background image

Notch on both sides of the
chassis for locking the
power supply end of the
chassis to the bottom
support rails (4-post rack
installations).

3

Screw holes for front
mounting brackets (4-post
rack installations)

1

Screw holes for
center-mount bracket
(2-post rack installations)

2

Depending on whether you plan to position the ports in a hot or cold aisle, you can order the fan and power
supply modules with port-side intake or port-side exhaust airflow. For port-side intake airflow, the fan and
AC power supply modules have burgundy coloring. For port-side exhaust airflow, the fan and AC power
supplies have blue coloring. You can also order the 1200-W HVAC/HVDC power supply which has
dual-direction airflow with white coloring. Dual-direction airflow modules automatically use the airflow
direction of the other modules installed in the switch.

The fan and power supply modules are field replaceable. You can replace one fan module or one power supply
module during operations so long as the other modules are installed and operating. If you have only one power
supply installed, you can install the replacement power supply in the open slot before removing the original
power supply.

Cisco Nexus 93360YC-FX2 NX-OS Mode Switch Hardware Installation Guide

4

Overview

Overview

Содержание N9K-C93360YC-FX2

Страница 1: ...h Hardware Installation Guide First Published 2019 07 20 Last Modified 2020 07 22 Americas Headquarters Cisco Systems Inc 170 West Tasman Drive San Jose CA 95134 1706 USA http www cisco com Tel 408 526 4000 800 553 NETS 6387 Fax 408 527 0883 ...

Страница 2: ...d to try to correct the interference by using one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Modifications to this product not authorize...

Страница 3: ... Requirements 7 Dust and Particulate Requirements 8 Minimizing Electromagnetic and Radio Frequency Interference 8 Shock and Vibration Requirements 9 Grounding Requirements 9 Planning for Power Requirements 9 Airflow Requirements 11 Rack and Cabinet Requirements 11 Clearance Requirements 12 Installing the Chassis 15 C H A P T E R 3 Installation Options with Rack Mount Kits 15 Install a Rack 16 Unpa...

Страница 4: ...2 Starting the Switch 33 Connecting the Switch to the Network 37 C H A P T E R 4 Overview of Network Connections 37 Connecting a Console to the Switch 37 Creating the Initial Switch Configuration 39 Setting Up the Management Interface 40 Connecting Interface Ports to Other Devices 41 Uplink Connections 41 Downlink Connections 41 Replacing Components 43 C H A P T E R 5 Replacing a Fan Module During...

Страница 5: ...cations 55 1200 W AC Power Supply Specifications 55 1200 W HVAC HVDC Power Supply Specifications 56 930 W DC Power Supply Specifications 56 Power Cable Specifications 57 AC Power Cables Supported by NX OS Mode Switches 57 HVAC HVDC Power Cables Supported by ACI Mode and NX OS Mode Switches 58 DC Power Cable Specifications 59 Regulatory Standards Compliance Specifications 59 LEDs 61 A P P E N D I X...

Страница 6: ...Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide vi Contents ...

Страница 7: ...uments for which the user supplies the values Italic Square brackets enclose an optional element keyword or argument x Square brackets enclosing keywords or arguments separated by a vertical bar indicate an optional choice x y Braces enclosing keywords or arguments separated by a vertical bar indicate a required choice x y Nested set of square brackets or braces indicate optional or required choic...

Страница 8: ...f code indicates a comment line Documentation Feedback To provide technical feedback on this document or to report an error or omission please send your comments to We appreciate your feedback Obtaining Documentation and Submitting a Service Request For information on obtaining documentation using the Cisco Bug Search Tool BST submitting a service request and gathering additional information see W...

Страница 9: ...haust fan module with blue coloring NXA FAN 160CFM PE Port side intake fan module with burgundy coloring NXA FAN 160CFM PI Power supply modules two One for operations and one for redundancy 1 1 with the following choices 1200 W port side exhaust AC power supply with blue coloring NXA PAC 1200W PE 1200 W port side intake AC power supply with burgundy coloring NXA PAC 1200W PI 1200 W HVAC HVDC dual ...

Страница 10: ...C HVDC power supplies Note All fan modules and power supplies must use the same airflow direction If you are using the 1200 W HVAC HVDC power supplies those power supplies automatically use the same airflow direction as used by the fan modules Note Deployment Scheme for SFP 10G T X Transceivers The following figure shows the maximum configuration density of SFP 10G T X SFP transceivers for this sw...

Страница 11: ... shows the switch features on the power supply side of the chassis Console port 1 5 Fan modules 3 with slots numbered from 1 left to 3 right 1 Grounding pad 6 Management port 1 SFP optical port 2 Power supply modules 1 or 2 AC power supplies shown with slots numbered 1 top and 2 bottom 7 USB port 1 3 Management port 1 RJ 45 copper port 4 The following figure shows the side of the chassis Cisco Nex...

Страница 12: ...ing For port side exhaust airflow the fan and AC power supplies have blue coloring You can also order the 1200 W HVAC HVDC power supply which has dual direction airflow with white coloring Dual direction airflow modules automatically use the airflow direction of the other modules installed in the switch The fan and power supply modules are field replaceable You can replace one fan module or one po...

Страница 13: ... modules in the switch Note If the switch has port side intake airflow burgundy coloring for fan modules you must locate the ports in the cold aisle If the switch has port side exhaust airflow blue coloring for fan modules you must locate the ports in the hot aisle If you locate the air intake in a hot aisle the switch can overheat and shut down Caution Cisco Nexus 93360YC FX2 NX OS Mode Switch Ha...

Страница 14: ...Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 6 Overview Overview ...

Страница 15: ...0 to 70 degrees Celsius Humidity Requirements High humidity can cause moisture to enter the switch Moisture can cause corrosion of internal components and degradation of properties such as electrical resistance thermal conductivity physical strength and size The switch is rated to withstand from 5 to 95 percent noncondensing relative humidity Buildings in which the climate is controlled by air con...

Страница 16: ...her devices through the power cable and power source or through the air as transmitted radio waves The Federal Communications Commission FCC publishes specific regulations to limit the amount of EMI and RFI that are emitted by computing equipment Each switch meets these FCC regulations To reduce the possibility of EMI and RFI follow these guidelines Cover all open expansion slots with a blank fill...

Страница 17: ...ely you can ground the chassis by using a customer supplied grounding cable that meets your local and national installation requirements For U S installations we recommend 6 AWG wire Connect your grounding cable to the chassis with a grounding lug provided in the switch accessory kit and to the facility ground You automatically ground AC power supplies when you connect them to AC power sources For...

Страница 18: ... the amount of power that is required for the power supplies Note To minimize the possibility of circuit failure make sure that each power source circuit that is used by the switch is dedicated to the switch For AC input application please refer to the following statement Note Statement 1005 Circuit Breaker This product relies on the building s installation for short circuit overcurrent protection...

Страница 19: ...e port end in the cold aisle and exhausts through the fan and power supply modules in the hot aisle You can identify the airflow direction of each fan and power supply module by its coloring as follows To prevent the switch from overheating and shutting down you must position the air intake for the switch in a cold aisle The fan and power supply modules must have the same direction of airflow even...

Страница 20: ...echanism must be in place or the rack must be bolted to the floor before installation or servicing Failure to stabilize the rack can cause bodily injury Warning Clearance Requirements Provide the chassis with adequate clearance between the chassis and any other rack device or structure so that you can properly install the chassis Provide the chassis with adequate clearance to route cables provide ...

Страница 21: ...t clearance area equal to the width of the chassis with two rack mount brackets that are attached to it 4 Both the front and rear of the chassis must be open to both aisles for airflow Note Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 13 Preparing the Site Clearance Requirements ...

Страница 22: ...Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 14 Preparing the Site Clearance Requirements ...

Страница 23: ...asy access to either the port connections or the fan and power supply modules You can install the switch using the following rack mount options Rack mount kit NXK ACC RMK 2RU which you can order from Cisco This option offers you easy installation greater stability increased weight capacity added accessibility and improved removability with front and rear removal For four post racks Rack mount kit ...

