not connected the LED is OFF Green LED indicates that the AC power line is connected and the power module is functioning properly Red LED indicates that the AC power line is connected but an alarm is present due to secondary 48 V fuse break The shelf controller card controls the conditions that result in triggering the LED The LED ca...

Страница 154: ...odule does not support the lamp test procedure NTP L33 Installing the Power Module in the NCS 2002 Shelf This procedure installs the power module in the NCS 2002 system Purpose 2 Phillips screwdriver Tools Equipment Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prere...

Страница 155: ... in the NCS 2002 Shelf This procedure installs the AC power module in the NCS 2002 system Purpose 2 Phillips screwdriver Tools Equipment Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Securi...

Страница 156: ... power module in Slot A Figure 75 Installing the AC Power Module Cisco NCS 2000 Series Hardware Installation Guide 128 Installing the Cisco NCS 2002 Door and Other Modules DLP L47 Installing the AC Power Module in the NCS 2002 Shelf ...

Страница 157: ...ask installs the DC power module in the NCS 2002 system Purpose 2 Phillips Dynamometric screwdriver Tools Equipment Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 20...

Страница 158: ...hten the screw to a torque value of 4 in lb 0 45 N m to lock the power module in the chassis see the figure below Figure 78 DC Power Modules Installed in the NCS 2002 Shelf Step 4 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 130 Installing the Cisco NCS 2002 Door and Other Modules DLP L48 Installing the DC Power Module in the NCS 2002 Shelf ...

Страница 159: ... X 2 character LCD screen The LCD screen displays the shelf name IP address and software version that is currently used The display contrast is automatically adjusted for clear view The three accessible push buttons SLOT STATUS and PORT on the fan tray assembly are used to set the slot and port level parameters The fan tray assembly should be installed only after installing the power module During...

Страница 160: ...nstructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series NTP L33 Installing the Power Module in the NCS 2002 Shelf on page 126 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Do not operate an NCS 2002 shelf without an air filter For information on the air filter see Air Filter on page 135 Ca...

Страница 161: ...tall the fan tray assembly it is not necessary to move any of the fiber routing facilities Note Procedure Step 1 Insert the fan tray assembly in Slot B of the NCS 2002 chassis see the figure below Figure 79 Installing the Fan Tray Assembly Cisco NCS 2000 Series Hardware Installation Guide 133 Installing the Cisco NCS 2002 Door and Other Modules NTP L35 Installing the Fan Tray Assembly in the NCS 2...

Страница 162: ... into the assembly check the fan tray and listen to determine if the fans are running If the fan tray assembly is removed from the shelf wait for at least 5 seconds before plugging it back into the shelf In the event the LCD display on the fan tray assembly appears blank remove the unit from the shelf wait for at least 5 seconds and reinsert the unit into the shelf Note Stop You have completed thi...

Страница 163: ...ter must be performed as specified in your local site practices First inspection of the air filter should be performed six months after the system installation Air filters must be inspected every quarter after the initial six month inspection If they are dirty or clogged with dust they must be replaced with a new air filter Do not operate an NCS 2002 without the mandatory air filter Caution Cisco ...

Страница 164: ...Cisco NCS 2000 Series Hardware Installation Guide 136 Installing the Cisco NCS 2002 Door and Other Modules Air Filter ...

Страница 165: ...6 Installation Overview This chapter includes these sections Installing the Air Flow Regulator Mounting the Brackets on NCS 2006 Shelf Mounting the Cisco NCS 2006 Shelf Installing the Cisco NCS 2006 Door and Other Modules Connecting Power and Ground Installing and Configuring the Control Card NCS 2006 Shelf Installation Acceptance Test Cisco NCS 2000 Series Hardware Installation Guide 137 ...

Страница 166: ...Cisco NCS 2000 Series Hardware Installation Guide 138 NCS 2006 Installation Overview NCS 2006 Installation Overview ...

Страница 167: ...ir Plenum Rack and Cabinet Compatibility page 143 NTP L43 Install the Air Plenum in NCS 2006 Shelf page 144 Air Flow Performance of NCS 2006 page 161 Air Deflector An air deflector is a sheet metal part that is mounted on the NCS 2006 shelf to orient the air flow in a specific direction The air deflectors can be mounted in different positions to control the air flow Front to Front Only ETSI rack F...

Страница 168: ...tical air plenums The air that flows from the front top inlet and the front bottom inlet are channelized to the right vertical plenum inside the equipment and then to the exhaust air channel towards the left vertical air plenum The air flow is deflected by 90 degrees and exited out in the rear end Cisco NCS 2000 Series Hardware Installation Guide 140 Installing the Air Flow Regulator Air Plenum ...

Страница 169: ...The following figure shows the air flow inside the air plenum Figure 82 Air flow within the air plenum Cisco NCS 2000 Series Hardware Installation Guide 141 Installing the Air Flow Regulator Air Plenum ...

Страница 170: ...lative to the cabinet or rack Figure 83 Dimension of Cisco NCS 2006 chassis relative to the air plenum Figure 84 Dimension on Cisco NCS 2006 relative to the air plenum Cisco NCS 2000 Series Hardware Installation Guide 142 Installing the Air Flow Regulator Air Plenum ...

Страница 171: ...inch cabinet Supported ANSI 23 inch rack Supported ANSI 23 inch cabinet Supported 1 ETSI cabinet 2 1 A minimum opening of 20 600 inches is required to install the vertical air plenum behind the front rails The ANSI 19 inch two post rack that is compatible with air plenum installation is available from Telect with part number 12545 301 Note Figure 85 Minimum rear opening for ANSI 19 inch and ETSI c...

Страница 172: ...nt NTP L41 Unpacking and Inspecting the Shelf on page 20 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Before performing any of the following procedures ensure that power is removed from the DC circuit Statement 1074 Warning Before working on a chassis or working near power supplies unplug the power cord on AC units Statement 246 Warning This equipme...

Страница 173: ...g on the rack or cabinet complete the necessary task DLP L64 Installing Air Plenum for NCS 2006 Shelf in ANSI 19 inch Cabinet on page 145 DLP L66 Installing Air Plenum in NCS 2006 Shelf for ANSI 23 inch Configuration on page 149 DLP L67 Installing Air Plenum for NCS 2006 Shelf in ETSI Configuration on page 157 DLP L68 Installing Pre assembled Air Plenums in ANSI 23 inch Configuration on page 154 S...

Страница 174: ...e kit and tighten to a torque value of 11 5 in lb 1 3 N m as shown in the figure below Figure 86 Installing the bottom horizontal air plenum in the ANSI 19 inch cabinet Step 3 Install the vertical air plenum to the left of the horizontal air plenum a Insert the vertical plenum in the free space between the horizontal plenum and cabinet b Install the wing head screws from the internal side of the h...

Страница 175: ...right of the horizontal air plenum Step 5 Install the wing head screws provided with the kit and tighten to a torque value of 11 5 in lb 1 3 N m Figure 88 Installing the right vertical air plenum Cisco NCS 2000 Series Hardware Installation Guide 147 Installing the Air Flow Regulator DLP L64 Installing Air Plenum for NCS 2006 Shelf in ANSI 19 inch Cabinet ...

Страница 176: ...nums Follow step 3a to step 3c Figure 89 Installing the horizontal air plenum above the vertical plenums Cisco NCS 2000 Series Hardware Installation Guide 148 Installing the Air Flow Regulator DLP L64 Installing Air Plenum for NCS 2006 Shelf in ANSI 19 inch Cabinet ...

Страница 177: ... the position of the top horizontal plenum Step 9 Install the NCS 2006 empty chassis between the two horizontal plenums Figure 90 Installing the NCS 2006 chassis between the horizontal air plenum Step 10 Return to your originating procedure NTP DLP L66InstallingAirPlenuminNCS2006ShelfforANSI23 inchConfiguration This task installs the air plenum for the NCS 2006 shelf in the ANSI 23 inch cabinet or...

Страница 178: ...s needed Required As Needed Onsite Onsite Remote None Security Level The airplenums for ANSI 23 inch configuration can be pre assembled outside the cabinet and then installed inside the cabinet See DLP L68 Installing Pre assembled Air Plenums in ANSI 23 inch Configuration on page 154 Note Cisco NCS 2000 Series Hardware Installation Guide 150 Installing the Air Flow Regulator DLP L66 Installing Air...

Страница 179: ... 23 inch cabinet or rack Step 4 Insert the wing head screws provided with the kit and tighten to a torque value of 11 5 in lb 1 3 N m Figure 92 Installing the bottom horizontal air plenum in the ANSI 23 inch configuration Step 5 Install the vertical air plenum to the left of the horizontal air plenum a Insert the vertical air plenum in the free space between the horizontal air plenum and cabinet C...

Страница 180: ...Figure 93 Installing the left vertical air plenum Step 6 Install the vertical plenum to the right of the horizontal air plenum Follow step 5a to step 5c Figure 94 Installing the right vertical air plenum Cisco NCS 2000 Series Hardware Installation Guide 152 Installing the Air Flow Regulator DLP L66 Installing Air Plenum in NCS 2006 Shelf for ANSI 23 inch Configuration ...

Страница 181: ...head screws provided with the kit and tighten to a torque value of 11 5 in lb 1 3 N m Figure 95 Installing the horizontal plenum above the vertical plenums Cisco NCS 2000 Series Hardware Installation Guide 153 Installing the Air Flow Regulator DLP L66 Installing Air Plenum in NCS 2006 Shelf for ANSI 23 inch Configuration ...

Страница 182: ...t the position of the top horizontal plenum Step 11 Install the NCS 2006 empty chassis between the horizontal plenums Figure 96 Installing the NCS 2006 chassis between the horizontal air plenum Step 12 Return to your originating procedure NTP DLP L68 Installing Pre assembled Air Plenums in ANSI 23 inch Configuration This task installs pre assembled air plenums for the NCS 2006 shelf in the ANSI 23...

Страница 183: ...rews 8 Wing head screws 8 Adapter plates One air plenum kit horizontal and vertical air plenum Tools Equipment As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 155 Installing the Air Flow Regulator DLP L68 Installing Pre assembled Air Plenums in ANSI 23 inch Configuration ...

Страница 184: ...head screws from the internal side of the horizontal plenum and tighten the screws to a torque value of 11 5 in lb 1 3 N m Step 6 Install the vertical air plenum to the right of the horizontal air plenum Follow step 5 Step 7 Install the horizontal air plenum above the vertical air plenums Follow step 5 Figure 97 Pre assembling the air plenums Step 8 Install the pre assembled air plenum for ANSI 23...

Страница 185: ...osition of the top horizontal plenum Step 11 Install the empty NCS 2006 chassis between the horizontal plenums Step 12 Return to your originating procedure NTP DLP L67 Installing Air Plenum for NCS 2006 Shelf in ETSI Configuration This task installs the air plenum for the NCS 2006 shelf in the ETSI configuration Purpose Cisco NCS 2000 Series Hardware Installation Guide 157 Installing the Air Flow ...

Страница 186: ... Onsite Remote None Security Level Procedure Step 1 Install the ETSI adapter plates on the horizontal air plenums Step 2 Align the screws to fix the adapter plates to the shelf Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 98 Installing the adapter plates on the horizontal air plenum Cisco NCS 2000 Series Hardware Installation Guide 158 Installing the Air Flow R...

Страница 187: ...the left of the horizontal air plenum a Insert the vertical plenum in the free space between the horizontal plenum and cabinet b Install the wing head screws from the internal side of the horizontal plenum as shown in the figure below c Tighten the screws to a torque value of 11 5 in lb 1 3 N m Figure 100 Installing the left vertical air plenum Cisco NCS 2000 Series Hardware Installation Guide 159...

Страница 188: ...t in the ETSI cabinet Step 8 Install the wing head screws provided with the kit and tighten to a torque value of 11 5 in lb 1 3 N m Figure 101 Installing the horizontal air plenum above the vertical plenums Cisco NCS 2000 Series Hardware Installation Guide 160 Installing the Air Flow Regulator DLP L67 Installing Air Plenum for NCS 2006 Shelf in ETSI Configuration ...

Страница 189: ...chassis between the horizontal plenums Figure 102 Installing the NCS 2006 chassis below the horizontal air plenum Step 12 Return to your originating procedure NTP Air Flow Performance of NCS 2006 The tables below summarizes the air flow performance of NCS 2006 WorstController Card Slot 8 Flow CFM Worst Line Card Slot 7 Flow CFM Deflector Configuration Case 13500 RPM 40 C and 55 C 9600 RPM 27 C 135...

Страница 190: ...nlet ANSI Front to Side Bulk Chassis Flow CFM Deflector Configuration Case 13500 RPM 9600 RPM 295 6 215 3 No deflectors Side to Side 135 8 97 7 Inlet and Outlet ETSI Front to Rear 258 6 187 7 Only Inlet ETSI Front to Side 166 9 120 5 Inlet and Outlet ANSI Front to Rear 268 6 193 5 Only Inlet ANSI Front to Side Cisco NCS 2000 Series Hardware Installation Guide 162 Installing the Air Flow Regulator ...

Страница 191: ...uer or enamel either use the thread forming screws provided with the NCS 2006 shipping kit or remove the coating from the threads to ensure electrical continuity Caution The reversible mounting bracket is used to mount the shelf on a 19 inch or 23 inch 482 6 mm or 584 2 mm rack The sections are NTP L2 Mounting the Brackets in ANSI Configuration page 163 NTP L46 Mounting the Brackets in ETSI Config...

Страница 192: ...e the rack to tip over Statement 1048 Warning This product requires short circuit overcurrent protection to be provided as part of the building installation Install only in accordance with national and local wiring regulations Statement 1045 Warning This product relies on the building s installation for short circuit overcurrent protection Ensure that the protective device is rated not greater tha...

Страница 193: ...f the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Statement 1006 To prevent airflow restriction allow clearance around the ventilation openings to be at least 1 inch 25 4 mm Statement 1076 Warning To comply with EN50121 4 2006 Railway applications Electromagnetic compatibility a shielded cable must be used to connect to the EM...

Страница 194: ...2006 Shelf for DC Power Module Installation on page 168 Step 2 Complete the necessary task as applicable DLP L3 Mounting the Reversible Brackets on the NCS 2006 Shelf for ANSI Rack Configuration on page 169 DLP L4 Mounting the Bracket with Air Deflectors Front to Back on the NCS 2006 Shelf for ANSI Rack Configuration on page 171 Stop You have completed this procedure Cisco NCS 2000 Series Hardware...

Страница 195: ... the position of the mechanical locking system on the rear side of the chassis To use the AC power module the screw must be close to the AC silk screen text see the figure below Figure 104 AC Power Module Installation Rear Side of the NCS 2006 Shelf Step 2 Loosen the screw and move it to the left position towards the AC silk screen text Step 3 Tighten the screw again to a torque value of 4 in lb 0...

Страница 196: ... Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Verify the position of the mechanical locking system on the rear side of the chassis To use the DC power module the screw must be close to the DC silk screen text see the figure below Figure 105 DC Power Module Installation Rear Side of the NCS 2006 Shelf Cisco NCS 2000 Series Hardware Installation Guide 168 Mounting the...

Страница 197: ...s Needed Onsite Onsite Remote None Security Level Use only the fastening hardware provided with the NCS 2006 to prevent loosening deterioration and electromechanical corrosion of the hardware and joined material Caution When mounting the NCS 2006 in a frame with a nonconductive coating such as paint lacquer or enamel either use the thread forming screws provided with the NCS 2006 ship kit or remov...

Страница 198: ...re below The narrow side of the mounting bracket should be towards the front of the shelf Figure 106 Mounting the Brackets on the NCS 2006 shelf for a 19 inch 482 6 mm ANSI Configuration Cisco NCS 2000 Series Hardware Installation Guide 170 Mounting the Brackets on NCS 2006 Shelf DLP L3 Mounting the Reversible Brackets on the NCS 2006 Shelf for ANSI Rack Configuration ...

Страница 199: ...ps 1 through 3 for the mounting bracket on the opposite side Step 5 Return to your originating procedure NTP DLP L4 Mounting the Bracket with Air Deflectors Front to Back on the NCS 2006 Shelf for ANSI Rack Configuration This task installs the bracket with air deflectors front to back on the NCS 2006 shelf for ANSI rack configuration In an ANSI rack the air deflectors can be mounted only in the 23...

