2-21
Cisco IE 3000 Switch Hardware Installation Guide
Chapter 2 Switch Installation
Verifying Switch Operation
Figure 2-15
Torquing the Power and Relay Connector Captive Screws
Step 7
Connect the other end of the positive wire (the one connected to V) to the positive terminal on the DC
power source, and connect the other end of the return wire (the one connected to RT) to the return
terminal on the DC power source.
When you are testing the switch, one power connection is sufficient. If you are installing the switch and
are using a second power source, repeat
through
using a second power and relay connector.
shows the completed DC-input wiring on a power and relay connector for a primary power
source and an optional secondary power source.
1
Power and relay connector captive screws
201
8
17
RT A
V
A
1
Содержание IE 3000
Страница 34: ...1 24 Cisco IE 3000 Switch Hardware Installation Guide Chapter 1 Overview Network Configurations ...
Страница 102: ...3 8 Cisco IE 3000 Switch Hardware Installation Guide Chapter 3 Troubleshooting Finding the Switch Serial Number ...
Страница 182: ...C 12 Cisco IE 3000 Switch Hardware Installation Guide Appendix C Cable and Connectors Cable and Adapter Specifications ...