Страница 24: ... take care when connecting units to the supply circuit so that wiring is not overloaded Warning If you are not using power redundancy or are using n 1 redundancy you need only one power source If you are using n n redundancy you need two power sources Note Unpacking and Inspecting a New Switch Before you install a new chassis you need to unpack and inspect it to be sure that you have all the items...

Страница 25: ...flow Enter the power supply side and exhaust out the port side port side exhaust airflow For port side intake airflow the switch must have port side intake fan and AC power supply modules with one or more of the following colorings Burgundy coloring on fan modules and AC power supplies For port side exhaust airflow the switch must have port side exhaust fan and AC power supply modules with one or ...

Страница 26: ...ad the rack from the bottom to the top with the heaviest component at the bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Warning Before you begin You must separately order the center mount brackets if you are installing the chassis in a two post rack These brackets do not ship with the chassis unless you...

Страница 27: ...quired airflow If the fan modules have a blue coloring for port side exhaust airflow then you must position the modules by the cold aisle If the fan modules have a burgundy coloring for port side intake airflow you must position the modules by the hot aisle Power supply modules must have the same airflow direction as the fan modules Note Statement 1074 Comply with Local and National Electrical Cod...

Страница 28: ...the rack if it is the only unit in the rack When mounting this unit in a partially filled rack load the rack from the bottom to the top with the heaviest component at the bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Warning Step 1 Use one person to position the chassis so that it is near the top of the...

Страница 29: ... and secure the switch to the rack with the retainer clips Typically the front of the rack is the side easiest to access for maintenance You must supply the eight 10 32 or 12 24 screws required to mount the slider rails and switch to the rack Note Before you begin You have inspected the switch shipment to ensure that you have everything ordered Make sure that the switch rack mount kit includes the...

Страница 30: ...hassis as explained in Grounding the Chassis on page 32 If you are installing the chassis into a grounded rack you can skip this step Step 3 Install the slider rails on the rack or cabinet as follows a Determine which two posts of the rack or cabinet you should use for the slider rails Of the four vertical posts in the rack or cabinet two will be used for the front mount brackets attached to the e...

Страница 31: ...ion the switch onto the rack mount brackets and carefully slide the chassis into the rack see the following figure Step 5 Insert the rack mount retainer brackets a Align the retainer brackets to the front of the chassis being careful not to damage anything on the front of the chassis see the following figure b Repeat Step 5 to attach the other retainer bracket on other side of the chassis Cisco Ne...

Страница 32: ...ail Make sure to hook the flange to the cutout on the bracket and align the screw holes see the following figure b Attach the screws to secure the retainer clip see the following figure c Repeat Step 6 to attach the other retainer clip on the other side of the chassis Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 24 Installing the Chassis Installing the Switch using the NXK...

Страница 33: ... support rail the rail half that slides into the other rail includes a chassis stop that fits into the module end of the chassis Depending on direction of the chassis airflow you need to position the rail half with the chassis stop so that the fan and power supply modules end up in the appropriate aisle as follows Port side intake burgundy coloring for fan modules airflow requires that the bottom ...

Страница 34: ...to the top with the heaviest component at the bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Warning Step 1 Look at the fan and power supply modules installed in the chassis to determine how you must position the bottom support rails on the rack If the fan modules have blue coloring port side exhaust mod...

Страница 35: ...m support bracket to the rear of the rack 1 Chassis stop on the expanding bottom support bracket 2 Step 5 Repeat Steps 2 and 3 to attach the other expanding bottom support rails to the other side of the rack Check the two installed bottom support rails to be sure that both have their chassis stops by the same aisle either both by the hot aisle or both by the cold aisle and that both rails are leve...

Страница 36: ... mount bracket with two screw holes aligned to two screw holes in the chassis and one screw hole facing the front port side of the chassis 1 Step 2 Use two M4 x 6 mm screws to attach the bracket to the chassis Tighten each screw to 11 to 15 in lb 1 2 to 1 7 N m Step 3 Repeat Steps 1 and 2 to attach the second center mount bracket to the other side of the chassis What to do next You are ready to mo...

Страница 37: ...ened to the sides of the chassis at the port end Make sure that you have two customer supplied rack mount screws M6 x 10 mm or appropriate screw for the vertical mounting rails on the rack Statement 1006 Chassis Warning for Rack Mounting and Servicing To prevent bodily injury when mounting or servicing this unit in a rack you must take special precautions to ensure that the system remains stable T...

Страница 38: ...s locks onto the chassis stops at the end of the rails 1 Customer supplied rack mount screw M6 x 10 mm screw or other screw appropriate for the rack used to secure each side of the chassis to the rack 4 Chassis stops for holding the chassis positioned by the aisle required for the fan and power supply modules 2 Step 2 Use a customer supplied rack mount screw an M6 x 10 mm screw or other appropriat...

Страница 39: ...t applied before installation Note You supply the 10 32 or 12 24 screws to mount the vent bracket and airflow sleeve Note Before you begin Verify that your shipment is complete Install your rack in a secure location SUMMARY STEPS 1 Insert the vent bracket and attach it as follows DETAILED STEPS Insert the vent bracket and attach it as follows a Holding the vent bracket NXA ACC BAV4 position it in ...

Страница 40: ...the equipment in the absence of a suitably installed ground conductor Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available Warning Statement 1046 Installing or Replacing the Unit To reduce risk of electric shock when installing or replacing the unit the ground connection must always be made first and disconnected last W...

Страница 41: ... torque Step 4 Prepare the other end of the grounding wire and connect it to the facility ground Starting the Switch You start the switch by connecting it to its dedicated power source If you need n 1 redundancy you must connect each of the power supplies to one or two power sources If you need n n redundancy you must connect each power supply in a switch to a different power source Before you beg...

Страница 42: ... Remove the nuts from each of the terminal posts for the power supply 3 Place the power cable negative wire terminal ring on the negative terminal for the power source and secure them with a terminal nut 4 Place the power cable positive wire terminal ring on the positive terminal for the power source and secure them with a terminal nut 5 Place the power cable ground wire terminal ring on the groun...

Страница 43: ...tus labeled as STA or STS LED is green Step 7 Verify that the system software has booted and the switch has initialized without error messages A setup utility automatically launches the first time that you access the switch and guides you through the basic configuration For instructions on how to configure the switch and check module connectivity see the appropriate Cisco Nexus 9000 Series configu...

Страница 44: ...Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 36 Installing the Chassis Starting the Switch ...

Страница 45: ...ation using a console you can make this connection to manage all future switch configurations Uplink and downlink interface connections These are connections to hosts and servers in the network Each of these connection types is explained in one of the sections that follow When running cables in overhead or subfloor cable trays we strongly recommend that you locate power cables and other potential ...

Страница 46: ...ter possible during setup and configuration Note Before you begin The switch must be fully installed in its rack which is connected to a power source and grounded The necessary cabling for the console management and network connections must be available An RJ 45 rollover cable provided in the switch accessory kit Network cabling is routed to the location of the installed switch Step 1 Configure th...

Страница 47: ...to the same AC circuit If you are using the input source n n power mode connect half of the power supplies to one AC circuit And connect the other half of the power supplies to another AC circuit The Input and Output LEDs on each power supply light up green when the power supply units are sending power to the switch and the software asks you to specify a password to use with the switch Step 2 Ente...

Страница 48: ...o not to edit the configuration The software asks if you need to save the configuration Step 8 Enter yes to save the configuration What to do next You can now set up the management interface for each supervisor module on the switch Setting Up the Management Interface The RJ 45 and or SFP management ports provide out of band management which enables you to use the command line interface CLI to mana...

Страница 49: ...les into the transceivers This helps to prolong the life of both the transceiver and cables When removing transceivers from the switch it is best to remove the optical cable first and then remove the transceiver To determine which transceivers adapters and cables are supported by this switch see the Cisco Transceiver Modules Compatibility Information document Uplink Connections For a list of trans...

Страница 50: ...Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 42 Connecting the Switch to the Network Downlink Connections ...

Страница 51: ...s in a cold aisle Before you begin Before you can replace a fan module ensure that both of the following conditions exist The replacement fan module must have the same airflow direction as the other modules in the chassis If you must replace the fan module during operations and both of the above conditions are not met leave the fan module that you need to replace in the chassis to preserve the des...

Страница 52: ... supply during operations so long as the new power supply has the same airflow direction as the other modules in the chassis You can replace a power supply with another supported power supply that has the same power source type and the same wattage rating as the other installed power supply Additionally the airflow direction of the power supply must match or conform to the airflow direction of the...

Страница 53: ...Remove the power cable from the power supply by pressing the tab on the top of the Anderson Power SAF D Grid connector and pull the cable and connector out of the power supply Step 3 Grasp the power supply handle while pressing the release latch towards the power supply handle Step 4 Place your other hand under the power supply to support it while you slide it out of the chassis Do not touch the e...

Страница 54: ...the other modules in the switch Note An AC power source must be within reach of the power cable that will be used with the replacement power supply If you are using n n power redundancy there must be a separate power source for each power supply installed in the chassis Otherwise only one power source is required There must be an earth ground connection to the chassis that you are installing the r...

Страница 55: ... installed in the chassis power sources must be of the same type do not mix AC and DC power sources for the same switch Otherwise only one power source is required There must be an earth ground connection to the chassis that you are installing the replacement module Typically the chassis is grounded by its metal to metal connection to a grounded rack If you need to ground this chassis by another m...

Страница 56: ...t module Typically the chassis is grounded by its metal to metal connection to a grounded rack If you need to ground this chassis by another means see Grounding the Chassis on page 32 We recommend 8 AWG wire for DC installation in the U S All DC power supplies have reverse polarity protection When you inadvertently connect the input power to the DC PSU s terminal and the input power to the DC PSU ...

Страница 57: ...or operate the equipment in the absence of a suitably installed ground conductor Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available Warning Before you begin You must turn off the circuit breaker for the DC power cables that you are connecting to prevent electrocution Step 1 Verify that the circuit breaker for the powe...

Страница 58: ...C negative wire into the aperture and then release the lever Step 7 Use a small screwdriver to depress the spring loaded wire retainer lever on the upper spring cage wire connector Insert your red DC positive wire into the aperture and then release the lever Step 8 Insert the connector block back into the power supply Make sure that your red DC positive wire aligns with the power supply label DC S...

Страница 59: ...cks If you are selecting an enclosed cabinet we recommend one of the thermally validated types either standard perforated or solid walled with a fan tray Note We do not recommend that you use racks that have obstructions such as power strips because the obstructions could impair access to field replaceable units FRUs Note General Requirements for Cabinets and Racks The cabinet or rack must also me...

Страница 60: ...en Racks If you are mounting the chassis in an open rack no side panels or doors ensure that the rack meets the following requirements The minimum vertical rack space per chassis must be The distance between the chassis air vents and any walls should be 2 5 inches 6 4 cm Requirements Specific to Perforated Cabinets A perforated cabinet has perforations in its front and rear doors and side walls Pe...

Страница 61: ...s on page 59 Environmental Specifications Specification Environment 32 to 104 F 0 to 40 C Ambient operating temperature Temperature 40 to 158 F 40 to 70 C Ambient nonoperating 5 to 85 Nonoperating Relative humidity 0 to 13 123 feet 0 to 4 000 meters Operating Altitude Specification Environment 32 to 104 F 0 to 40 C Ambient operating temperature Temperature 40 to 158 F 40 to 70 C Ambient nonoperati...

Страница 62: ...rt side intake burgundy NXA PAC 1200W PI 1200 W HVAC HVDC dual direction white N9K PUV 1200W 930 W DC port side exhaust blue NXA PDC 930W PE 930 W DC port side intake burgundy NXA PDC 930W PI Transceiver and Cable Specifications To determine which transceivers adapters and cables are supported by this switch see https www cisco com c en us support interfaces modules transceiver modules products de...

Страница 63: ...360YC FX2 Power Specifications Power specifications include the specifications for each type of power supply module 1200 W AC Power Supply Specifications These specifications apply to the following 1200 W AC power supplies Specification Characteristic Nominal range 100 120 VAC 200 240 VAC AC input voltage Nominal range 50 to 60 Hz Range 47 63 Hz AC input frequency 10 A at 100 120 VAC 8 A at 200 24...

Страница 64: ...output voltage For 200 to 277 VAC For 192 to 400 VDC 12 V at 2 5 A Power supply standby voltage Climate Savers Platinum Efficiency 80Plus Platinum certified Efficiency rating RSP1 Form factor 930 W DC Power Supply Specifications These specifications apply to the following power supplies NXA PDC 930W PE NXA PDC 930W PI Specification Characteristic Nominal range 48 to 60 VDC nominal Range 40 to 60 V...

Страница 65: ...feet 0 7 m CAB C13 CBN 250 V 10 A 8 2 feet 2 5 m CAB 250V 10A AR Argentina 250 VAC 10 A 3112 plug 8 2 feet 2 5 m CAB 9K10A AU Australia 250 V 10 A 6 9 feet 2 1 m CAB 250V 10A BR Brazil 250 VAC 10 A CEE 7 7 plug 8 2 feet 2 5 m CAB 9K10A EU European Union 10 A 8 2 feet 2 5 m CAB IND 10A India Power Cord Jumper C13 C14 Connectors 6 6 feet 2 0 m CAB C13 C14 2M IN India 250 V 10 A 8 2 feet 2 5 m CAB 25...

Страница 66: ... except Argentina Brazil and Japan HVAC HVDCPowerCablesSupportedbyACI ModeandNX OSModeSwitches Photo Cord Set Description Part Number HVAC 2 foot 0 6 m cable with Saf D Grid and SD connectors 277V AC CAB HVAC SD 0 6M HVAC 6 6 foot 2 0 m cable with Saf D Grid and C14 use for up to 240 V connector 250V AC CAB HVAC C14 2M HVAC 2 foot 0 6 m cable with Saf D Grid and RT connector 277V AC CAB HVAC RT 0 ...

Страница 67: ...PDC 930W PE PI Regulatory Standards Compliance Specifications The following table lists the regulatory standards compliance for the switch Table 2 Regulatory Standards Compliance Safety and EMC Description Specification Products should comply with CE Markings according to directives 2004 108 EC and 2006 95 EC Regulatory compliance CAN CSA C22 2 No 60950 1 Second Edition EN 60950 1 Second Edition I...

Страница 68: ... 2 EN61000 3 3 KN22 Class A CNS13438 Class A EMC Emissions EN55024 CISPR24 EN300386 KN 61000 4 series EMC Immunity The product is RoH 6 compliant with exceptions for leaded ball grid array BGA balls and lead press fit connectors RoHS Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 60 System Specifications System Specifications ...

Страница 69: ...ctivated this LED to identify this switch in the chassis Flashing blue BCN This switch is not being identified Off The switch is operational Green STS The switch is booting up Flashing amber Temperature exceeds the minor alarm threshold Amber Temperature exceeds the major alarm threshold Red The switch is not receiving power Off Fans and power supply modules are operational Green ENV At least one ...

Страница 70: ...ff Power Supply LEDs The power supply LEDs are located on the left front portion of the power supply Combinations of states indicated by the Okay and Fault LEDs indicate the status for the module as shown in the following table Status LED LED Power supply is on and outputting power to the switch Off Green Power supply is connected to a power source but not outputting power to the switch power supp...

Страница 71: ... mount kit Rack mount brackets 2 Rack mount retainer brackets 2 Rack mount slider rails 2 Rack mount retainer clips 2 Phillips countersink screws 8 Flat head screws 4 1 Ground lug kit Two hole lug 1 M4 x 8 mm Phillips pan head screws 2 1 EAC Compliance document Not applicable 1 Hazardous substances list for customers in China Not applicable The following table lists and illustrates the console cab...

Страница 72: ...llustration 1 Rack mount kit Bottom support rails 2 Front mount brackets 2 Vent Bracket The following table lists and illustrates the vent bracket NXA ACC BAV4 You require the vent bracket NXA ACC BAV4 for NEBS Network Equipment Building System compliance only Note Quantity Description Illustration 1 Vent bracket Cisco Nexus 93360YC FX2 NX OS Mode Switch Hardware Installation Guide 64 Additional K...

Отзывы: