Date
Time
Verified By
Planning Activity
Task No.
Environmental evaluation:
•
Ambient temperature
•
Humidity
•
Altitude
•
Atmospheric
contamination
•
Air flow
2
Power Evaluation:
•
Input power type
•
Power receptacles
1
•
Receptacle proximity to
the equipment
•
Dedicated circuit for
power supply
•
Dedicated (separate)
circuits for redundant
power supplies
•
UPS
2
for power failures
3
Grounding evaluation:
•
Circuit breaker size
•
CO ground (AC-
powered systems)
4
Cable and interface
equipment evaluation:
•
Cable type
•
Connector type
•
Cable distance
limitations
•
Interface equipment
(transceivers)
5
Cisco MDS 9132T Fibre Channel Switch Hardware Installation Guide
74
Site Planning and Maintenance Records
Site Preparation Checklist