Страница 200: ...e right side of the chassis see Diagram 1 of the figure below Step 2 Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 4 Place the left back air deflector flush chassis as shown in Diagram 2 of the figure below Do not mount the left back deflector exhaus...

Страница 201: ...Air Deflectors Front to Back on the NCS 2006 Shelf for the ANSI rack Configuration Cisco NCS 2000 Series Hardware Installation Guide 173 Mounting the Brackets on NCS 2006 Shelf DLP L4 Mounting the Bracket with Air Deflectors Front to Back on the NCS 2006 Shelf for ANSI Rack Configuration ...

Страница 202: ...nch mounting bracket flush in the front position see Diagram 1 of the figure below or in the middle position see Diagram 3 of the figure below against the left side of the chassis Step 11 Align the screw holes on the 23 inch mounting bracket with the screw holes on the left side of the chassis Step 12 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 109 Mounting th...

Страница 203: ...k as applicable DLP L5 Mounting the Brackets on the NCS 2006 Shelf for ETSI Rack Configuration on page 176 DLP L6 Mounting the Air Deflectors Front to Front on the NCS 2006 Shelf for ETSI Rack Configuration on page 177 DLP L7 Mounting the Bracket with Air Deflectors Front to Back on the NCS 2006 Shelf for ETSI Rack Configuration on page 179 DLP L8 Mounting the Bracket with Air Deflectors Front to ...

Страница 204: ...e Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Use only the fastening hardware provided with the NCS 2006 to prevent loosening deterioration and electromechanical corrosion of the hardware and joined material Caution When mounting the NCS 2006 in a frame with a nonconductive coating such as paint lacquer or enamel either use the thread forming screws provided wi...

Страница 205: ... to your originating procedure NTP DLP L6 Mounting the Air Deflectors Front to Front on the NCS 2006 Shelf for ETSI Rack Configuration This task installs the air deflectors front to front on the NCS 2006 shelf for ETSI rack configuration The air deflectors can be installed only in the front position of the chassis Note Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small ...

Страница 206: ...es on the right side of the chassis Figure 111 Mounting the Air Deflectors Front to Front on the NCS 2006 Shelf for ETSI Rack Configuration Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 4 Place the left front air deflector flush against the left side of the chassis Do not mount the left front deflector exhaust air deflector if these cards are to be installe...

Страница 207: ...eded Required As Needed Onsite Onsite Remote None Security Level Use only the fastening hardware provided with the NCS 2006 to prevent loosening deterioration and electromechanical corrosion of the hardware and joined material Caution Procedure Step 1 Place the right front air deflector flush against the right side of the chassis see Diagram 1 of the figure below Step 2 Align the screw holes on th...

Страница 208: ...S 2006 shelf Figure 112 Mounting the Air Deflectors Front to Back on the NCS 2006 Shelf for ETSI Rack Configuration Cisco NCS 2000 Series Hardware Installation Guide 180 Mounting the Brackets on NCS 2006 Shelf DLP L7 Mounting the Bracket with Air Deflectors Front to Back on the NCS 2006 Shelf for ETSI Rack Configuration ...

Страница 209: ... lb 1 3 N m Step 10 Place the mounting bracket flush in the middle position see Diagram 1 of the figure below or the front position see Diagram 3 of the figure below against the left side of the chassis Step 11 Align the screw holes on the mounting bracket with the screw holes on the left side of the chassis Step 12 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure ...

Страница 210: ...he right side of the chassis see Diagram 1 of the figure below Step 2 Align the screw holes on the right front air deflector with the screw holes on right side of the chassis Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 4 Place the mounting bracket flush against the left side of the chassis see Diagram 2 of the figure below Step 5 Align the screw holes on ...

Страница 211: ...orque value of 11 5 in lb 1 3 N m See Diagram 4 of the figure below Figure 114 Mounting the Bracket with Air Deflectors Front to Top on the NCS 2006 Shelf for ETSI Rack Configuration Step 10 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 183 Mounting the Brackets on NCS 2006 Shelf DLP L8 Mounting the Bracket with Air Deflectors Front to Top on the NCS 20...

Страница 212: ...isco NCS 2000 Series Hardware Installation Guide 184 Mounting the Brackets on NCS 2006 Shelf DLP L8 Mounting the Bracket with Air Deflectors Front to Top on the NCS 2006 Shelf for ETSI Rack Configuration ...

Страница 213: ...front of the rack If the shelf is mounted in the middle position then it projects 5 1 inches 129 54 mm from the front of the rack The shelf mounts in both Electronic Industries Alliance EIA standard and Telcordia standard racks The shelf is a total of 17 inches 431 8 mm wide with no mounting ears attached Ring runs are not provided by Cisco and might hinder side by side installation of shelves whe...

Страница 214: ...ration Mounting a Single Shelf Mounting the NCS 2006 shelf on a rack requires a minimum of 10 4 inches 265 mm of vertical rack space To ensure that the mounting is secure use two to three 12 24 mounting screws for each side of the shelf For an ANSI rack the brackets can be mounted in the front or middle position Cisco NCS 2000 Series Hardware Installation Guide 186 Mounting the Cisco NCS 2006 Shel...

Страница 215: ...es This method of mounting does not restrict the air flow because the air vents are on either sides of the NCS 2006 shelves ETSI Rack Installation The NCS 2006 shelf is mounted on a 600 x 600 mm 23 6 x 23 6 inch or 600 x 300 mm 23 6 x 11 8 inch ETSI standard equipment rack In an ETSI rack the shelf can be mounted only in the front position The shelf projects 1 7 inch 43 18 mm from the front of the...

Страница 216: ...TSI racks can hold seven NCS 2006 shelves When mounting a shelf in a partially filled rack load the rack from the bottom to the top with the heaviest component at the bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Caution Cisco NCS 2000 Series Hardware Installation Guide 188 Mounting the Cisco NCS 2006 S...

Страница 217: ...e NCS 2006 shelf weight see the A 3 14 Dimensions section on page A 14 NTP L3 Mounting the NCS 2006 Shelf This procedure helps in mounting the NCS 2006 shelf Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver ETSI only Six M6 x 20 pan head Phillips mounting screws ANSI only Six 12 24 x 3 4 pan head Phillips mounting screws Tools Equipment DLP L62 U...

Страница 218: ...e maximum recommended ambient temperature of 131 F 55 C Statement 1047 Warning Take care when connecting units to the supply circuit so that wiring is not overloaded Statement 1018 Warning To prevent bodily injury when mounting or servicing this unit in a rack you must take special precautions to ensure that the system remains stable The following guidelines are provided to ensure your safety Warn...

Страница 219: ...NCS 2006 Shelf on a Rack One Person on page 191 DLP L10 Mounting the NCS 2006 Shelf on a Rack Two People on page 193 DLP L11 Mounting Multiple NCS 2006 Shelves on a Rack on page 195 Stop You have completed this procedure DLP L9 Mounting the NCS 2006 Shelf on a Rack One Person This task allows one person to mount the shelf on a rack In an ANSI rack the chassis can be installed in the front or the m...

Страница 220: ...e rating must not exceed 40A For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes Step 2 Ensure that the shelf is mounted on the appropriate rack equipment 23 inches 584 2 mm or 19 inches 482 6 mm for racks 600 x ...

Страница 221: ... in the rack Step 5 Using the Phillips Dynamometric screwdriver install one mounting screw in each side of the assembly Tighten the screw to a torque value of 22 in lb 2 5 N m Step 6 When the shelf is secured to the rack install the remaining two mounting screws on either sides Use at least one set of the horizontal screw slots on the shelf to prevent slippage Note Step 7 Return to your originatin...

Страница 222: ...he fuse rating must not exceed 40A For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes Step 2 Ensure that the shelf is mounted on the appropriate rack equipment 23 inches 584 2 mm or 19 inches 482 6 mm for racks ...

Страница 223: ...middle position In an ETSI rack the chassis is installed only in the front position Note Purpose 2 Phillips Dynamometric screwdriver ETSI only Six M6 x 20 pan head Phillips mounting screws per shelf only Six 12 24 x 3 4 pan head Phillips mounting screws per shelf Tools Equipment NTP L2 Mounting the Brackets in ANSI Configuration on page 163 Prerequisite Procedures As needed Required As Needed Onsi...

Страница 224: ...use rating must not exceed 40A For AC power supply the fuse rating must not exceed 20A Step 2 Mount the first shelf in the bottom of the rack usingDLP L9 Mounting the NCS 2006 Shelf on a Rack One Person on page 191 or DLP L10 Mounting the NCS 2006 Shelf on a Rack Two People on page 193 Diagram 1 of the figure below shows multiple NCS 2006 shelf assemblies mounted on the rack Cisco NCS 2000 Series ...

Страница 225: ...gure 118 Multiple NCS 2006 Shelves Mounted on the Rack Step 3 Repeat Step 2 for every shelf you need to install Step 4 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 197 Mounting the Cisco NCS 2006 Shelf DLP L11 Mounting Multiple NCS 2006 Shelves on a Rack ...

Страница 226: ...Cisco NCS 2000 Series Hardware Installation Guide 198 Mounting the Cisco NCS 2006 Shelf DLP L11 Mounting Multiple NCS 2006 Shelves on a Rack ...

Страница 227: ...le For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes The voltage rating value for AC power ranges between 100 VAC to 240 VAC depending on the standards in various countries This product is intended for use on t...

Страница 228: ...B for DC power module on the DC power module For redundant DC power feeds install both the DC power modules and use the two power cables shipped with the NCS 2006 and one ground cable For a a DC power supply the fuse rating must not exceed 40A For redundant AC power feeds install both the AC power modules and use the two power cables right and left cables shipped with the NCS 2006 and one ground c...

Страница 229: ...le from fuse panel to power modules shipped with the NCS 2006 Two hole grounding lug shipped with the NCS 2006 Tools Equipment NTP L9 Installing the Power Modules in the NCS 2006 Shelf on page 282 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Requi...

Страница 230: ...ontact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available Statement 1024 Warning Never install an AC power module and a DC power module in the same chassis Statement 1050 Warning When stranded wiring is required use approved wiring terminations such as closed loop or spade type with upturned lugs These terminations should be ...

Страница 231: ...C Statement 1005 Warning A readily accessible two poled disconnect device must be incorporated in the fixed wiring Statement 1022 Warning This unit might have more than one power supply connection all connections must be removed to de energize the unit Statement 1028 Warning Always use the supplied ESD wristband when working with a powered NCS 2006 For detailed instructions on how to wear the ESD ...

Страница 232: ...r to the NCS 2006 shelf Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Wire wrapper Wire cutters Wire strippers Crimp tool Fuse panel Ground cable 13 3 mm 6 AWG stranded Tools Equipment NTP L2 Mounting the Brackets in ANSI Configuration on page 163 NTP L5 Opening and Removing the Standard Door of the NCS 2006 Shelf on page 252 Connect the chass...

Страница 233: ... and local codes Caution Not more than 7 feet 2 m of the power supply cable should be exposed between the equipment and the fiber storage tray Note When terminating the frame ground do not use soldering lug connectors screwless push in connectors quick connect connectors or other friction fit connectors Caution If the system loses power or if both the TNC TNCE TSC or TSCE cards are reset you must ...

Страница 234: ...NCS 2006 Step 2 Attach the AC power cable to the cable connector in the AC power module see the figure below Figure 119 Connecting Office Power AC Power Modules Cisco NCS 2000 Series Hardware Installation Guide 206 Connecting Power and Ground DLP L18 Connecting Office Power AC to the NCS 2006 Shelf ...

Страница 235: ...elow Note Figure 121 Power Cable Exit Step 4 Connect the power cable to the fuse panel or power source The voltage rating value for AC power ranges between 100 VAC to 240 VAC depending on the standards in various countries Note Turn on the power after installing the power cables Note Step 5 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 207 Connecting Po...

Страница 236: ...54 M CBL LAUS AC power cable AUS left exit 15454 M CBL RAUS AC power cable AUS right exit 15454 M CBL L UK AC power cable UK left exit 15454 M CBL R UK AC power cable UK right exit 15454 M CBL LKOR AC power cable KOR left exit 15454 M CBL RKOR AC power cable KOR right exit 15454 M ACCBL2 L AC2 power cable 110VAC left exit 15454 M ACCBL2 R AC2 power cable 110VAC right exit 15454 M ACCBL2 L2 AC2 pow...

Страница 237: ...ded Listed pressure dual holes lugs suitable for 8 AWG copper conductors Tools Equipment NTP L2 Mounting the Brackets in ANSI Configuration on page 163 NTP L5 Opening and Removing the Standard Door of the NCS 2006 Shelf on page 252 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 S...

Страница 238: ...reated as DC I as defined in Telcordia GR 1089 CORE Issue 5 Note If the system loses power or both the TNC TNCE TSC or TSCE cards are reset and the system is not provisioned to get the time from a Network Time Protocol Simple Network Time Protocol NTP SNTP server you must reset the NCS 2006 clock After powering down the date defaults to January 1 1970 00 04 15 To reset the clock see the NTP G24 Se...

Страница 239: ...Step 5 Strip 1 2 inch 12 7 mm of insulation from all power cables that you will use Step 6 Crimp the lugs onto the ends of all the power leads Step 7 Verify that the DC power module is installed in Slot A or Slot B or both of the NCS 2006 shelf Step 8 Remove the terminal block protective covers from the DC power modules see the figure below Figure 122 Connecting Office Power DC Power Modules ANSI ...

Страница 240: ... nuts to a torque value of 20 in lb 2 25 N m Figure 123 Connecting Office Power DC Power Modules ANSI Only Step 12 Mount the terminal block protective covers on the DC power modules see the figure below For Slot A power module the power cable exits from the left side For Slot B power module the power cable exits from the right side Note Cisco NCS 2000 Series Hardware Installation Guide 212 Connect...

Страница 241: ...ect them You do not need to prepare tinned solder plated or silver plated connectors and other plated connection surfaces but always keep them clean and free of contaminants Caution When terminating power return RET and frame ground do not use soldering lug screwless push in connectors quick connect or other friction fit connectors Caution Step 13 Return to your originating procedure NTP DLP L20 C...

Страница 242: ...atic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level When installing or replacing the unit the ground connection must always be made first and disconnected last Statement 1046 Warning Hazardous voltage or energy may be present on DC power terminals Always replace cover when terminals are not in ser...

Страница 243: ... of the Turn Up a Node chapter in the Cisco 2002 and Cisco 2006 Configuration Guide If you are using the TNC TNCE TSC or TSCE cards the system clock will run for up to three hours In this case no action would be required Note Procedure Step 1 Connect the return cables of the power supply to the Earth ground located at the power supply side Step 2 Verify that the DC power module is installed in Slo...

Страница 244: ...ns coat all bare conductors battery battery return and frame ground with an appropriate antioxidant compound Bring all unplated connectors braided strap and bus bars to a bright finish then coat with an antioxidant before you connect them You do not need to prepare tinned solder plated or silver plated connectors and other plated connection surfaces but always keep them clean and free of contamina...

Страница 245: ... Office Power AC to the NCS 2006 Shelf on page 204 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Do not apply power to the shelf until you complete all the installation steps Caution To ensure safety of personnel and equipment do not connect any power cables into the power module until the module is completely installed into the chassis Statement 389 ...

Страница 246: ... Configuration on page 163 NTP L5 Opening and Removing the Standard Door of the NCS 2006 Shelf on page 252 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series DLP L19 Connecting Office Power DC to the NCS 2006 Shelf Only on page 209 DLP L20 Connecting Office Power DC to the NCS...

Страница 247: ... node insert the fuse into the fuse position according to site practice The fuse rating must not exceed 40 A Step 3 Using a voltmeter verify the NCS 2006 shelf for 48 VDC or 60 VDC battery and ground a To verify the A side of the shelf place the black lead of the voltmeter to the frame ground Place the red test lead to the 48 V or 60 V A side battery connection red cable Verify that it reads betwe...

Страница 248: ...Cisco NCS 2000 Series Hardware Installation Guide 220 Connecting Power and Ground DLP L22 Turning On and Verifying DC Office Power on the NCS 2006 Shelf ...

Страница 249: ... module with the cable module Fiber Module The minimum fiber bend radius is 1 5 inches The fiber guide can be replaced with a cable guide to route the CAT 5 Ethernet cables The maximum number of 2 mm diameter patch cords that can be managed is 144 or alternatively 72 CAT5 cables To manage extra length fiber and fan out a dedicated fiber storage unit and patch panel unit can be installed inside the...

Страница 250: ...mum distance required to place the bulk attenuator outside the shelf from any port of a card Note Cable and Fiber Routing Cable and fiber routing accommodates all the high density cards for line card connections in NCS 2006 The exit of the fibers and cables is split into two channels The line card from slot 1 to 4 exits from the lower right side and the line card from 5 to 8 exit from the upper ri...

Страница 251: ... Step 3 Complete DLP L25 Routing and Locking Cables on page 225 Stop You have completed this procedure DLP L23 Removing the Fiber Module This procedure removes the default fiber module in the NCS 2006 system Purpose 1 Phillips cross head PH screwdriver Tools Equipment None Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware I...

Страница 252: ...shelf Step 4 Extract the fiber module by gently removing it from the NCS 2006 shelf Figure 128 Removing the Fiber module Step 5 Return to your originating procedure NTP DLP L24 Installing the Cable Module This procedure installs the cable module in the NCS 2006 system Purpose Phillips cross head PH screwdriver 1 Tools Equipment DLP L23 Removing the Fiber Module on page 223 Prerequisite Procedures ...

Страница 253: ...n the screws to a torque value of 4 in lb 0 45 N m to attach the cable module to the NCS 2006 shelf Figure 129 Installing the Cable Module Step 4 Return to your originating procedure NTP DLP L25 Routing and Locking Cables This task routes and locks the cables on the NCS 2006 system Purpose None Tools Equipment None Prerequisite Procedures Cisco NCS 2000 Series Hardware Installation Guide 225 Conne...

Страница 254: ...CU cable is available to allow cable management during extraction of the power module Figure 130 ECU module Cable Routing It is also possible to manage the extraction of the power module without adding the extra length of ECU cable by reducing the number of cables in the right exit area see Diagram 1 of the figure below An extra length Cisco NCS 2000 Series Hardware Installation Guide 226 Connecti...

Страница 255: ...provided in the accessories kit Step 3 To route the optical patch cords or copper cables do the following as necessary a Route the optical patch cords from the line cards through the fiber or cable module as shown in the figure below Figure 132 Cable Routing Cisco NCS 2000 Series Hardware Installation Guide 227 Connecting and Routing the Cables DLP L25 Routing and Locking Cables ...

Страница 256: ... See Diagram 2 of the figure below b Move the ECU cables away from the chassis Ensure that the alarm cable with the plastic bend radius controller is not moved See Diagram 3 of the figure below c Remove the power module See Diagram 4 of the figure below Figure 133 Sequence to Remove the Power Module Step 5 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 2...

Страница 257: ...or Cisco NCS 2000 Series Caution Procedure Step 1 Complete DLP L26 Installing Alarm Wires in NCS 2006 on page 230 if you are provisioning external alarms Step 2 Complete DLP L27 Installing Timing Wires on NCS 2006 ANSI on page 235 if you are provisioning external timing in Step 3 Complete DLP L28 Installing Timing Wires in NCS 2006 ETSI on page 237 if you are provisioning external timing in ETSI S...

Страница 258: ...2006 to provision external environmental alarms and controls Purpose Alarm SCSI 26 pin cable Wire wrap tool for BITS Screw for the alarm cable Tools Equipment NTP L8 Install the NCS 2006 ECU and ECU S Modules on page 277 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Connect one end of the SCSI cable to the input alarms or input outpu...

Страница 259: ...ide or the right side see the figures below Step 4 Snap the cable bend controller on the cable See Diagram 4 of the figures below Step 5 Return to your originating procedure NTP Figure 134 Installing the ECU Alarm Cable Left Exit Option Figure 135 Installing the ECU Alarm Cable Right Exit Option Cisco NCS 2000 Series Hardware Installation Guide 231 Connecting and Routing the Cables DLP L26 Install...

Страница 260: ...ritical Audible Alarm Input Pair 3 Black Orange 3 Remote Audible Alarm Input Pair 4 Black Yellow 4 Minor Visual Alarm Input Pair 5 Black Green 5 Major Visual Alarm Input Pair 6 Black Blue 6 Critical Visual Alarm Input Pair 7 White Blue 7 Remote Visual Alarm Input Pair 8 White Orange 8 Input Pair 9 White Green 9 Alarm Cutoff ACO Input Pair 10 White Brown 10 Cisco NCS 2000 Series Hardware Installati...

Страница 261: ...ue Black 19 Critical Visual Alarm Input Pair 7 Blue White 20 Remote Visual Alarm Input Pair 8 Orange White 21 Input Pair 9 Green White 22 Alarm Cutoff ACO Input Pair 10 Brown White 23 24 Output Pair 1 or Input Pair 11 Output Pair 3 or Input Pair 13 Gray White 25 Output Pair 2 or Input Pair 12 Output Pair 4 or Input Pair 14 Gray Black 26 Table 14 SCSI Alarm Wire Wrap Cable 15454 M ALMCBL2 Connector...

Страница 262: ...put Pair 10 White Brown 10 11 12 13 Minor Audible Alarm Input Pair 1 Brown Black 14 Major Audible Alarm Input Pair 2 Red Black 15 16 Remote Audible Alarm Input Pair 4 Yellow Black 17 Minor Visual Alarm Input Pair 5 Green Black 18 Major Visual Alarm Input Pair 6 Blue Black 19 20 Remote Visual Alarm Input Pair 8 Orange White 21 Input Pair 9 Green White 22 Alarm Cutoff ACO Input Pair 10 Brown White 2...

Страница 263: ...te Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Locate the timing connector on the ECU module BITS 1 or BITS 2 In Out The following figure shows ECU module wire wrap pins Figure 136 ECU module Wire wrap Pins The following table lists the ECU module pin assignments for ANSI Cisco NCS 2000 Series Hardware Installation Guide 235 Connecting and Rout...

Страница 264: ...e timing Change the timing input to high impedance lesser or greater than 3 ohms using a jumper on the ECU module Remove the P1 jumper of the BITS 1 to change the top timing input and the P2 Jumper of the BITS 2 to change the bottom timing input Route the wire wrap connections as shown in the figure below to prevent interference with the MSM ports Note Figure 137 ECU module Wire wrap Cabling ANSI ...

Страница 265: ... BITS IN OUT cable is 15454 M TMGCBL Tools Equipment NTP L8 Install the NCS 2006 ECU and ECU S Modules on page 277 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Connect the clock cable to the corresponding ECU module connector using a coaxial cable with DIN 1 0 2 3 miniature coaxial connectors The following figure shows the ECU modul...

Страница 266: ...ate the connectors a Slide the coupling sleeve of the coaxial cable backward See diagram1 of the figure below b Connect the cable to the ECU module connector See diagram2 of the figure below c Slide the coupling sleeve forward to lock the cable connector to the ECU module connector See diagram3 of the figure below Cisco NCS 2000 Series Hardware Installation Guide 238 Connecting and Routing the Cab...

Страница 267: ...ach case the left connector is the input and the right connector is the output The input connectors for timing provide a 75 ohm termination Note Step 3 Connect the other end of the cable to the external source of the timing signal according to the table below Repeat for each cable Table 16 ECU module Pin Assignments ETSI Function Pin Input from external drive IN 1 Output to external drive OUT 1 In...

Страница 268: ...e NCS 2006 ECU and ECU S Modules on page 277 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level We recommend the use of RJ 45 port craft terminal port or the EMS port on the ECU module to establish LAN connectivity The advantages of using the RJ 45 ports on the ECU module include CAT 5 Ethernet cable connections can be managed better by routing the cable ...

Страница 269: ...al LAN switch port Note Procedure Step 1 Using 0 51 mm or 0 64 mm 22 or 24 AWG wire or a standard CAT 5 Ethernet cable connect the wires to the RJ 45 connector Step 2 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 241 Connecting and Routing the Cables DLP L29 Installing LAN Wires in NCS 2006 ...

Страница 270: ...Cisco NCS 2000 Series Hardware Installation Guide 242 Connecting and Routing the Cables DLP L29 Installing LAN Wires in NCS 2006 ...

Страница 271: ... Installation Acceptance Test Use this procedure to perform a shelf installation acceptance test for the NCS 2006 shelf Purpose Voltmeter Tools Equipment None Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 If you installed an NCS 2006 shelf complete the table below by verifying that each applicable procedure was completed Cisco NCS 200...

Страница 272: ...age 282 NTP L12 Installing Power and Ground to the NCS 2006 Shelf on page 200 NTP L11 Installing the Fan Tray Assembly in the NCS 2006 Shelf on page 296 DLP L62 Installing the TNC TNCE TSC TSCE TNCS or TNCS O Card on page 400 NTP L4 Installing the Standard Door of the NCS 2006 Shelf on page 247 Step 2 Complete the DLP L63 Inspecting the Shelf on page 22 Step 3 Complete the DLP L61 Measuring DC Vol...

Страница 273: ... 2006 Shelf page 265 External Connection Units page 270 NTP L8 Install the NCS 2006 ECU and ECU S Modules page 277 NTP L66 Upgrading to NCS 2006 ECU60 S Module page 280 Power Modules page 280 NTP L9 Installing the Power Modules in the NCS 2006 Shelf page 282 LCD Unit page 292 NTP L10 Installing the LCD Module in the NCS 2006 Shelf page 292 Fan Tray Assembly page 295 NTP L11 Installing the Fan Tray...

Страница 274: ...ry front door is preinstalled on the shelf The temporary door is used only for shipping purpose and must not be used in the chassis The temporary door can be opened by removing the tape that is present on top of the door Note You must remove the door before proceeding with the shelf installation The NCS 2006 door can be opened by loosening the front screws and pushing the latch in the opposite dir...

Страница 275: ...Installing the Standard Door of the NCS 2006 Shelf This procedure installs the standard door of the NCS 2006 shelf Purpose 2 Phillips Dynamometric screwdriver Tools Equipment Cisco NCS 2000 Series Hardware Installation Guide 247 Installing the Cisco NCS 2006 Door and Other Modules NTP L4 Installing the Standard Door of the NCS 2006 Shelf ...

Страница 276: ...6 Shelf on page 282 NTP L10 Installing the LCD Module in the NCS 2006 Shelf on page 292 NTP L12 Installing Power and Ground to the NCS 2006 Shelf on page 200 NTP L11 Installing the Fan Tray Assembly in the NCS 2006 Shelf on page 296 NTP L13 Installing the Cable and Fiber Modules on page 222 NTP L14 Attaching Wires to Alarm Timing LAN and Craft Pin Connections on page 229 Prerequisite Procedures As...

Страница 277: ...ace the mechanical stop on the retention feature See Diagram 1 of the figure below Step 6 Place the retention feature on the pin present on the chassis See Diagram 2 of the figure below Step 7 Raise the door to slide the pin See Diagram 3 of the figure below Step 8 Slide the mechanical stop to lock the door position and tighten the screws See Diagram 4 of the figure below Cisco NCS 2000 Series Har...

Страница 278: ...ng all the other modules Note Figure 144 Mounting the Mechanical Stop Cisco NCS 2000 Series Hardware Installation Guide 250 Installing the Cisco NCS 2006 Door and Other Modules NTP L4 Installing the Standard Door of the NCS 2006 Shelf ...

Страница 279: ... the nuts to a torque value of 11 5 in lb 1 3 N m to lock the cable Figure 145 Retention Feature and Ground Strap Cable Standard Door Cisco NCS 2000 Series Hardware Installation Guide 251 Installing the Cisco NCS 2006 Door and Other Modules NTP L4 Installing the Standard Door of the NCS 2006 Shelf ...

Страница 280: ...of the NCS 2006 shelf Purpose 2 Phillips Dynamometric screwdriver Tools Equipment NTP L2 Mounting the Brackets in ANSI Configuration on page 163 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Cisco NCS 2000 Series Hardwar...

Страница 281: ...und the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level The NCS 2006 shelf has an ESD plug input and is shipped with an ESD wrist strap The ESD plug input is located on the outside of the shelf on the left side It is labeled ESD on the top and bottom Always wear an ESD...

Страница 282: ...f 6 5 in lb 0 75 N m Step 2 Push the latches in the opposite direction Figure 147 Opening the Standard Door Cisco NCS 2000 Series Hardware Installation Guide 254 Installing the Cisco NCS 2006 Door and Other Modules DLP L12 Opening the Standard Door of the NCS 2006 Shelf ...

Страница 283: ...ting procedure NTP DLP L13 Removing the Standard Door of the NCS 2006 Shelf This task removes the standard door of the NCS 2006 shelf Purpose None Tools Equipment DLP L12 Opening the Standard Door of the NCS 2006 Shelf on page 253 Prerequisite Procedures Cisco NCS 2000 Series Hardware Installation Guide 255 Installing the Cisco NCS 2006 Door and Other Modules DLP L13 Removing the Standard Door of ...

Страница 284: ...round cable to the shelf Remove the nut Step 2 Remove the ground cable from the shelf see the figure below Figure 149 Removing the NCS 2006 Standard Door Cisco NCS 2000 Series Hardware Installation Guide 256 Installing the Cisco NCS 2006 Door and Other Modules DLP L13 Removing the Standard Door of the NCS 2006 Shelf ...

Страница 285: ...direction see the figure below Step 7 Remove the door from its hinges see the figure below Figure 150 Removing the NCS 2006 Standard Door Step 8 Return to your originating procedure NTP NTP L39 Install the Deep Front Panel of the NCS 2006 This procedure installs the deep front panel of the NCS Purpose Cisco NCS 2000 Series Hardware Installation Guide 257 Installing the Cisco NCS 2006 Door and Othe...

Страница 286: ... Installing Power and Ground to the NCS 2006 Shelf on page 200 NTP L11 Installing the Fan Tray Assembly in the NCS 2006 Shelf on page 296 NTP L13 Installing the Cable and Fiber Modules on page 222 NTP L14 Attaching Wires to Alarm Timing LAN and Craft Pin Connections on page 229 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Use the deep front panel wh...

Страница 287: ...en the nut on the shelf to a torque value of 11 5 in lb 1 3 N m c Route the other end of the ground strap cable outside the shelf at an angle of 180 degrees towards the left direction Figure 151 Inserting the Lug to the Shelf Cisco NCS 2000 Series Hardware Installation Guide 259 Installing the Cisco NCS 2006 Door and Other Modules NTP L39 Install the Deep Front Panel of the NCS 2006 ...

Страница 288: ...utwards using the plastic tabs see the figure below Figure 152 Loosening the deep front panel screws Cisco NCS 2000 Series Hardware Installation Guide 260 Installing the Cisco NCS 2006 Door and Other Modules NTP L39 Install the Deep Front Panel of the NCS 2006 ...

Страница 289: ... Step 4 Align the deep front panel with the shelf by performing the following sub steps at the same time a Align the right and left retention features of the deep front panel with the right and left notches present on the top of the shelf See the above figure Cisco NCS 2000 Series Hardware Installation Guide 261 Installing the Cisco NCS 2006 Door and Other Modules NTP L39 Install the Deep Front Pa...

Страница 290: ...nel with the shelf hinges See the figure below Figure 154 Align the Deep Front Panel Pins and Shelf Hinges Cisco NCS 2000 Series Hardware Installation Guide 262 Installing the Cisco NCS 2006 Door and Other Modules NTP L39 Install the Deep Front Panel of the NCS 2006 ...

Страница 291: ...ont panel aligned with the shelf Figure 155 Align the Deep Front Panel and Shelf Cisco NCS 2000 Series Hardware Installation Guide 263 Installing the Cisco NCS 2006 Door and Other Modules NTP L39 Install the Deep Front Panel of the NCS 2006 ...

Страница 292: ...helf notches and hinges See the figure below Verify the engagement by gently applying the pressure to the panel outwards Figure 156 Engage the Deep Front Panel and Shelf Cisco NCS 2000 Series Hardware Installation Guide 264 Installing the Cisco NCS 2006 Door and Other Modules NTP L39 Install the Deep Front Panel of the NCS 2006 ...

Страница 293: ...ect ground strap cable to the ground point Stop You have completed this procedure NTP L40 Remove the Deep Front Panel of the NCS 2006 Shelf This procedure removes the deep front panel of the NCS 2006 system Purpose 2 Phillips Dynamometric screwdriver Tools Equipment Cisco NCS 2000 Series Hardware Installation Guide 265 Installing the Cisco NCS 2006 Door and Other Modules NTP L40 Remove the Deep Fr...

Страница 294: ...and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level When the deep front panel is installed the total chassis depth is 12 9 inches The deep front panel extends from the rack by 1 8 inches Note Cisco NCS 2000 Series Hardware Installation Guide 266 Installing the Cisco NCS 2006 Door and Other Modules NTP L40 Remove...

Страница 295: ...connected to the exterior of the deep front panel Figure 158 Removing the end of the ground strap cable Cisco NCS 2000 Series Hardware Installation Guide 267 Installing the Cisco NCS 2006 Door and Other Modules NTP L40 Remove the Deep Front Panel of the NCS 2006 Shelf ...

Страница 296: ...e figure below to disengage the retention features and the pins from the shelf notches and hinges See the figure below Figure 159 Move the Deep Front Panel to Disengage Cisco NCS 2000 Series Hardware Installation Guide 268 Installing the Cisco NCS 2006 Door and Other Modules NTP L40 Remove the Deep Front Panel of the NCS 2006 Shelf ...

Страница 297: ...ing the deep front panel can damage the deep front panel shelf hinges other devices and cables placed below the NCS 2006 shelf Caution Step 5 Remove the ground strap cable from the shelf See the figure below a Loosen the ground nut on the shelf Cisco NCS 2000 Series Hardware Installation Guide 269 Installing the Cisco NCS 2006 Door and Other Modules NTP L40 Remove the Deep Front Panel of the NCS 2...

Страница 298: ...manages the inventory of the external shelf units It also handles the multishelf management connections and timing synchronizations The ECU module available for the NCS 2006 shelf is ECU PN NCS2006 ECU The following figure is an example of the ECU module label Figure 162 Connector Label for ECU Module The NCS 2006 ECU should not be used when the shelf is powered at 60V DC nominal input voltage Not...

Страница 299: ...TNC relay contact including alarm cut off ACO signal and digital I O D I O signals on the left side connector 1 SCSI with 26 poles for digital I O signals on the right side connector When no VOIP UDC port or a single VOIP UDC port is in use the NCS 2006 ECU supports 12 USB ports However when both VOIP UDC ports are in use the NCS 2006 ECU supports only 6 USB ports Note NCS 2006 ECU S ECU S is a ne...

Страница 300: ...oved from the NCS 2006 shelf When NCS 2006 is pre provisioned or plugged in without the ECU S unit by default CTC uses the ECU module with the 12 USB 2 0 ports Note The fiber shuffle unit or the NCS2K MF 6RU unit which can be used to interface 14 single slot passive optical modules can be connected to the NCS 2006 ECU S using the USB 3 0 port The MPO fan out unit or the NCS2K MF10 6RU unit which c...

Страница 301: ...f VoIP and UDC connections 1 SCSI with 26 poles for TNC relay contact including alarm cut off ACO signal and digital I O D I O signals on the left side connector 1 SCSI with 26 poles for digital I O signals on the right side connector NCS 2006 ECU60 S ECU60 S is a new type of ECU S introduced for the NCS 2006 when the shelf is powered at 60 VDC nominal input voltage The ECU60 S module available fo...

Страница 302: ... 0 port on the left of the faceplate is detected as B5 8 USB 2 0 connections 4 USB 2 0 on the left of the faceplate are detected as A1 A2 A3 A4 4 USB 2 0 ports on the right of the faceplate are detected as B1 B2 B3 B4 In releases prior to 10 5 2 these ports are detected as A5 A6 B1 B2 respectively 2 BITS OUT connections 2 subminiature version B SMB connectors for ETSI and 4 wire wrap pins for ANSI...

Страница 303: ... node controller Note See Table 6 2 and Table 6 3 for pin details of the alarm connectors ECU60 S does not support alarm connections Note Passive Unit Inventory Interfaces The passive unit inventory interfaces USB ports are used to retrieve inventory information from passive devices such as fiber trays FBG DCU patch panels passive multiplexer or demultiplexer and so on There are 12 USB ports on th...

Страница 304: ...port that is used to connect the NCS 2006 shelf to other NCS 2006 or NCS 2006 shelves that are a part of the multishelf configuration There are six MSM ports on the NCS 2006 ECU and ECU S modules three ports on the left side and three ports on the right side The MSM ports on the left side correspond to the TNC TNCE TSC TSCE card in Slot 1 and those on the right side correspond to the TNC TNCE TSC ...

Страница 305: ... Required As Needed Onsite Onsite Remote None Security Level The intra building port s of the equipment or subassembly is suitable for connection to intra building or unexposed wiring or cabling only The intra building port s of the equipment or subassembly MUST NOT metallically connect to interfaces that connect to the OSP or its wiring These interfaces are designed for use as intra building inte...

Страница 306: ...connect these interfaces metallically to OSP wiring Statement 7018 Warning Voltages that present a shock hazard may exist on Power over Ethernet PoE circuits if interconnections are made using uninsulated exposed metal contacts conductors or terminals Avoid using such interconnection methods unless the exposed metal parts are located within a restricted access location and users and service people...

Страница 307: ...e The following figure shows the ECU module installed in the NCS 2006 shelf Figure 167 NCS 2006 Shelf with ECU module Installed Cisco NCS 2000 Series Hardware Installation Guide 279 Installing the Cisco NCS 2006 Door and Other Modules NTP L8 Install the NCS 2006 ECU and ECU S Modules ...

Страница 308: ...ibed in NTP L8 Install the NCS 2006 ECU and ECU S Modules on page 277 Step 6 Power on the NCS2006 DC V03 power module as described in NTP L12 Installing Power and Ground to the NCS 2006 Shelf on page 200 Stop You have completed this procedure Power Modules The NCS 2006 system contains pluggable and redundant power modules for AC and DC power The AC and DC power modules cannot be used simultaneousl...

Страница 309: ...ds in a NCS 2006 shelf For the NCS2006 DC20 power module the power consumption of the NCS 2006 shelf including ancillaries controller cards and line cards is limited to 960 W A new line card will not boot up when it is installed in the NCS 2006 shelf if it causes the power consumption of the shelf to exceed 960 W The PWR CON LMT alarm is raised in the Alarms tab in CTC when the installation or pre...

Страница 310: ...y one power module can sustain the functioning of the entire NCS 2006 system In that case insert a power filler module in the empty slot NTP L9 Installing the Power Modules in the NCS 2006 Shelf This procedure installs the power modules in the NCS 2006 system Purpose 2 Phillips screwdriver Tools Equipment NTP L2 Mounting the Brackets in ANSI Configuration on page 163 NTP L5 Opening and Removing th...

Страница 311: ...006 AC or 15454 M6 AC2 power module in the NCS 2006 system Purpose 2 Phillips screwdriver Tools Equipment NTP L2 Mounting the Brackets in ANSI Configuration on page 163 NTP L5 Opening and Removing the Standard Door of the NCS 2006 Shelf on page 252 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for...

Страница 312: ...odules Procedure Step 1 Plug the AC power module completely into the chassis Step 2 Tighten the screw to a torque value of 4 in lb 0 45 N m to lock the power module in the chassis see the figure below Cisco NCS 2000 Series Hardware Installation Guide 284 Installing the Cisco NCS 2006 Door and Other Modules DLP L14 Installing the AC Power Module in the NCS 2006 Shelf ...

Страница 313: ... Power Modules Installed in the NCS 2006 Shelf Step 3 Return to your originating procedure NTP DLP L15 Installing the DC Power Module in the NCS 2006 Shelf This procedure installs the NCS2006 DC NCS2006 DC20 or NCS2006 DC40 DC power module in the NCS2006 system Purpose 2 Phillips Dynamometric screwdriver Tools Equipment Cisco NCS 2000 Series Hardware Installation Guide 285 Installing the Cisco NCS...

Страница 314: ...Required Required As Needed Onsite Onsite Remote None Security Level While changing the power modules from NCS2006 DC20 to NCS2006 DC and vice versa the NCS 2006 shelf can temporarily work with both NCS2006 DC and NCS2006 DC20 power modules installed However during regular operation the shelf must either have the NCS2006 DC or NCS2006 DC20 power module but not both Caution Cisco NCS 2000 Series Ha...

Страница 315: ...t A or Slot B or both see the figure below Figure 170 Installing the DC power module Cisco NCS 2000 Series Hardware Installation Guide 287 Installing the Cisco NCS 2006 Door and Other Modules DLP L15 Installing the DC Power Module in the NCS 2006 Shelf ...

Страница 316: ... NCS 2006 Shelf For redundant power supplies two DC power modules can be installed in Slot A and Slot B However only one power module can sustain the functioning of the entire NCS 2006 system In that case insert a power filler module in the empty slot Note Cisco NCS 2000 Series Hardware Installation Guide 288 Installing the Cisco NCS 2006 Door and Other Modules DLP L15 Installing the DC Power Modu...

Страница 317: ...06 ECU 60 can be installed Note DLP L16 Replacing NCS2006 DC With NCS2006 DC20 Power Module This procedure replaces the NCS2006 DC with NCS2006 DC20 power module Purpose 2 Phillips Dynamometric screwdriver Tools Equipment NTP L5 Opening and Removing the Standard Door of the NCS 2006 Shelf on page 252 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote Cisco NCS 2000 Series Har...

Страница 318: ...ull the NCS2006 DC power module clear from the NCS 2006 chassis Step 4 Install the NCS2006 DC20 power module as described in the DLP L15 Installing the DC Power Module in the NCS 2006 Shelf on page 285 Step 5 Install power on the NCS2006 DC20 power module as described in the NTP L12 Installing Power and Ground to the NCS 2006 Shelf on page 200 While replacing the power modules do not provision or ...

Страница 319: ... the NCS2006 DC or NCS2006 DC20 power module but not both Caution Always use the supplied ESD wristband when working with a powered NCS 2006 For detailed instructions on how to wear the ESD wristband see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Caution Procedure Step 1 Disconnect the power source and remove the power connections from the standby power module instal...

Страница 320: ...d PORT on the LCD unit are used to set parameters at the slot level and port level There are three alarm LEDs CRIT MAJ and MIN on the LCD unit that indicate whether a critical major or minor alarm is present anywhere on the NCS 2006 shelf The shelf controller card controls the conditions that result in triggering the LEDs The LEDs can be overwritten by the shelf controller card TNC TNCE TSC or TSC...

Страница 321: ...eries Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level If the LCD unit is removed from the shelf wait for at least 5 seconds before plugging it back into the shelf In the event the LCD display appears blank remove the unit from the shelf wait for at least 5 seconds and reinsert the unit into the shelf Note Cisco NCS 2000 Series Hardware Installation Guid...

Страница 322: ...Step 2 Push the LCD module into the chassis such that the backplane connector is completely engaged see the figure below Figure 173 Installing the LCD Module Cisco NCS 2000 Series Hardware Installation Guide 294 Installing the Cisco NCS 2006 Door and Other Modules NTP L10 Installing the LCD Module in the NCS 2006 Shelf ...

Страница 323: ...s OFF When the power line is connected and if there is no TNC TNCE TSC or TSCE card installed in the NCS2006 shelf then the LED is OFF A red LED indicates an alarm in the fan tray assembly A green LED indicates that the fan tray assembly is functioning the power line is connected and the power module is functioning properly The shelf controller card controls the conditions that result in triggerin...

Страница 324: ...u install a working fan tray NTP L11 Installing the Fan Tray Assembly in the NCS 2006 Shelf This procedure installs the NCS2006 FTA or NCS2006 FTA2 fan tray assembly in the NCS 2006 system Purpose Small slot head screwdriver Tools Equipment NTP L2 Mounting the Brackets in ANSI Configuration on page 163 NTP L5 Opening and Removing the Standard Door of the NCS 2006 Shelf on page 252 Connect the chas...

Страница 325: ...ly is removed from the shelf or when one fan is not working Note To install the fan tray assembly it is not necessary to move any of the fiber routing facilities Note Procedure Step 1 Insert the fan tray assembly inside the left slot fan tray slot of the NCS 2006 chassis see the figure below Figure 175 Installing the Fan Tray Assembly Cisco NCS 2000 Series Hardware Installation Guide 297 Installin...

Страница 326: ...side of the shelf The disposable filter is made up of a gray open cell polyurethane foam that is specially coated to provide fire and fungi resistance Spare filters should be kept in stock Inspection of the air filter must be performed as specified in your local site practices First inspection of the air filter should be performed six months after the system installation Air filters must be inspec...

Страница 327: ...iew This chapter includes these sections Mounting the Brackets on the NCS 2015 Shelf Mounting the Cisco NCS 2015 Shelf Connecting Power and Ground Connecting and Routing the Cables NCS 2015 Shelf Installation Acceptance Test Installing the Cisco NCS 2015 Door and Other Modules Installing and Configuring the Control Card Cisco NCS 2000 Series Hardware Installation Guide 299 ...

Страница 328: ...Cisco NCS 2000 Series Hardware Installation Guide 300 NCS 2015 Installation Overview NCS 2015 Installation Overview ...

Страница 329: ...ce or the rack must be bolted to the floor before you slide the unit out for servicing Failure to stabilize the rack can cause the rack to tip over Statement 1048 Warning This product requires short circuit overcurrent protection to be provided as part of the building installation Install only in accordance with national and local wiring regulations Statement 1045 Warning This product relies on th...

Страница 330: ...lizing devices install the stabilizers before mounting or servicing the unit in the rack Statement 1006 To prevent airflow restriction allow clearance around the ventilation openings to be at least 1 inch 25 4 mm Statement 1076 Warning To comply with EN50121 4 2006 Railway applications Electromagnetic compatibility a shielded cable must be used to connect to the EMS port This cable must be less th...

Страница 331: ...t DLP L62 Unpacking and Verifying the Shelf on page 20 DLP L63 Inspecting the Shelf on page 22 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Align the mounting bracket screw holes against the shelf screw holes Step 2 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 3 Repeat steps 1 and 2 for the mounting...

Страница 332: ...unting the Brackets on the NCS 2015 DC Shelf for a 19 inch 482 6 mm ANSI Configuration Screw 2 Mounting bracket in 19 inch position 1 Cisco NCS 2000 Series Hardware Installation Guide 304 Mounting the Brackets on the NCS 2015 Shelf NTP L48 Mounting Brackets on NCS 2015 Shelf for ANSI Rack Configuration ...

Страница 333: ...unting the Brackets on the NCS 2015 DC Shelf for a 23 inch 584 2 mm ANSI Configuration Screw 2 Mounting bracket in 23 inch position 1 Cisco NCS 2000 Series Hardware Installation Guide 305 Mounting the Brackets on the NCS 2015 Shelf NTP L48 Mounting Brackets on NCS 2015 Shelf for ANSI Rack Configuration ...

Страница 334: ...9 Mounting the Z Brackets on the NCS 2015 DC Shelf for a 23 inch 584 2 mm ANSI Configuration Screw 2 Z bracket in 23 inch position 1 Cisco NCS 2000 Series Hardware Installation Guide 306 Mounting the Brackets on the NCS 2015 Shelf NTP L48 Mounting Brackets on NCS 2015 Shelf for ANSI Rack Configuration ...

Страница 335: ...cedure NTP L49 Mounting Brackets on NCS 2015 Shelf for ETSI Rack Configuration This procedure helps in mounting the brackets on the NCS 2015 shelf for ETSI rack configuration The mounting brackets can be installed in the middle position of the chassis Purpose Cisco NCS 2000 Series Hardware Installation Guide 307 Mounting the Brackets on the NCS 2015 Shelf NTP L49 Mounting Brackets on NCS 2015 Shel...

Страница 336: ... DLP L62 Unpacking and Verifying the Shelf on page 20 DLP L63 Inspecting the Shelf on page 22 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 308 Mounting the Brackets on the NCS 2015 Shelf NTP L49 Mounting Brackets on NCS 2015 Shelf for ETSI Rack Configuration ...

Страница 337: ... value of 11 5 in lb 1 3 N m Step 4 Repeat steps 1 through 3 for the mounting bracket on the opposite side Figure 181 Mounting the Brackets on the NCS 2015 DC Shelf for ETSI Rack Configuration Screw 2 Mounting bracket 1 Stop You have completed this procedure Cisco NCS 2000 Series Hardware Installation Guide 309 Mounting the Brackets on the NCS 2015 Shelf NTP L49 Mounting Brackets on NCS 2015 Shelf...

Страница 338: ...Cisco NCS 2000 Series Hardware Installation Guide 310 Mounting the Brackets on the NCS 2015 Shelf NTP L49 Mounting Brackets on NCS 2015 Shelf for ETSI Rack Configuration ...

Страница 339: ...ng the NCS 2015 shelf When the shelf is mounted in the middle position it projects 4 5 inches 114 3 mm from the front of the ANSI rack and 4 0 inches 101 6 mm from the front of the ETSI rack The shelf mounts in both Electronic Industries Alliance EIA standard and Telcordia standard racks The shelf is a total of 17 5 inches 431 8 mm wide with no mounting ears attached The NCS 2015 shelf measures 24...

Страница 340: ...inch 482 6 mm ANSI rack configuration with brackets mounted in the middle position Figure 182 Cisco NCS 2015 DC Shelf Dimensions for a 19 inch ANSI Rack Configuration Cisco NCS 2000 Series Hardware Installation Guide 312 Mounting the Cisco NCS 2015 Shelf ANSI Rack Installation ...

Страница 341: ... shelf on a rack requires a minimum of 24 4 inches 619 76 mm of vertical rack space To ensure that the mounting is secure use eight mounting screws for each side of the shelf For an ANSI rack the brackets can be mounted in the middle position If the NCS 2015 shelf is fully loaded then two people should install it For ease of lifting it is recommended that the shelf be empty Cisco NCS 2000 Series H...

Страница 342: ...unted on a 600 x 300 mm 23 6 x 11 8 inch ETSI standard equipment rack In an ETSI rack the shelf can be mounted in the middle position The shelf projects 4 0 inches 101 6 mm from the front of the rack and is a total of 444 5 mm 17 5 inch wide with no mounting ears attached The NCS 2015 shelf measures 24 44 inches 620 776 mm high 17 67 inches 448 81 mm wide and 11 10 inches 281 94 mm deep You can in...

Страница 343: ...elf installed on a 600 x 300 mm 23 6 x 11 8 inch ETSI standard equipment rack Figure 184 Cisco NCS 2015 DC Shelf Dimensions for an ETSI Rack Configuration Cisco NCS 2000 Series Hardware Installation Guide 315 Mounting the Cisco NCS 2015 Shelf ETSI Rack Installation ...

Страница 344: ...e bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Caution Mounting a Single Shelf The NCS 2015 requires 24 4 inches 619 76 mm minimum of vertical rack space To ensure the mounting is secure use eight mounting screws for each side of the shelf If a shelf is the only unit in the rack it should be mounted at...

Страница 345: ...TP L47 Mounting NCS 2015 Shelf This procedure helps in mounting the NCS 2015 shelf In an ANSI and ETSI rack the chassis can be installed in the middle position Note Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver ETSI only 16 M6 x 20 mm pan head Phillips mounting screws ANSI only 16 12 24 x 0 50 inch pan head Phillips mounting screws Tools Equip...

Страница 346: ...he maximum recommended ambient temperature of 131 F 55 C Statement 1047 Warning Take care when connecting units to the supply circuit so that wiring is not overloaded Statement 1018 Warning To prevent bodily injury when mounting or servicing this unit in a rack you must take special precautions to ensure that the system remains stable The following guidelines are provided to ensure your safety War...

Страница 347: ...lf on a Rack One Person on page 319 DLP L73 Mounting NCS 2015 Shelf on a Rack Two People on page 322 DLP L74 Mounting Multiple NCS 2015 Shelves on a Rack on page 323 Stop You have completed this procedure DLP L72 Mounting NCS 2015 Shelf on a Rack One Person This task allows one person to mount the shelf on a rack Purpose 2 Phillips Dynamometric screwdriver ETSI 16 M6 x 20 mm pan head Phillips moun...

Страница 348: ...ing must not exceed 60 A For an AC power supply the fuse rating must not exceed 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes Step 2 Ensure that the shelf is mounted on the appropriate rack equipment 23 inches 584 2 mm or 19 inches 482 6 mm for ANSI racks 600 x 300 mm 23 ...

Страница 349: ...ake sure that the space in front of the air flow vents are free of cables fibers and mechanical fixtures for fiber and cable management Note Step 4 Align the screw holes on the mounting brackets with the mounting holes in the rack Step 5 Using the Phillips Dynamometric screwdriver install one mounting screw in each side of the assembly Tighten the screw to a torque value of 22 in lb 2 5 N m Step 6...

Страница 350: ...stall one as per the instructions of the manufacturer For a DC power supply the fuse rating must not exceed 60 A For an AC power supply the fuse rating must not exceed 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes Step 2 Ensure that the shelf is mounted on the appropriate...

Страница 351: ...15 Shelf for ANSI Rack Configuration on page 303 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level A standard rack can hold three NCS 2015 shelves When mounting a shelf in a partially filled rack load the rack from the bottom to the top with the heaviest component at the bottom of the rack If the rack is provided with stabilizing devices install the stab...

Страница 352: ...S 2015 Shelf on a Rack One Person on page 319 or DLP L73 Mounting NCS 2015 Shelf on a Rack Two People on page 322 Diagram 1 of the figure below shows multiple NCS 2015 DC shelf assemblies mounted on the ANSI rack Diagram 2 of the figure below shows multiple NCS 2015 DC shelf assemblies mounted on the ETSI rack Figure 187 Multiple NCS 2015 DC Shelves Mounted on the Rack Cisco NCS 2000 Series Hardwa...

Страница 353: ...alarm panel 3 Step 3 Repeat 2 for every shelf you need to install Step 4 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 325 Mounting the Cisco NCS 2015 Shelf DLP L74 Mounting Multiple NCS 2015 Shelves on a Rack ...

Страница 354: ...Cisco NCS 2000 Series Hardware Installation Guide 326 Mounting the Cisco NCS 2015 Shelf DLP L74 Mounting Multiple NCS 2015 Shelves on a Rack ...

Страница 355: ...e ground conductor or operate the equipment in the absence of a suitably installed ground conductor Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available Statement 1024 Warning This unit is intended for installation in restricted access areas A restricted access area can be accessed only through the use of a special tool...

Страница 356: ... 20A The overcurrent or short circuit protection must be in accordance with local and national electrical codes The voltage rating value for AC power ranges between 200 VAC to 240 VAC depending on the standards of various countries This product is intended for use on the TN and TT power systems For redundant DC power feeds install four DC power modules and use eight power cables and one ground cab...

Страница 357: ... the 4 AWG cable The grounding lug must be assembled on the chassis with two screws and washers See the figure below Figure 188 Ground Lug on the NCS 2015 DC Shelf Washer 2 Ground lug 1 Screw 3 Cisco NCS 2000 Series Hardware Installation Guide 329 Connecting Power and Ground Power and Ground ...

Страница 358: ... shown in the figures below Figure 189 Rating Label for NCS 2015 AC Chassis Figure 190 Rating Label for NCS 2015 DC Chassis Cisco NCS 2000 Series Hardware Installation Guide 330 Connecting Power and Ground Power and Ground ...

Страница 359: ...istribution in the NCS 2015 DC shelf It is recommended to use the 23 inch rack Figure 191 Cabling for NCS 2015 DC Shelf Figure 192 Cabling for NCS 2015 DC Shelf Cisco NCS 2000 Series Hardware Installation Guide 331 Connecting Power and Ground Cabling Guidelines for NCS 2015 DC Shelf ...

Страница 360: ...power tray Second route the P2B cable under the P1B cable Third route the P3B cable under the P2B cable Fourth route the P4B cable under the P3B cable Fifth route the P1A cable to the right of the chassis against the top of the power tray Sixth route the P2A cable under the P1A cable Cisco NCS 2000 Series Hardware Installation Guide 332 Connecting Power and Ground Cabling Guidelines for NCS 2015 D...

Страница 361: ... to the right of the chassis against the top of the power tray Sixth route the P2B cable under the P1B cable Seventh route the P3B cable under the P2B cable Eighth route the P4B cable under the P3B cable This arrangement allows the management of cables within the boundaries of the chassis Note When transitioning to the rack ensure that you maintain a two inch bend radius Note NTP L57 Installing Po...

Страница 362: ...tructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level To ensure safety of personnel and equipment do not connect any power cables into the power module until the module is completely installed into the chassis Statement 389 Warning To reduce th...

Страница 363: ... with upturned lugs These terminations should be the appropriate size for the wires and should clamp both the insulation and conductor Statement 1002 Warning Before performing any of the following procedures ensure that power is removed from the DC circuit Statement 1003 Warning Before working on a chassis or working near power supplies unplug the power cord on AC units Statement 246 Warning This ...

Страница 364: ... must not exceed 60 A For an AC power supply the fuse rating must not exceed 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes Step 2 Connect the office ground to the NCS 2015 shelf For detailed instructions on grounding see the Electrostatic Discharge and Grounding Guide for...

Страница 365: ...g This equipment shall be connected to AC mains provided with a surge protective device SPD at the service equipment complying with NFPA 70 the National Electrical Code NEC Statement 7012 Warning The NCS 2015 relies on the protective devices in the building installation to protect against short circuit overcurrent and ground faults Ensure that the protective devices are properly rated and comply w...

Страница 366: ...er you must reset the NCS 2015 clock After powering down the date defaults to January 1 1970 00 04 15 To reset the clock see the NTP G24 Set Up Name Date Time and Contact Information procedure in the Managing the Shelf chapter of the Cisco NCS 2000 Series Control Card and Node Configuration Guide If you use the TNCS or TNCS O cards the system clock runs for up to three hours In this case no action...

Страница 367: ...Attach the AC power cable to the cable connector in the power input panel See the figure below Figure 195 Connecting Office Power AC Power Modules AC power cables 1 Cisco NCS 2000 Series Hardware Installation Guide 339 Connecting Power and Ground DLP L81 Connecting Office Power AC to the NCS 2015 Shelf ...

Страница 368: ... for AC power ranges between 100 VAC to 240 VAC depending on the standards of various countries Note Turn on the power using the power switch on the NCS 2015 shelf after installing the power cables Note Step 5 Return to your originating procedure NTP Table 18 PIDs for AC Power Cables PID Cable CRS AC CAB NA North America CRS AC CAB AU Australia Cisco NCS 2000 Series Hardware Installation Guide 340...

Страница 369: ...rque wrench 1 4 socket wrench Sockets Manufacturer s die for power lug Fuse panel Power cable from fuse and alarm panel to assembly 6 AWG copper conductors 194 degrees F 90 degrees C Ground cable 4 AWG stranded Listed pressure dual holes lugs suitable for 6 AWG copper conductors Tools Equipment None Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Cisco ...

Страница 370: ...evices are properly rated and comply with national and local codes Caution If the system loses power or both the TNCS or TNCS O cards are reset and the system is not provisioned to get the time from a Network Time Protocol Simple Network Time Protocol NTP SNTP server you must reset the NCS 2015 clock After powering down the date defaults to January 1 1970 00 04 15 To reset the clock see the NTP G2...

Страница 371: ...nsulation from all power cables that you will use Step 5 Crimp the lugs onto the ends of all the power distribution cables using the manufacturer s suggested die for the lug Step 6 Remove the terminal block protective covers from the power distribution lugs Figure 197 Connecting Office Power DC Power Modules Power lug 2 Terminal block 1 Nuts 4 Lock washers 3 Cisco NCS 2000 Series Hardware Installa...

Страница 372: ...wer and returns on the NCS 2015 shelf Purpose Voltmeter Tools Equipment DLP L79 Connecting Office Power DC to the NCS 2015 Shelf on page 341 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Do not apply power to the shelf until you complete all the installation steps Caution To ensure safety of personnel and equipment do not connect any power cables into...

Страница 373: ...connection red cable Verify that it reads between 40 5 VDC and 72 0 VDC Then place the red test lead of the voltmeter to the RET1 A side return ground black cable and verify that no voltage is present For nominal steady state voltage of 48 VDC the operating voltage range for the chassis is 40 5 VDC minimum to 57 6 VDC maximum For nominal steady state voltage of 60 VDC the operating voltage range f...

Страница 374: ...witch 2 Cover on the power switch 1 Step 6 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 346 Connecting Power and Ground DLP L80 Turning On and Verifying DC Office Power on the NCS 2015 Shelf ...

Страница 375: ...s Because the NCS 2015 shelf is designed to be compliant with ETSI 600x300 standards all wiring and cable connections are available on the front side Default Module The NCS 2015 chassis is shipped with the fiber module installed If you need to use CAT5 cables instead of optical fibers replace the fiber module with the cable module Fiber Module The fiber module can hold 160 fibers per exit point Th...

Страница 376: ...m the lower right side See the figure below Figure 199 Cable and Fiber Routing in NCS 2015 DC Shelf NTP L55 Routing and Locking Cable and Fiber Modules TThis procedure routes and locks the cables on the NCS 2015 system Purpose 1 Phillips cross head PH screwdriver Tools Equipment None Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series...

Страница 377: ... to close the front door Figure 200 ECU module Cable Routing in NCS 2015 DC Shelf Step 2 Route the optical cables from the line cards through the cable module as shown in the figure above Stop You have completed this procedure Cisco NCS 2000 Series Hardware Installation Guide 349 Connecting and Routing the Cables NTP L55 Routing and Locking Cable and Fiber Modules ...

Страница 378: ...tatic Discharge and Grounding Guide for Cisco NCS 2000 Series Caution Procedure Step 1 Complete DLP L76 Installing Alarm Wires in NCS 2015 on page 350 if you are provisioning external alarms Step 2 Complete DLP L77 Installing Timing Wires on NCS 2015 on page 352 if you are provisioning external timing Step 3 Complete DLP L78 Installing LAN Wires in NCS 2015 on page 356 to create an external LAN co...

Страница 379: ... Step 1 Connect one end of the SCSI cable to the input alarms or input output alarms and the other end to the alarm source See the figure below These alarms are generic signals that the operator assigns to a definite wire color and name through the Craft Terminal Note Cisco NCS 2000 Series Hardware Installation Guide 351 Connecting and Routing the Cables DLP L76 Installing Alarm Wires in NCS 2015 ...

Страница 380: ...ght side see the figures below Step 4 Return to your originating procedure NTP Figure 201 Installing the Alarm Cable Left and Right Exit Screws 2 Alarm cable 1 DLP L77 Installing Timing Wires on NCS 2015 This task installs the timing cables on the power input panel Purpose Cisco NCS 2000 Series Hardware Installation Guide 352 Connecting and Routing the Cables DLP L77 Installing Timing Wires on NCS...

Страница 381: ... pair T1 type ETSI 75 ohm coaxial cable with a DIN 1 0 2 3 miniature coaxial connector Tools Equipment None Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 353 Connecting and Routing the Cables DLP L77 Installing Timing Wires on NCS 2015 ...

Страница 382: ...he power input panel BITS 1 or BITS 2 In Out See the figure below Figure 202 Timing Connectors on the Power Input Panel Cisco NCS 2000 Series Hardware Installation Guide 354 Connecting and Routing the Cables DLP L77 Installing Timing Wires on NCS 2015 ...

Страница 383: ...nd the other end to the external source of the timing Change the timing input to high impedance lesser or greater than 3 ohms using a jumper on the power input panel To change the top timing input remove the P1 jumper of the BITS 1 and to change the bottom timing input remove the P2 Jumper of the BITS 2 Cisco NCS 2000 Series Hardware Installation Guide 355 Connecting and Routing the Cables DLP L77...

Страница 384: ...ovisioning timing references Step 5 Secure the wire wrap cables on either side with a tie wrap Step 6 Return to your originating procedure NTP DLP L78 Installing LAN Wires in NCS 2015 This task installs LAN wires on the ECU module of the NCS 2015 Purpose Cisco NCS 2000 Series Hardware Installation Guide 356 Connecting and Routing the Cables DLP L78 Installing LAN Wires in NCS 2015 ...

Страница 385: ...ugh the ECU module cable exit area If the TNCS card fails the LAN connection is not lost during the TNCS card switch over If the ECU module is absent you can connect a CAT 5 Ethernet cable to the LAN port on the TNCS card to create an external LAN connection You can use the same procedure to connect Multishelf Management ports of several chassis in MSM configurations Note To avoid duplex mismatch ...

Страница 386: ...Cisco NCS 2000 Series Hardware Installation Guide 358 Connecting and Routing the Cables DLP L78 Installing LAN Wires in NCS 2015 ...

Страница 387: ...5 Shelf Installation Acceptance Test Use this procedure to perform a shelf installation acceptance test for the NCS 2015 shelf Purpose Voltmeter Tools Equipment None Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 If you installed an NCS 2015 shelf complete the table below by verifying that each applicable procedure was completed Cisco ...

Страница 388: ...g the Power Modules in NCS 2015 Shelf on page 388 NTP L57 Installing Power and Ground to the NCS 2015 Shelf on page 333 NTP L54 Installing Fan Tray Assembly in NCS 2015 Shelf on page 393 DLP L62 Installing the TNC TNCE TSC TSCE TNCS or TNCS O Card on page 400 NTP L50 Installing Standard Door of NCS 2015 Shelf on page 366 Step 2 Complete the DLP L63 Inspecting the Shelf on page 22 Step 3 Continue w...

Страница 389: ... NTP L53 Installing the Power Modules in NCS 2015 Shelf page 388 LCD Unit page 392 Fan Tray Assembly page 392 NTP L54 Installing Fan Tray Assembly in NCS 2015 Shelf page 393 Air Filter page 398 Front Door The front door of NCS 2015 provides access to the shelf fiber routing tray fan tray assembly and LCD screen There are two types of front doors that act as protective panels standard door and deep...

Страница 390: ... 2 Phillips Dynamometric screwdriver Tools Equipment None Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level The standard fiber tray is included in the standard door PID and the extended fiber tray is included in the deep door PID Note Cisco NCS 2000 Series Hardware Installation Guide 362 Installing the Cisco NCS 2015 Door and Other Modules NTP L67 Instal...

Страница 391: ...w Step 3 Insert the M3 x 8mm screws two screws on the bottom of the fiber tray and tighten them to a torque value of 11 5 in lb 1 3 N m See figures below Figure 206 Installing the Standard Fiber Tray M3 x8 mm screws 2 M3 x10 mm screws 1 Standard fiber tray 3 Cisco NCS 2000 Series Hardware Installation Guide 363 Installing the Cisco NCS 2015 Door and Other Modules NTP L67 Installing Fiber Tray of N...

Страница 392: ...ended Fiber Tray M3 x8 mm screws 2 M3 x10 mm screws 1 Extended fiber tray 3 Cisco NCS 2000 Series Hardware Installation Guide 364 Installing the Cisco NCS 2015 Door and Other Modules NTP L67 Installing Fiber Tray of NCS 2015 Shelf ...

Страница 393: ...n the figures below Figure 208 Installed Standard Fiber Tray Standard fiber tray 1 Cisco NCS 2000 Series Hardware Installation Guide 365 Installing the Cisco NCS 2015 Door and Other Modules NTP L67 Installing Fiber Tray of NCS 2015 Shelf ...

Страница 394: ...ling Standard Door of NCS 2015 Shelf This procedure installs the standard door of the NCS 2015 shelf Purpose 2 Phillips Dynamometric screwdriver Tools Equipment Cisco NCS 2000 Series Hardware Installation Guide 366 Installing the Cisco NCS 2015 Door and Other Modules NTP L50 Installing Standard Door of NCS 2015 Shelf ...

Страница 395: ... Power and Ground to the NCS 2015 Shelf on page 333 NTP L54 Installing Fan Tray Assembly in NCS 2015 Shelf on page 393 NTP L67 Installing Fiber Tray of NCS 2015 Shelf on page 362 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Pull the top hinge pin down on the standard door The bottom hinge pin is fixed Note Cisco NCS 2000 Series Hard...

Страница 396: ...gure 210 Installing the Standard Door of NCS 2015 DC Shelf Hinge pin 2 Standard door 1 Align door hinge with the chassis hinge 3 Cisco NCS 2000 Series Hardware Installation Guide 368 Installing the Cisco NCS 2015 Door and Other Modules NTP L50 Installing Standard Door of NCS 2015 Shelf ...

Страница 397: ...nge and move the top hinge pin in the upward direction see the figure below Figure 211 Hinge Pins Cisco NCS 2000 Series Hardware Installation Guide 369 Installing the Cisco NCS 2015 Door and Other Modules NTP L50 Installing Standard Door of NCS 2015 Shelf ...

Страница 398: ...Cisco NCS 2000 Series Hardware Installation Guide 370 Installing the Cisco NCS 2015 Door and Other Modules NTP L50 Installing Standard Door of NCS 2015 Shelf ...

Страница 399: ...und strap cable 1 Step 4 Swing the door closed and turn the knob to lock To lock the door it is mandatory for the ECU module to be installed and secured with captive screws Note Cisco NCS 2000 Series Hardware Installation Guide 371 Installing the Cisco NCS 2015 Door and Other Modules NTP L50 Installing Standard Door of NCS 2015 Shelf ...

Страница 400: ...ompleted this procedure NTP L61 Installing Deep Door of NCS 2015 Shelf This procedure installs the deep door of the NCS 2015 shelf Purpose 2 Phillips Dynamometric screwdriver 10 M3 x 10 mm pan head screws One M3 x 8 mm pan head screw One M3 x 6 mm pan head screw Tools Equipment Cisco NCS 2000 Series Hardware Installation Guide 372 Installing the Cisco NCS 2015 Door and Other Modules NTP L61 Instal...

Страница 401: ...ll NCS 2015 ECU Module on page 384 NTP L57 Installing Power and Ground to the NCS 2015 Shelf on page 333 NTP L54 Installing Fan Tray Assembly in NCS 2015 Shelf on page 393 NTP L67 Installing Fiber Tray of NCS 2015 Shelf on page 362 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Cisco NCS 2000 Series Hardware Installation Guide 373 Installing the Cisco...

Страница 402: ...fety washer on the front bottom of the deep door bracket and fasten it with a M3 x 8 mm screw See the figures below Step 4 Repeat steps 1 and 2 for the deep door bracket on the opposite side See the figures below Figure 214 Installing the Deep Door Bracket of NCS 2015 DC Shelf M3 x 8 mm screw 2 Deep door bracket 1 M3 x 10 mm screw 4 Safety washer 3 Cisco NCS 2000 Series Hardware Installation Guide...

Страница 403: ... the figures below The bottom hinge pin is fixed Note Step 6 Align the deep door hinges with the bracket hinges See the figures below Step 7 Slide the bottom hinge pin into the bracket hinge and move the top hinge pin in the upward direction Cisco NCS 2000 Series Hardware Installation Guide 375 Installing the Cisco NCS 2015 Door and Other Modules NTP L61 Installing Deep Door of NCS 2015 Shelf ...

Страница 404: ...low Note Figure 216 Installing the Deep Door and Ground Strap Cable to the NCS 2015 DC Shelf M3 x 6 mm screw 2 Deep door 1 Cisco NCS 2000 Series Hardware Installation Guide 376 Installing the Cisco NCS 2015 Door and Other Modules NTP L61 Installing Deep Door of NCS 2015 Shelf ...

Страница 405: ...or and Ground Strap Cable to the NCS 2015 AC Shelf M3 x 6 mm screw 2 Deep door 1 Cisco NCS 2000 Series Hardware Installation Guide 377 Installing the Cisco NCS 2015 Door and Other Modules NTP L61 Installing Deep Door of NCS 2015 Shelf ...

Страница 406: ...t on the deep door bracket using a M3 x 6 mm screw See the figure below Figure 218 Ground Strap Cable Ground strap cable 1 Cisco NCS 2000 Series Hardware Installation Guide 378 Installing the Cisco NCS 2015 Door and Other Modules NTP L61 Installing Deep Door of NCS 2015 Shelf ...

Страница 407: ... to lock See the figures below Figure 219 Installed Deep Door in NCS 2015 DC Shelf Deep door 1 Cisco NCS 2000 Series Hardware Installation Guide 379 Installing the Cisco NCS 2015 Door and Other Modules NTP L61 Installing Deep Door of NCS 2015 Shelf ...

Страница 408: ...oor in NCS 2015 AC Shelf Deep door 1 Stop You have completed this procedure Cisco NCS 2000 Series Hardware Installation Guide 380 Installing the Cisco NCS 2015 Door and Other Modules NTP L61 Installing Deep Door of NCS 2015 Shelf ...

Страница 409: ...n the outside of the shelf on the right side It is labeled ESD on the top and bottom Always wear an ESD wrist strap and connect the strap to the ESD plug when working on the NCS shelf For detailed instructions on how to wear the ESD wristband see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Note Procedure Step 1 Turn the knob to unlock the door Step 2 Swing the door op...

Страница 410: ...ns two LEDs that indicate the link and activity status of the optical EMS SFP port Table 20 ECU LED Status Indicator Lights Description Color LED Name The LED is on when there is a link connection otherwise the LED is off Green Link Speed The LED is flashing when there is activity on the link otherwise the LED is off Yellow Activity The following figure shows the NCS 2015 ECU connectors Figure 221...

Страница 411: ...and the ECU card view in CTC remain as they are even though the ECU has been removed from the NCS 2015 shelf The ECU cannot be deleted in CTC The Fiber Shuffle or the CDC fan out unit can be connected to the NCS 2015 ECU using the USB 3 0 port Passive Unit Inventory Interfaces The passive unit inventory interfaces USB ports are used to retrieve inventory information from passive devices such as fi...

Страница 412: ... 303 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level The intra building port s of the equipment or subassembly is suitable for connection to intra building or unexposed wiring or ca...

Страница 413: ...s that connect to the OSP or its wiring These interfaces are designed for use as intra building interfaces only Type 2 or Type 4 ports as described in GR 1089 CORE Issue 5 and require isolation from the exposed OSP cabling The addition of Primary Protectors is not sufficient protection in order to connect these interfaces metallically to OSP wiring Statement 7018 Warning Voltages that present a sh...

Страница 414: ...and the faceplate of the NCS 2015 ECU module aligns with the edge of the chassis side wall Step 3 Tighten the captive screw to a torque value of 4 in lb 0 45 N m Figure 222 Installing the NCS 2015 ECU Module Stop You have completed this procedure Cisco NCS 2000 Series Hardware Installation Guide 386 Installing the Cisco NCS 2015 Door and Other Modules NTP L52 Install NCS 2015 ECU Module ...

Страница 415: ...The output voltage is on Blinking The power module is in a power limit or over current condition Off The output voltage is off Green Output OK On An internal fault is detected within the power module Off No internal faults detected on the power module Red Fault AC Power Modules The NCS 2015 system is powered by AC power modules with 1 0 1 1 2 0 and 2 2 redundancy The supported AC power module on t...

Страница 416: ...ed by the controller card and displayed in CTC in the Provisioning Power Monitor tab Note Power Filler Module For redundant power supplies four AC or DC power modules can be installed in the NCS 2015 shelf However only one power module can sustain the functioning of the entire NCS 2015 system You can install power filler modules in the empty slots NTP L53 Installing the Power Modules in NCS 2015 S...

Страница 417: ...L57 Installing Power and Ground to the NCS 2015 Shelf on page 333 Stop You have completed this procedure DLP L82 Installing AC Power Module in NCS 2015 Shelf This procedure installs the NCS4K AC PSU power module in the NCS 2015 shelf Purpose 2 Phillips Dynamometric screwdriver Tools Equipment none Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Cisco NC...

Страница 418: ...t the power module slide it into the power slot See figure above Step 3 Secure the power module into the power tray using the snap hook Step 4 Repeat Steps 1 through 3 for the other AC power modules Step 5 Return to your originating procedure NTP Cisco NCS 2000 Series Hardware Installation Guide 390 Installing the Cisco NCS 2015 Door and Other Modules DLP L82 Installing AC Power Module in NCS 2015...

Страница 419: ...ne Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Remove the filler caps from the slots where you want to install the power modules Figure 224 Installing the DC power module Cisco NCS 2000 Series Hardware Installation Guide 391 Installing the Cisco NCS 2015 Door and Other Modules DLP L75 Installing DC Power Module in NCS 2015 Shelf ...

Страница 420: ...15 shelf then the LED is OFF A red LED indicates an alarm in the fan tray assembly A green LED indicates that the fan tray assembly is functioning the power line is connected and the power module is functioning properly The shelf controller card controls the conditions that result in triggering the LEDs The LEDs can be overwritten by the shelf controller card TNCS in all the three states OFF red g...

Страница 421: ...f for ANSI Rack Configuration on page 303 Connect the chassis to the office ground For detailed instructions on how to ground the chassis refer to the Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Do not operate an NCS 2015 chassis without the fan tray for more than two minutes Caut...

Страница 422: ...Caution Error messages appear on the TNCS TNCS O card the fan tray LED and in the Cisco Transport Controller CTC when the fan tray assembly is removed from the shelf or when a fan is not working Note Cisco NCS 2000 Series Hardware Installation Guide 394 Installing the Cisco NCS 2015 Door and Other Modules NTP L54 Installing Fan Tray Assembly in NCS 2015 Shelf ...

Страница 423: ... move any of the fiber routing facilities Note Figure 225 Shock Hazard Label NCS 2015 AC Shelf Cisco NCS 2000 Series Hardware Installation Guide 395 Installing the Cisco NCS 2015 Door and Other Modules NTP L54 Installing Fan Tray Assembly in NCS 2015 Shelf ...

Страница 424: ... Slide the fan tray into the chassis slot see the figure below Figure 226 Installing the Fan Tray Assembly in NCS 2015 DC Shelf Fan tray guide and lock pin 2 Fan tray slot 1 Cisco NCS 2000 Series Hardware Installation Guide 396 Installing the Cisco NCS 2015 Door and Other Modules NTP L54 Installing Fan Tray Assembly in NCS 2015 Shelf ...

Страница 425: ...handle 2 Fan tray 1 Step 6 To verify that the tray has plugged into the assembly check the fan tray and listen to determine if the fans are running When the power line is connected a green LED indicates that the fan tray assembly is functioning If power has not yet been turned on verify that the fan tray is seated and secured with the captive screws Stop You have completed this procedure Cisco NCS...

Страница 426: ...ter must be performed as specified in your local site practices First inspection of the air filter should be performed six months after the system installation Air filters must be inspected every quarter after the initial six month inspection If they are dirty or clogged with dust they must be replaced with a new air filter Do not operate an NCS 2015 without the mandatory air filter Caution Cisco ...

Страница 427: ...TSC TSCE TNCS or TNCS O Card This procedure describes how to install and configure the TNC TNCE TSC TSCE TNCS or TNCS O card Purpose Redundant TNC TNCE TSC TSCE TNCS TNCS O cards on Cisco NCS 2006 shelf required Stand alone TNC TNCE TSC TSCE card on Cisco NCS 2002 shelf required Redundant TNCS TNCS O cards on the Cisco NCS 2015 shelf required Tools Equipment None Prerequisite Procedures Required R...

Страница 428: ...e DLP L64 Configuring UDC and VoIP for the TNC TNCE TNCS and TNCS O Cards on page 405 Stop You have completed this procedure DLP L62 Installing the TNC TNCE TSC TSCE TNCS or TNCS O Card This task installs redundant TNC TNCE TSC TSCE TNCS TNCS O cards on the NCS 2006 shelf a stand alone TNC TNCE TSC TSCE card on the NCS 2002 shelf and redundant TNCS TNCS O cards on the NCS 2015 shelf Install and in...

Страница 429: ...lots 1 and 8 for redundancy On the NCS 2002 shelf install the stand alone TNC TNCE TSC TSCE card in slot 1 On the NCS 2015 shelf install the TNCS TNCS O cards in slots 1 and 17 for redundancy Note You cannot insert the TNC TNCE TSC TSCE TNCS TNCS O cards in other slots due to mechanical constraints To identify the card slot match the symbol placed on the lower side of the card front panel with the...

Страница 430: ...IN REM SYNC and ACO LEDs blink once and turn off for about 10 seconds ACT STBY LED blinks for about 1 second All the LEDs including the CRIT MAJ MIN REM SYNC and ACO LEDs turn off for about 10 seconds The ACT STBY ACO and PWR LEDs turn on The boot up process is complete when the PWR LEDs turn green and the amber ACT STBY remains on The ACT STBY LED turns green if this is the first TNC TNCE TSC TSC...

Страница 431: ...are or remove the TNC TNCE TSC TSCE TNCS TNCS O card and install a replacement card Refer to the release specific software upgrade document to replace the software Step 8 NCS 2006 shelf only Repeat Steps 1 through 7 for the redundant TNC TNCE TSC TSCE TNCS TNCS O card Step 9 NCS 2015 shelf only Repeat Steps 1 through 7 for the redundant TNCS TNCS O card If you install a standby TNC TNCE TSC TSCE T...

Страница 432: ...complete the following PPM Choose 1 or 2 from the PPM drop down list PPM Type Displays the PPM associated with the chosen PPM in the above step Step 5 Click OK The newly created PPM appears in the Pluggable Port Modules area The row in the Pluggable Port Modules area becomes white when the PPM is inserted and the Actual Equipment Type column lists the name of PPM Step 6 In the Pluggable Ports area...

Страница 433: ...NCS O card support UDC VoIP configuration You can configure UDC or VoIP on the SFP ports present on the TNC TNCE and TNCS cards The TNC TNCE and TNCS cards support the UDC VoIP configuration only when OSC is provisioned on the SFP ports Note If two shelves are connected through the fiber and if the TNC and TNCE cards in one shelf has UDC configuration the TNC and TNCE cards in the other shelf must...

Страница 434: ...rd fillers 15454 M FILLER These filler cards operate in slot 2 and 3 in NCS 2002 slots 2 through 7 in NCS 2006 and slots 2 through 16 in NCS 2015 These card fillers do not have card level LED indicators The following figure shows the faceplate of line card filler Figure 229 Line Card Filler Faceplate Timing and Control Card fillers 15454 M T FILLER These filler cards are for control cards and oper...

Страница 435: ...r a Multishelf Node page 413 NTP L64 Connect the ONS 15454 Node Controller to an MS ISC 100T Card page 415 NTP L65 Configure the MS ISC 100T Card for a ONS 15454 Multishelf Node for Non Default Public and Private VLAN IDs page 417 Shelf Voltage and Temperature page 438 Cooling Profile page 438 NTP L15ConnectingtheNCS2006MultishelfNodeandtheNCS 2006 Subtending Shelves Use this procedure to connect ...

Страница 436: ...helf Step 2 Using a cross over CAT 5 LAN cable a Plug one connector into the MSM port that corresponds to the TNC TNCE TSC TSCE TNCS TNCS O card in Slot 8 of the NCS 2006 shelf used as the node controller b Plug the other connector into the MSM port that corresponds to the TNC TNCE TSC TSCE TNCS TNCS O card in Slot 8 of the NCS 2006 shelf used as subtending shelf Step 3 Repeat Steps 1 and 2 to con...

Страница 437: ...ponds to the TNC TNCE TSC TSCE TNCS TNCS O card in Slot 1 of the NCS 2006 shelf used as subtending shelf When connecting two shelves using the cross over cables it is possible to have shelves not having controller cards in same slots Use corresponding MSM ports according to the controller card slots Note Step 2 Using a cross over CAT 5 LAN cable a Plug one connector to any one of the remaining MSM...

Страница 438: ... the system mode can be changed from ANSI SONET to ETSI SDH or vice versa Changing the system mode removes the provisioned data and the system reverts to the default configuration This is available on the single controller and dual controller cards The node can be in a standalone or multishelf configuration The system mode cannot be changed under the following conditions Cisco NCS 2000 Series Hard...

Страница 439: ...he ANSI option is displayed On the right hand side of the LCD display the Port button the ETSI option is displayed Step 5 Select the required mode either by pressing the Slot or Port button If the user by mistake chooses the current mode a relevant error message is displayed Step 6 On successful mode change the LCD display reads Changing mode TNC may reset Step 7 After successful mode change the c...

Страница 440: ...dures As needed Required As Needed Onsite Onsite Remote None Security Level SFP modules are Class I laser products Statement 1008 Warning Because invisible laser radiation may be emitted from the aperture of the port when no cable is connected avoid exposure to laser radiation and do not stare into open apertures Statement 70 Warning Ultimate disposal of this product should be handled according to...

Страница 441: ...tion For more information about the Catalyst 3560 refer to the Catalyst 3560 product documentation Purpose None Tools Equipment None Prerequisite Procedures Required Required As Needed Onsite or remote Onsite Remote Superuser Security Level When Cisco Catalysts are used in a multishelf node configuration the Cisco Catalysts can be used for other applications as long as they do not interfere with t...

Страница 442: ...4 Enter the following interface commands Example Switch config interface GigabitEthernet0 1 Switch config no ip address Switch config ip http server Switch config interface GigabitEthernet0 2 Switch config no ip address Switch config ip http server Switch config interface Vlan 1 Switch config no ip address Switch config no ip route cache Switch config ip http server Step 5 Enter the following comm...

Страница 443: ...MS ISC 100T Card Use this procedure to connect a ONS 15454 node controller to two MS ISC 100T cards Purpose 5 9 in 0 15 m CAT 5 LAN cable 2 19 69 in 0 5 m CAT 5 LAN cable 1 84 in 2 13 m EAP cables 2 Tools Equipment Cisco NCS 2000 Series Hardware Installation Guide 415 Multishelf Management NTP L64 Connect the ONS 15454 Node Controller to an MS ISC 100T Card ...

Страница 444: ...or into the NC port of the MS ISC 100T card located on the right side of the node controller shelf Slots 12 to 17 and the other end into the front panel RJ 45 connector of the TCC3 card in Slot 11 c Using the 19 69 in 0 5 m CAT 5 LAN cable plug one connector into the PRT port of the MS ISC 100T card located on the left side of the node controller shelf Slots 1 to 6 and plug the other connector int...

Страница 445: ...ave completed this procedure NTP L65 Configure the MS ISC 100T Card for a ONS 15454 Multishelf Node for Non Default Public and Private VLAN IDs Use this procedure to configure the MS ISC 100T Card for a multi shelf node for non default public and private VLAN IDs Purpose Voltmeter Tools Equipment None Prerequisite Procedures Cisco NCS 2000 Series Hardware Installation Guide 417 Multishelf Manageme...

Страница 446: ...net0 Router config if no ip address Router config if no ip route cache Router config if bridge group public VLAN ID Router config interface FastEthernet1 Router config if no ip address Router config if no ip route cache Router config if bridge group public VLAN ID Step 3 Enter the following commands to configure ports SSC 1 through SSC 7 Replace port with the port number 2 to 8 and repeat for each...

Страница 447: ...oute cache Router config if no snmp trap link status Router config if bridge group public VLAN ID Router config if bridge group public VLAN ID priority 0 Router config interface FastEthernet10 2 Router config if encapsulation dot1Q private VLAN ID Router config if no ip route cache Router config if no snmp trap link status Router config if bridge group private VLAN ID Router config if bridge group...

Страница 448: ...rio 2 Using RJ 45 and SFP MSM M and MSM P Ports Up to 10 NCS 2015 SSCs Can Be Connected To the NCS 2015 NC 1 Install the SFP module in the SFP ports of the NCS 2015 ECU For more information see NTP L62 Installing the SFP Module on the NCS 2015 ECU on page 412 2 Using a cross over CAT 5 LAN cable a Plug one connector into the M MSM 1 port that corresponds to the control card in Slot1 of the NC b Pl...

Страница 449: ... Slot 17 of SSC 1 b Plug the other connector into the P MSM 2 port that corresponds to the control card in Slot 17 of the SSC 3 8 Using a cross over CAT 5 LAN cable a Plug one connector into the M MSM 1 port that corresponds to the control card in Slot1 of SSC 2 b Plug the other connector into the M MSM 1 port that corresponds to the control card in Slot 1 of the SSC 4 9 Using another cross over C...

Страница 450: ...he control card in Slot1 of the NC b Plug the other connector into the M MSM 2 port that corresponds to the control card in Slot 1 of the SSC 1 3 Using another multi mode fiber optic cable a Plug one connector into the P MSM 2 port that corresponds to the control card in Slot 17 of the NC b Plug the other connector into the P MSM 2 port that corresponds to the control card in Slot 17 of the SSC 1 ...

Страница 451: ...M 2 port that corresponds to the control card in Slot 1 of the SSC 4 9 Using another multi mode fiber optic cable a Plug one connector into the P MSM 3 port that corresponds to the control card in Slot 17 of SSC 2 b Plug the other connector into the P MSM 2 port that corresponds to the control card in Slot 17 of the SSC 4 10 Connect the remaining SSCs by repeating Steps 6 through 9 Scenario 4 Usin...

Страница 452: ... more information see NTP L62 Installing the SFP Module on the NCS 2015 ECU on page 412 2 Using a cross over CAT 5 LAN cable a Plug one connector into the M MSM 1 port of the NCS 2015 NC that corresponds to the control card in Slot 1 b Plug the other end into the MSM port of the NCS 2006 SSC 1 that corresponds to the control card in Slot 1 3 Using another cross over CAT 5 LAN cable a Plug one conn...

Страница 453: ...the P MSM 1 port of the NCS 2015 SSC 2 that corresponds to the control card in Slot 17 b Plug the other end into the MSM port of the NCS 2006 SSC 4 that corresponds to the control card in Slot 8 10 To connect a NCS 2015 or NCS 2006 SSC to a ONS 15454 SSC a Using a cross over CAT 5 LAN cable plug one connector into the M MSM 1 port of NCS 2015 SSC or the MSM port of the NCS 2006 SSC that correspond...

Страница 454: ...to the M MSM 1 port of the NC 2 Using a cross over CAT 5 LAN cable a Plug one connector into Port 1 of the standby Catalyst 3560 b Plug the other connector into the P MSM 1 port of the NC 3 Plug the other connector into the P MSM 1 port of the NC a Plug one connector into Port 23 of the active Catalyst 3560 b Plug the other end into Port 23 of the standby Catalyst 3560 4 To connect all the SSCs to...

Страница 455: ...ves can be subtended The maximum number of NCS 2015 shelves that can be subtended is 10 Scenario 1 Using RJ 45 and SFP MSM M and MSM P Ports ONS 15454 NCS 2006 and NCS 2015 SSCs Can Be Connected To the NCS 2006 NC 1 Install the SFP module in the SFP ports of the ECU in NCS 2015 SSCs For more information see NTP L62 Installing the SFP Module on the NCS 2015 ECU on page 412 2 Using a cross over CAT ...

Страница 456: ...t 1 b Plug the other connector into the M MSM 2 port of the NCS 2015 SSC 4 that corresponds to the control card in Slot 1 9 Using another multi mode fiber optic cable a Plug one connector into the P MSM 2 port of the NCS 2015 SSC 2 that corresponds to the control card in Slot 17 b Plug the other connector into the P MSM 2 port of the NCS 2015 SSC 4 that corresponds to the control card in Slot 17 1...

Страница 457: ...nector into Port 1 of the standby Catalyst 3560 b Plug the other connector into the MSM port of the NC corresponding to Slot 8 3 Using a cross over CAT 5 LAN cable plug one connector into Port 23 of the active Catalyst 3560 Plug the other end into Port 23 of the standby Catalyst 3560 4 To connect all the SSCs to the Catalyst 3560 switches use a cross over CAT 5 LAN cable a Plug one connector into ...

Страница 458: ...pported in this topology is the Cisco ONS 15454 DWDM package Scenario 1 Using RJ 45 and SFP MSM M and MSM P Ports ONS 15454 NCS 2006 and NCS 2015 SSCs Can Be Connected to the ONS 15454 NC When an ONS 15454 is used as the node controller a mix of 15 ONS 15454 NCS 2006 and NCS 2015 shelves can be subtended through the MS ISC 100T card connected to the node controller 1 To connect the ONS 15454 NC to...

Страница 459: ...at corresponds to the control card in Slot 1 b Plug the other connector into the M MSM 2 port of another NCS 2015 SSC y that corresponds to the control card in Slot 1 c Using another multi mode fiber optic cable plug one connector into the P MSM 2 port of NCS 2015 SSC x that corresponds to the control card in Slot 17 d Plug the other connector into the P MSM 2 port of NCS 2015 SSC y that correspon...

Страница 460: ...SSC e Plug the other end into Port 2 of the active Catalyst 3560 f Using a cross over CAT 5 LAN cable plug one connector into g P MSM 1 port of NCS 2015 SSC that corresponds to the control card in Slot 17 h MSM port of NCS 2006 SSC that corresponds to the control card in Slot 8 i RJ 45 port of the control card in Slot 11 of ONS 15454 SSC j Plug the other end into Port 2 of the standby Catalyst 356...

Страница 461: ...he other connector into the P MSM 2 port of the SSC 1 that corresponds to the control card in Slot 17 10 Using another multi mode fiber optic cable a Plug one connector into the M MSM 3 port of the SSC 1 that corresponds to the control card in Slot 1 b Plug the other connector into the M MSM 2 port of the SSC 2 that corresponds to the control card in Slot 1 11 Using another multi mode fiber optic ...

Страница 462: ...t Steps 15 and 16 to connect the remaining SSCs 18 To complete the ring plug one connector of a multi mode fiber optic cable into P MSM 2 port of SSC 10 Plug the other connector into the P MSM 3 port of the NC The scenario is illustrated in the figure below Figure 239 NCS 2015 NC and NCS 2015 SSCs in Ring Topology Scenario 2 Using RJ 45 Ports Connect Cisco NCS 2015 Node Controller and ONS 15454 NC...

Страница 463: ... SSC 15 Plug the other connector into the P MSM 1 port of the NC Scenario 3 Using RJ 45 Ports Connect Cisco NCS 2006 Node Controller and ONS 15454 NCS 2006 and NCS 2015 Subtending Shelves in a Ring Topology The maximum number of NCS 2015 shelves that can be subtended is 10 1 Using a cross over CAT 5 LAN cable a Plug one connector into the MSM port of the NCS 2006 NC that corresponds to the control...

Страница 464: ...n Slot 8 b Plug the other end into the P MSM port of the NCS 2015 SSC 2 that corresponds to the control card in Slot 17 4 Using a cross over CAT 5 LAN cable a Plug one connector into the M MSM 1 port of the NCS 2015 SSC 2 that corresponds to the control card in Slot 1 b Plug the other end into the RJ 45 port of the control card in Slot 7 of ONS 15454 SSC 3 5 Repeat Steps 2 and 3 to connect the rem...

Страница 465: ...i mode fiber optic cable a Plug one connector into the M MSM 2 port of NCS 2015 SSC 4 that corresponds to the control in Slot 1 b Plug the other connector into the M MSM 2 port of NCS 2015 SSC 5 that corresponds to the control in Slot 1 7 Repeat Steps 3 through 6 to connect the remaining SSCs 8 To complete the ring plug one connector of a cross over CAT 5 LAN cable into P MSM 1 port of NCS 2015 SS...

Страница 466: ...TSCE sensors measure appear on the LCD screen in the NCS 2006 chassis Note The input voltages and temperature of the NCS 2006 chassis are displayed in the Shelf view Provisioning General Voltage Temperature pane in CTC The voltage supplied to the shelf in millivolts is displayed in the Voltage area of the Voltage Temperature pane The temperature of the shelf in degree Celsius is displayed in the T...

Страница 467: ...e shelf has two cards with low cooling profile three cards with medium cooling profile and one card with high cooling profile you must choose a high cooling profile for the shelf The wrong cooling profile chosen for the shelf might harm the cards present in the shelf Caution If a wrong cooling profile is chosen for the shelf the COOL MISM condition is raised on the shelf For more information on th...

Страница 468: ...Cisco NCS 2000 Series Hardware Installation Guide 440 Multishelf Management Cooling Profile ...

Страница 469: ...ning Fiber Connectors page 452 NTP L25 Replacing the Fan Tray Assembly of the NCS 2002 Shelf Assembly page 455 NTP L26 Replacing the Fan Tray Assembly of the NCS 2006 Shelf Assembly page 457 NTP L59 Replacing Fan Tray Assembly of NCS 2015 Shelf Assembly page 460 NTP L19ReplacingtheAirFilteroftheNCS2002ShelfAssembly This procedure replaces the air filter of the NCS 2002 shelf assembly Purpose New a...

Страница 470: ...er after the initial six month inspection If they are dirty or clogged with dust they must be replaced with a new air filter Note Procedure Step 1 Untighten the screw on the air filter see the figure below Figure 240 Replacing the Air Filter Screw 2 Air filter 1 Cisco NCS 2000 Series Hardware Installation Guide 442 Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves NTP L19 Replacing the Air Fi...

Страница 471: ... the air filter with a new one if the air filter is dirty or clogged with dust Step 5 Attach the cable guide and insert the air filter into the shelf assembly The air filter must be inserted with the grid facing the shelf assembly as shown in the figure above Note Step 6 Tighten the screw on the air filter Cisco NCS 2000 Series Hardware Installation Guide 443 Maintaining the NCS 2002 NCS 2006 and ...

Страница 472: ...isco NCS 2000 Series Prerequisite Procedures As Needed Required As Needed Remote Onsite Remote Provisioning or higher Security Level The air filters are single use only They must not be cleaned and reused This is a Telcordia NEBS requirement GR 63 CORE Issue 4 Note Air filters must be inspected every quarter after the initial six month inspection If they are dirty or clogged with dust they must be...

Страница 473: ...d to Step 3 Step 3 Push the retention feature present on the right side of the shelf assembly to the left side see the figure below Figure 243 Replacing the Air Filter Step 4 Extract the air filter from the shelf assembly see the figure below Step 5 Replace the air filter with a new one if the air filter is dirty or clogged with dust Step 6 Insert the air filter into the shelf assembly see the fig...

Страница 474: ... the figure below Figure 245 Replacing the Air Filter Step 8 Close the front door If you removed the door complete the NTP L4 Installing the Standard Door of the NCS 2006 Shelf on page 247 Stop You have completed this procedure Cisco NCS 2000 Series Hardware Installation Guide 446 Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves NTP L20 Replacing the Air Filter of the NCS 2006 Shelf Assembly...

Страница 475: ...the AC Power Module in the NCS 2006 Shelf on page 283 Prerequisite Procedures As Needed Required As Needed Remote Onsite Remote Provisioning or higher Security Level The air filters are single use only They must not be cleaned and reused This is a Telcordia NEBS requirement GR 63 CORE Issue 4 Note Air filters must be inspected every quarter after the initial six month inspection If they are dirty ...

Страница 476: ...he figure below Figure 246 Replacing the Air Filter AC Power Module Step 4 Replace the air filter with a new one if the air filter is dirty or clogged with dust Step 5 Close the front door If you removed the door complete the NTP L4 Installing the Standard Door of the NCS 2006 Shelf on page 247 Stop You have completed this procedure NTP L58ReplacingtheAirFilteroftheNCS2015ShelfAssembly This proced...

Страница 477: ...r higher Security Level The air filters are single use only They must not be cleaned and reused This is a Telcordia NEBS requirement GR 63 CORE Issue 4 Note Air filters must be inspected every quarter after the initial six month inspection If they are dirty or clogged with dust they must be replaced with a new air filter Note Cisco NCS 2000 Series Hardware Installation Guide 449 Maintaining the NC...

Страница 478: ...5 DC Shelf Air filter 1 Step 3 Replace the air filter in the air filter holder assembly with a new one if the air filter is dirty or clogged with dust Step 4 Insert the air filter assembly into the shelf assembly The air filter must be inserted with the grid facing the shelf assembly Note Cisco NCS 2000 Series Hardware Installation Guide 450 Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves N...

Страница 479: ...CS 2015 DC Shelf with Replaced Air Filter Screw 1 Step 6 Swing the door closed and turn the knob to lock Stop You have completed this procedure Cisco NCS 2000 Series Hardware Installation Guide 451 Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves NTP L58 Replacing the Air Filter of the NCS 2015 Shelf Assembly ...

Страница 480: ... Warning Procedure Step 1 Using an inspection microscope inspect each fiber connector for dirt cracks or scratches Step 2 Replace any damaged fiber connectors Replace all dust caps whenever the equipment is unused for 30 minutes or more Note Step 3 Complete DLP G262 Cleaning Fiber Connectors with CLETOP on page 453 as necessary Step 4 Complete DLP G263 Cleaning the Fiber Adapters on page 454 as ne...

Страница 481: ...r on the cartridge to swipe the connector surface Step 4 Insert the fiber connector into the applicable adapter or attach a dust cap to the fiber connector If you must replace a dust cap on a connector first verify that the dust cap is clean Note Step 5 Return to your originating procedure NTP DLP G262 Cleaning Fiber Connectors with CLETOP This task cleans the fiber connectors with CLETOP Purpose ...

Страница 482: ...p is clean To clean the dust cap wipe the outside of the cap using a dry lint free wipe and the inside of the dust cap using a CLETOP stick swab 14100400 Note Step 6 Return to your originating procedure NTP DLP G263 Cleaning the Fiber Adapters This task cleans the fiber adapters Purpose CLETOP stick swab Tools Equipment None Prerequisite Procedures Required Required As Needed Onsite Onsite Remote ...

Страница 483: ...ired Required As Needed Onsite Onsite Remote None Security Level Do not force a fan tray assembly into place Doing so can damage either the connectors on the fan tray or the connectors on the back panel of the shelf assembly or both Caution The estimated time required to change a fan tray assembly is 2 minutes Note Cisco NCS 2000 Series Hardware Installation Guide 455 Maintaining the NCS 2002 NCS ...

Страница 484: ... fan tray assembly partially to disconnect the backplane connector and wait until the fan stops see the figure below Figure 250 Fan Tray Extracted Partially with Power Connector Disconnected Cisco NCS 2000 Series Hardware Installation Guide 456 Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves NTP L25 Replacing the Fan Tray Assembly of the NCS 2002 Shelf Assembly ...

Страница 485: ...D on the front of the fan tray is activated Stop You have completed this procedure NTP L26ReplacingtheFan TrayAssemblyoftheNCS2006Shelf Assembly This procedure replaces the fan tray assembly of the NCS 2006 shelf assembly Purpose Small slot head screwdriver Tools Equipment NTP L11 Installing the Fan Tray Assembly in the NCS 2006 Shelf on page 296 Prerequisite Procedures Required Required As Needed...

Страница 486: ...the NCS 2006 Shelf on page 253 If the shelf assembly does not have a front door continue with Step 3 Step 2 Optional Complete the DLP L13 Removing the Standard Door of the NCS 2006 Shelf on page 255 to remove the front door If you do not want to remove the door proceed to Step 3 Step 3 Untighten the screws on the fan tray assembly see the figure below Figure 252 Extract the Fan Tray Assembly Cisco...

Страница 487: ... assembly see the figure below Figure 254 Fan Tray Extracted Step 6 Slide the new fan tray into the shelf assembly until the electrical plug at the rear of the tray plugs into the corresponding receptacle on the backplane Step 7 To verify that the tray has plugged into the backplane ensure that the LED on the front of the fan tray is activated Cisco NCS 2000 Series Hardware Installation Guide 459 ...

Страница 488: ...inutes Note Procedure Step 1 Open the front door of the shelf assembly see NTP L51 Opening and Removing the Door of the NCS 2015 Shelf on page 381 If the shelf assembly does not have a front door continue with the next step Step 2 Untighten the captive screws on the fan tray assembly Step 3 Extract the fan tray partially using the handle in order to disconnect the backplane connector and wait unti...

Страница 489: ...Cisco NCS 2000 Series Hardware Installation Guide 461 Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves NTP L59 Replacing Fan Tray Assembly of NCS 2015 Shelf Assembly ...

Страница 490: ...Cisco NCS 2000 Series Hardware Installation Guide 462 Maintaining the NCS 2002 NCS 2006 and NCS 2015 Shelves NTP L59 Replacing Fan Tray Assembly of NCS 2015 Shelf Assembly ...

Страница 491: ... Transport Controller CTC specifications the LAN Transaction Language One TL1 modem and alarm specifications timing power and environmental specifications and shelf dimensions Bandwidth The NCS 2002 has these bandwidth specifications depending on the applications Total bandwidth 200 Gbps Data plane bandwidth 100 Gbps per slot Configurations The NCS 2002 can be configured for these dense wavelength...

Страница 492: ...module TL1 Craft Interface The NCS 2002 TL1 craft interface has these specifications TNC TNCE TSC TSCE access EIA TIA 232 DB 9 type connector Modem Interface The NCS 2002 modem interface has these specifications Hardware flow control TNC TNCE TSC TSCE EIA TIA 232 DB 9 type connector Alarm Interface The NCS 2002 does not support alarm interface Passive Unit Remote Inventory The NCS 2002 provides 1 ...

Страница 493: ...e running accuracy 4 6 ppm Holdover stability 3 7 exp 7 per day including temperature 255 slips in first 24 hours Reference External BITS line internal System Power The NCS 2002 has these AC power specifications Input Voltage 100V 240V AC 10 Power consumption Configuration dependent 35 W Fan Tray and LCD Power terminals standard 3 pole AC connector For an AC power supply the fuse rating must not e...

Страница 494: ...g temperature 23 to 131 degrees Farenheit 5 to 55 degrees Celsius Operating humidity 5 to 95 percent noncondensing The NCS 2002 for ETSI environment has the following specifications Operating temperature 23 to 131 degrees Fahrenheit 5 to 55 degrees Celsius Operating humidity 5 to 95 percent noncondensing Dimensions The NCS 2002 shelf assembly has these dimensions Height 3 5 inches 88 9 mm Width 19...

Страница 495: ...NCS 2006 can be configured for the following dense wavelength division multiplexing DWDM topologies Hubbed rings Multihubbed rings Point to point Linear Linear with optical add drop multiplexing OADM Hybrid terminal node Hybrid OADM node Hybrid line amplifier node Transponder Shelf Layer 2 aggregation shelf Cisco Transport Controller CTC the NCS 2006 craft interface software has the following spec...

Страница 496: ... The NCS 2006 alarm interface has the following specifications 2 SCSI Connectors located on the ECU or ECU2 Visual Critical Major Minor Remote Audible Critical Major Minor Remote Alarm inputs Common 32 VDC output for all alarm inputs closed contact limited to 2 mA Control outputs Open contact maximum 60 VDC closed contact maximum 100 mA Passive Unit Remote Inventory The NCS 2006 provide 12 standar...

Страница 497: ...s Reference External BITS line internal System Power AC Power Specifications The NCS 2006 has these AC power specifications Shelf power consumption Configuration dependent 130 W Fan Tray LCD and ECU module Power terminals standard 3 pole AC connector Fuse rating for an AC power supply must not exceed 10 A 15 A or 20 A depending on the standard in various countries For North America the branch circ...

Страница 498: ... the NCS 2006 shelf is powered at 60 VDC nominal only these cards can be installed TNC OPT AMP C OPT AMP 17 C OPT EDFA 17 OPT EDFA 24 17 SMR9 FS 24 SMR9 FS 34 SMR9 FS SMR20 FS SMR20 FS CV 12 AD FS 16 AD FS 100GS CK LC and MR MXP cards and the NCS2006 ECU 60 card Note When you use the 60V DC power module for NCS 2006 you must go to CTC shelf view Provisioning General Power Monitor and set the follo...

Страница 499: ...considered for power calculation The Actual Power is the power consumed by a line card once it has boot up The Typical Power is the power consumed by a line card when it is physically present in the shelf but deleted in CTC or when it has not boot up due to PWR CON LMT alarm after installation or pre provisioning During power calculation certain wattage is always reserved for ancillary units like ...

Страница 500: ...ronment has these specifications Operating temperature 23 to 131 degrees Farenheit 5 to 55 degrees Celsius Operating humidity 5 to 95 percent noncondensing The NCS 2006 for ETSI environment has these specifications Operating temperature 23 to 131 degrees Fahrenheit 5 to 55 degrees Celsius Operating humidity 5 to 95 percent noncondensing Dimensions The NCS 2006 shelf assembly has these dimensions H...

Страница 501: ... front plate Shelf access RJ 45 LAN connector and optical EMS port located on the ECU The CT EMS copper port functions as the craft port only in the secure mode External LAN Interface for EMS The NCS 2015 external LAN interface has the following specification 10 100BaseT Ethernet located on the ECU and supports 10 100 Mbps full duplex Auto detection 100 Mbps FX optical port located on the ECU and ...

Страница 502: ...rts and two USB 3 0 ports located on the ECU to retrieve the inventory data from the passive units BITS Interface The NCS 2015 building integrated timing supply BITS interface has the following specifications 2 T1 BITS inputs wire wrap for applications 2 derived T1 outputs wire wrap for applications 2 E1 BITS input DIN 1 0 2 3 for ETSI applications 2 E1 BITS output DIN 1 0 2 3 for ETSI application...

Страница 503: ...edundancy and A and B battery plant dual feeds redundancy DC AC Input 200 to 240 VAC range 180 to 264 VAC Nominal input voltage 50 60 Hz range 47 to 63 Hz Nominal line frequency 30 A North America dedicated branch circuit 30 A International dedicated branch circuit Recommended AC service DC Input 48 VDC or 60 VDC tolerance range 40 5 to 72 VDC Nominal input voltage 36 A max at 48 VDC28 8 A max per...

Страница 504: ...e 29 Fan Tray Assembly Power Requirements BTU Hr Amps Watts Fan Tray Assembly 1910 72 10 4 560 NCS2015 FTA System Environmental Specifications The following table describes the environmental specifications for the NCS 2015 shelf Table 30 Cisco NCS 2015 Environmental Specifications Operating nominal 41 to 104 F 5 to 40 C Operating short term 23 to 131 F 5 to 55 C Non operating 40 to 158 F 40 to 70 ...

Страница 505: ...rature 80 F 27 C 70 7 dB modular configuration power Sound power level DC power Dimensions The NCS 2015 shelf assembly has these dimensions Height 24 44 inches 620 776 mm Width 17 67 inches 448 81 mm Depth 11 10 inches 281 94 mm Weight Empty chassis 69 225 pounds 31 4 kg Chassis with ancillary units and line cards 99 20 pounds 45 kg Cisco NCS 2000 Series Hardware Installation Guide 477 Hardware Sp...

Страница 506: ...Cisco NCS 2000 Series Hardware Installation Guide 478 Hardware Specifications Dimensions ...

Страница 507: ...software release 400 cutting fuse and alarm cables 83 209 341 D date 80 204 default 80 204 E Electrostatic Discharge and Grounding Guide for Cisco Cisco CPT and Cisco ONS Platforms 92 95 126 199 200 213 217 229 257 277 296 327 333 393 ESD plug input 111 253 381 F fan tray assembly 95 131 132 218 296 392 393 455 description 218 fan failure 132 296 393 fan speed 95 131 296 392 installing 296 393 rep...

Страница 508: ... 388 392 393 398 411 448 460 473 air filter 398 ANSI rack installation 311 connecting office power 341 ETSI rack installation 314 external connection units 382 fan tray assembly 392 front door 361 installation overview 299 installing deep door 372 installing fan tray assembly 393 installing power and ground 333 installing power modules 388 installing standard door 366 installing the ECU 384 LCD un...

Страница 509: ... verifying software version 400 T TCC2 card 83 88 209 213 400 clock reset 83 88 209 213 installing 400 Temperature 438 Shelf 438 third party equipment 1 3 4 fuse and alarm panels 1 3 4 TNC card 399 404 405 configuring UDC and VoIP 405 installing 399 provisioning PPM and port 404 TNCS card 399 404 installing 399 provisioning PPM and port 404 TSC card 399 installing 399 turning on office power 91 92...

Страница 510: ...Cisco NCS 2000 Series Hardware Installation Guide IN 4 Index ...

Отзывы: